The railway on 17th September 2026

TrainTimesLive
Menu Close menu

17th September 2026

34,109Trains23,064 carrying passengers
90.2%On timeof those that arrived
2.1 minAverage delayat their last call
645Cancelledplanned ones included
738Part cancelledran for only part of the journey
1,512Never activatedbooked, and never appeared
0Stopped shortdid not reach the last stop

By operator least punctual first

OperatorTrackedOn time LateCancelledPart cancelledAverage delay
Eurostar 29 33.3% 18 2 0 23.2 min
Avanti West Coast 317 38.2% 157 59 4 16.9 min
London North Eastern Railway 199 75.4% 48 3 1 6.5 min
CrossCountry 280 77.5% 56 8 23 7 min
Great Northern 400 78.3% 83 1 17 4.1 min
c2c 350 79.8% 42 83 59 5.2 min
Southern 1,690 84.7% 230 47 148 3.3 min
Grand Central 20 85% 3 0 0 3.7 min
East Midlands Railway 502 86.8% 64 7 11 3 min
Thameslink 650 87.2% 72 20 66 2.9 min
South Western Railway 1,611 87.5% 183 59 86 2.9 min
Elizabeth line 696 88% 80 6 23 1.9 min
West Midlands Trains 1,327 89.9% 118 97 59 2 min
Great Western Railway 1,715 90.6% 157 27 20 1.7 min
TransPennine Express 298 90.9% 26 1 10 2.4 min
Gatwick Express 72 91.8% 4 18 5 4.2 min
Northern 2,709 92.3% 205 21 29 1.3 min
London Overground 1,604 92.6% 112 38 53 1.7 min
Southeastern 1,806 93.1% 123 10 17 1.6 min
Greater Anglia 1,306 93.5% 83 13 14 1.1 min
Transport for Wales 1,062 93.5% 64 19 60 1.2 min
Chiltern Railways 351 93.7% 22 0 2 0.8 min
London Underground 189 93.8% 9 44 0 0.8 min
ScotRail 2,279 95.8% 95 6 10 0.7 min
South Yorkshire Supertram 37 97.3% 1 0 0 0.4 min
Merseyrail 622 98.2% 11 3 14 0.5 min
Heathrow Express 152 100% 0 3 0 1.1 min
Tyne and Wear Metro 88 100% 0 2 1 0.5 min
Island Line 48 100% 0 0 0 0.2 min early

Punctuality

TrainsRan ArrivedOn time Average delay
Other (5 min) 15,085 15,085 91.2% 1.3 min
Long distance (10 min) 6,117 6,117 87.6% 4 min

Cancellations

KindTrains Share
Attributed 581 90.1%
Unexplained 41 6.4%
Reported by Darwin 12 1.9%
Planned 11 1.7%

Why most common first

ReasonCode Share
Train cancelled at FOC request or planned not to run FL 18.9% (354)
Delays not investigated by Network Rail OU 12.1% (226)
Exclusion commercially agreed and documented between Network Rail and Train Operator PL 6.9% (130)
Late arrival of booked inward stock YI 6.3% (118)
Signal failure (including no fault found) IA 4.3% (81)
Uninvestigated Cancellations System Roll-Ups only ZW 4.1% (76)
Broken/cracked/twisted/buckled/flawed rail IR 3.9% (74)
Track defects other than rail defects IS 3.3% (62)
Delays incurred on non-Network Rail running lines or networks including London Underground TX 3.2% (60)
Driver TG 2.7% (51)
Trespass including non-intentional XA 2.2% (42)
Late arrival of booked inward stock YI 2% (38)
Train cancelled or delayed at Train Operator's request TB 2% (38)
Other technical failures above the Solebar M8 1.4% (27)
Train-crew rostering problem TI 1.4% (26)
Trespass including non-intentional XA 1.2% (23)
Fatalities or injuries caused by being hit by train XC 1.2% (23)
Planned underpowered or shortformed service or vehicle MS 1.1% (21)
Uninvestigated Cancellations System Roll-Ups only ZW 1% (18)
Fires starting on Network Rail Infrastructure I9 1% (18)
Train cancelled or delayed at Train Operator's request TB 1% (18)
Other technical failures above the Solebar M8 0.9% (17)
Broken/cracked/twisted/buckled/flawed rail IR 0.8% (15)
Driver TG 0.7% (14)
Signal failure (including no fault found) IA 0.7% (14)
Other Passenger Train Operating Company causes TZ 0.7% (14)
Axle Counter Failure J3 0.7% (13)
Uninvestigated Late Start System Roll-Ups only ZX 0.7% (13)
Other technical failures below the solebar MD 0.7% (13)
Fires starting on Network Rail Infrastructure I9 0.6% (11)
Other technical failures below the solebar MD 0.6% (11)
Points failure (including no fault found) IB 0.6% (11)
Cancellation of a duplicate or erroneous schedule or an identified duplicate, false or erroneous delay PJ 0.5% (10)
Senior Conductor or Train Manager TH 0.5% (10)
Fatalities or injuries caused by being hit by train XC 0.5% (9)
Time lost en-route believed to be Operator cause and information required from Operator TO 0.5% (9)
Fatalities or injuries sustained whilst on a platform VC 0.4% (8)
Train cancelled at FOC request or planned not to run FL 0.4% (8)
Depot operating problem MU 0.4% (7)
Signal failure (including no fault found) IA 0.4% (7)

All trains in the network

StateAll Passenger
Arrived 28,108 21,705
Planned 2,615 65
Cancelled 1,874 893
Never activated 1,512 401