16th November 2026
33,666Trains22,941 carrying passengers
88.3%On timeof those that arrived
2.4 minAverage delayat their last call
619Cancelledplanned ones included
1,090Part cancelledran for only part of the journey
539No arrival reportedstarted, then went quiet
0Stopped shortdid not reach the last stop
By operator least punctual first
| Operator | Tracked | On time | Late | Cancelled | Part cancelled | Average delay |
|---|---|---|---|---|---|---|
| Eurostar | 29 | 34.8% | 15 | 6 | 0 | 38 min |
| Grand Central | 20 | 45% | 11 | 0 | 0 | 9.8 min |
| London North Eastern Railway | 199 | 66.5% | 60 | 6 | 14 | 11.2 min |
| Avanti West Coast | 317 | 70.2% | 94 | 0 | 2 | 7.8 min |
| CrossCountry | 282 | 73.9% | 60 | 16 | 36 | 7.9 min |
| TransPennine Express | 314 | 74.8% | 74 | 5 | 15 | 6 min |
| London Underground | 193 | 79.4% | 26 | 66 | 1 | 2.2 min |
| Southeastern | 1,793 | 80.4% | 312 | 88 | 113 | 4.1 min |
| East Midlands Railway | 508 | 80.6% | 90 | 17 | 28 | 3.7 min |
| Great Northern | 398 | 84.2% | 57 | 15 | 23 | 3.2 min |
| Island Line | 66 | 85.1% | 7 | 27 | 0 | 19.1 min |
| Northern | 2,729 | 85.5% | 383 | 28 | 67 | 2.3 min |
| Elizabeth line | 697 | 87% | 84 | 23 | 27 | 1.9 min |
| c2c | 358 | 87.2% | 25 | 0 | 162 | 2.7 min |
| West Midlands Trains | 1,317 | 87.6% | 146 | 59 | 82 | 2.1 min |
| South Western Railway | 1,617 | 87.8% | 185 | 7 | 89 | 2.4 min |
| Transport for Wales | 1,060 | 88.7% | 114 | 11 | 43 | 1.9 min |
| Thameslink | 652 | 90.3% | 48 | 80 | 77 | 2 min |
| Southern | 1,691 | 90.5% | 147 | 47 | 94 | 2 min |
| Great Western Railway | 1,717 | 91.8% | 139 | 9 | 25 | 1.5 min |
| ScotRail | 2,272 | 91.9% | 176 | 39 | 64 | 1.8 min |
| Tyne and Wear Metro | 89 | 92% | 7 | 0 | 2 | 1.9 min |
| London Overground | 1,606 | 94.2% | 89 | 16 | 57 | 1.3 min |
| Greater Anglia | 1,272 | 95.1% | 62 | 0 | 2 | 0.6 min |
| Gatwick Express | 73 | 96.4% | 1 | 24 | 21 | 2.8 min |
| Merseyrail | 623 | 98.4% | 10 | 1 | 11 | on time |
| Chiltern Railways | 336 | 98.6% | 4 | 20 | 29 | 0.3 min |
| Heathrow Express | 152 | 100% | 0 | 0 | 0 | 0.1 min |
| South Yorkshire Supertram | 37 | 100% | 0 | 0 | 0 | 0.3 min |
Punctuality
| Trains | Ran | Arrived | On time | Average delay |
|---|---|---|---|---|
| Long distance (10 min) | 5,919 | 5,919 | 87.2% | 4 min |
| Other (5 min) | 14,856 | 14,856 | 88.7% | 1.7 min |
Cancellations
| Kind | Trains | Share |
|---|---|---|
| Attributed | 581 | 93.9% |
| Unexplained | 18 | 2.9% |
| Reported by National Rail | 11 | 1.8% |
| Planned | 9 | 1.5% |
Why most common first
| Reason | Code | Share |
|---|---|---|
| Cancelled at the freight operator's request, or planned not to run | FL | 17% (341) |
| Not investigated by Network Rail | OU | 10.7% (215) |
| Agreed in advance between Network Rail and the operator | PL | 9.9% (198) |
| Fatalities or injuries caused by being hit by train | XC | 9.4% (188) |
| The train due to form it arrived late | YI | 5.7% (115) |
| Trespass including non-intentional | XA | 5% (101) |
| Delays incurred on non-Network Rail running lines or networks including London Underground | TX | 4.5% (92) |
| Signalling functional power supply failure | IE | 4% (81) |
| Not yet investigated | ZW | 3.9% (80) |
| At the train operator's request | TB | 3% (62) |
| Points failure (including no fault found) | IB | 2.6% (53) |
| Train Describer/Panel/ARS/SSI/TDM/Remote Control failure | IF | 1.8% (36) |
| Power supply and distribution system failure | IH | 1.7% (34) |
| WTT Schedule or LTP process including incorrect simplifiers | QA | 1.5% (30) |
| Driver | TG | 1.4% (29) |
| Other technical failures below the solebar | MD | 1.3% (28) |
| Other technical failures (doors, body or interior) | M8 | 1.3% (26) |
| Depot operating problem | MU | 1.1% (22) |
| Structures - bridges, tunnels, buildings, retaining walls, sea defences | JD | 0.8% (17) |
| Cancellation of a duplicate or erroneous schedule or an identified duplicate, false or erroneous delay | PJ | 0.7% (15) |
| Brake and brake system faults including wheel flats | MN | 0.7% (15) |
| Time lost en-route believed to be Operator cause and information required from Operator | TO | 0.7% (15) |
| Confirmed train cab based safety system fault including GSM-R | M0 | 0.7% (15) |
| Track circuit failure (including no fault found) | IC | 0.5% (10) |
All trains in the network
| State | All | Passenger |
|---|---|---|
| Arrived | 28,704 | 21,569 |
| Planned | 2,417 | 64 |
| Cancelled | 2,006 | 921 |
| No arrival reported | 539 | 387 |