8th November 2026
18,276Trains13,163 carrying passengers
92.1%On timeof those that arrived
1.6 minAverage delayat their last call
369Cancelledplanned ones included
267Part cancelledran for only part of the journey
353No arrival reportedstarted, then went quiet
0Stopped shortdid not reach the last stop
By operator least punctual first
| Operator | Tracked | On time | Late | Cancelled | Part cancelled | Average delay |
|---|---|---|---|---|---|---|
| Eurostar | 27 | 57.7% | 11 | 1 | 0 | 12.2 min |
| London North Eastern Railway | 162 | 73% | 43 | 0 | 3 | 7.8 min |
| CrossCountry | 153 | 80.8% | 24 | 6 | 22 | 6.8 min |
| East Midlands Railway | 310 | 85.3% | 45 | 2 | 1 | 3.2 min |
| TransPennine Express | 300 | 87.3% | 36 | 1 | 15 | 3.2 min |
| South Western Railway | 995 | 87.4% | 121 | 21 | 13 | 2.8 min |
| Great Western Railway | 902 | 87.6% | 104 | 27 | 33 | 2.6 min |
| Avanti West Coast | 177 | 88.6% | 20 | 1 | 0 | 3.2 min |
| Southern | 857 | 88.9% | 93 | 4 | 16 | 2.2 min |
| Northern | 1,281 | 89.9% | 126 | 8 | 27 | 1.6 min |
| c2c | 147 | 90.6% | 12 | 13 | 7 | 2 min |
| West Midlands Trains | 666 | 92.5% | 48 | 19 | 6 | 1 min |
| ScotRail | 1,126 | 93.3% | 73 | 17 | 25 | 1.5 min |
| Great Northern | 241 | 94.3% | 13 | 0 | 11 | 0.8 min |
| Southeastern | 850 | 94.6% | 45 | 5 | 9 | 1.2 min |
| Transport for Wales | 654 | 94.9% | 33 | 2 | 6 | 0.8 min |
| Elizabeth line | 506 | 95.2% | 24 | 3 | 7 | 1.5 min |
| London Overground | 1,080 | 95.7% | 45 | 6 | 20 | 0.6 min |
| Thameslink | 459 | 95.8% | 18 | 15 | 18 | 1.2 min |
| Tyne and Wear Metro | 51 | 96.1% | 2 | 0 | 0 | 0.8 min |
| Heathrow Express | 151 | 97.2% | 4 | 2 | 4 | 0.4 min |
| Greater Anglia | 859 | 97.7% | 20 | 3 | 0 | 0.1 min early |
| Chiltern Railways | 193 | 98.4% | 3 | 0 | 1 | 0.1 min early |
| Gatwick Express | 72 | 98.6% | 1 | 0 | 0 | 0.2 min early |
| Merseyrail | 324 | 99.7% | 1 | 0 | 6 | 0.3 min early |
| South Yorkshire Supertram | 25 | 100% | 0 | 0 | 0 | 0.5 min |
Punctuality
| Trains | Ran | Arrived | On time | Average delay |
|---|---|---|---|---|
| Long distance (10 min) | 3,718 | 3,718 | 90.4% | 3.1 min |
| Other (5 min) | 8,494 | 8,494 | 92.8% | 1 min |
Cancellations
| Kind | Trains | Share |
|---|---|---|
| Attributed | 289 | 78.3% |
| Unexplained | 72 | 19.5% |
| Reported by National Rail | 7 | 1.9% |
| Planned | 1 | 0.3% |
Why most common first
| Reason | Code | Share |
|---|---|---|
| Delays incurred on non-Network Rail running lines or networks including London Underground | TX | 17.8% (174) |
| Agreed in advance between Network Rail and the operator | PL | 14.2% (138) |
| Not yet investigated | ZW | 13.4% (130) |
| Not investigated by Network Rail | OU | 12% (117) |
| Cancelled at the freight operator's request, or planned not to run | FL | 9.2% (90) |
| At the train operator's request | TB | 5.5% (54) |
| The train due to form it arrived late | YI | 5.1% (50) |
| Driver | TG | 4.4% (43) |
| Points failure (including no fault found) | IB | 2.4% (23) |
| Other technical failures (doors, body or interior) | M8 | 1.6% (16) |
| Senior Conductor or Train Manager | TH | 1.4% (14) |
| Overhead line/3rd rail defect | I1 | 1.3% (13) |
| Delays as a result of line blocks or track patrols including late handback | I6 | 1.1% (11) |
| Other technical failures below the solebar | MD | 0.9% (9) |
| Confirmed train cab based safety system fault including GSM-R | M0 | 0.9% (9) |
| Trespass including non-intentional | XA | 0.8% (8) |
| Uninvestigated Late Start System Roll-Ups only | ZX | 0.6% (6) |
| Level crossing faults and failure | ID | 0.4% (4) |
| Cancellation of a duplicate or erroneous schedule or an identified duplicate, false or erroneous delay | PJ | 0.4% (4) |
| WTT Schedule or LTP process including incorrect simplifiers | QA | 0.4% (4) |
| Train-crew rostering problem | TI | 0.3% (3) |
| Planned cancellation identified and agreed prior to 22.00 the day before the schedule runs | PG | 0.3% (3) |
| Other Passenger Train Operating Company causes | TZ | 0.3% (3) |
| Possession over-run from planned work | I5 | 0.3% (3) |
| Depot operating problem | MU | 0.3% (3) |
| Late presentation from the continent | TN | 0.2% (2) |
All trains in the network
| State | All | Passenger |
|---|---|---|
| Arrived | 16,451 | 12,382 |
| Cancelled | 974 | 470 |
| Planned | 498 | 32 |
| No arrival reported | 353 | 279 |