The railway on 7th November 2026

TrainTimesLive
Menu Close menu

7th November 2026

28,638Trains21,213 carrying passengers
89.4%On timeof those that arrived
2.1 minAverage delayat their last call
377Cancelledplanned ones included
673Part cancelledran for only part of the journey
589No arrival reportedstarted, then went quiet
4Stopped shortdid not reach the last stop

By operator least punctual first

OperatorTrackedOn time LateCancelledPart cancelledAverage delay
Eurostar 22 50% 11 0 0 7.5 min
London Underground 192 68.1% 36 77 2 5.1 min
Avanti West Coast 206 73.3% 55 0 0 8.1 min
CrossCountry 262 76.7% 56 7 15 7 min
South Western Railway 1,525 78% 318 8 68 4.2 min
London North Eastern Railway 191 79.5% 39 0 1 5.5 min
Great Northern 317 81.7% 54 9 13 3.4 min
East Midlands Railway 545 83.9% 84 12 11 3.7 min
Northern 2,668 84.2% 404 35 78 2.8 min
TransPennine Express 376 85.4% 54 2 3 4.2 min
Transport for Wales 1,080 85.5% 151 3 34 2.7 min
South Yorkshire Supertram 36 86.1% 5 0 0 2 min
Merseyrail 624 89.3% 64 4 23 1.4 min
Great Western Railway 1,639 90.4% 149 71 11 1.6 min
West Midlands Trains 1,201 91% 99 52 43 1.7 min
ScotRail 2,226 91.7% 179 22 41 2 min
London Overground 1,430 93.7% 86 34 38 1.4 min
Thameslink 600 94.6% 29 11 49 1.3 min
Tyne and Wear Metro 91 94.7% 4 14 1 1.9 min
Southeastern 1,456 94.8% 75 3 4 1.2 min
Southern 1,494 95.5% 66 6 22 1.1 min
Gatwick Express 72 95.8% 3 0 0 2.7 min
Chiltern Railways 226 96.4% 8 0 3 1 min
c2c 221 96.7% 7 2 6 0.3 min
Elizabeth line 665 97% 14 1 201 0.5 min
Greater Anglia 1,237 97.3% 33 4 5 0.1 min
Heathrow Express 152 100% 0 0 0 0.4 min

Punctuality

TrainsRan ArrivedOn time Average delay
Long distance (10 min) 5,927 5,926 89.6% 3.5 min
Other (5 min) 13,835 13,831 89.3% 1.6 min

Stopped short 4

Trains that reported movements and then did not reach the last station they were booked to.

TrainOperator Booked to reach
2R02 GW London Paddington
2R03 GW London Paddington
2R04 GW London Paddington
2R05 GW London Paddington

Inferred, not reported: TRUST sends no failure event. A train diverted or turned short on purpose looks the same as one that broke down, and neither announces itself. Passenger services only, and only where the train had already started.

Cancellations

KindTrains Share
Attributed 353 93.6%
Unexplained 18 4.8%
Reported by National Rail 4 1.1%
Planned 2 0.5%

Why most common first

ReasonCode Share
Cancelled at the freight operator's request, or planned not to run FL 17.3% (200)
Not investigated by Network Rail OU 13.3% (154)
Agreed in advance between Network Rail and the operator PL 11.4% (132)
The train due to form it arrived late YI 9.5% (109)
At the train operator's request TB 6.7% (77)
Delays incurred on non-Network Rail running lines or networks including London Underground TX 6.5% (75)
Not yet investigated ZW 5.7% (66)
Driver TG 5.1% (59)
Other technical failures below the solebar MD 3% (35)
Other technical failures (doors, body or interior) M8 1.9% (22)
Planned underpowered or shortformed service or vehicle MS 1.6% (18)
Depot operating problem MU 1.6% (18)
Fatalities or injuries caused by being hit by train XC 1.2% (14)
WTT Schedule or LTP process including incorrect simplifiers QA 1% (12)
Senior Conductor or Train Manager TH 1% (12)
Track circuit failure (including no fault found) IC 0.9% (11)
Uninvestigated Late Start System Roll-Ups only ZX 0.8% (9)
Animal Strike or Incursion within the control of Network Rail I8 0.7% (8)
Failure to maintain vegetation within network boundaries JP 0.6% (7)
External trees, buildings or structures encroaching or falling onto infrastructure XO 0.6% (7)
Train-crew rostering problem TI 0.6% (7)
Confirmed train cab based safety system fault including GSM-R M0 0.6% (7)
Other Passenger Train Operating Company causes TZ 0.5% (6)
Signaller including mis-routing OC 0.5% (6)
Points failure (including no fault found) IB 0.4% (5)
Trespass including non-intentional XA 0.3% (4)
Signal failure (including no fault found) IA 0.3% (3)
Disorder, drunks or trespass VA 0.3% (3)
Brake and brake system faults including wheel flats MN 0.3% (3)

All trains in the network

StateAll Passenger
Arrived 25,958 20,319
Cancelled 1,156 508
Planned 935 43
No arrival reported 589 343