The railway on 10th November 2026

TrainTimesLive
Menu Close menu

10th November 2026

33,841Trains22,819 carrying passengers
87.8%On timeof those that arrived
2.5 minAverage delayat their last call
424Cancelledplanned ones included
812Part cancelledran for only part of the journey
522No arrival reportedstarted, then went quiet
0Stopped shortdid not reach the last stop

By operator least punctual first

OperatorTrackedOn time LateCancelledPart cancelledAverage delay
London North Eastern Railway 213 55.3% 68 35 26 18.9 min
Avanti West Coast 318 60.6% 123 2 4 11.1 min
Eurostar 24 60.9% 9 1 0 11.4 min
CrossCountry 288 73.4% 64 8 39 8.5 min
TransPennine Express 321 75.5% 64 7 53 6.6 min
Northern 2,740 78.9% 542 57 115 3.7 min
Great Northern 402 82.2% 67 10 15 3.2 min
Southeastern 1,810 82.3% 303 21 80 3.4 min
c2c 269 84.2% 36 0 41 3.5 min
East Midlands Railway 508 84.3% 77 5 12 4 min
West Midlands Trains 1,313 86.4% 171 12 46 2.3 min
Thameslink 651 88% 74 8 27 2.4 min
Transport for Wales 1,076 88.8% 109 24 82 2.5 min
South Western Railway 1,611 90.1% 150 34 59 2.1 min
Southern 1,694 90.3% 160 8 44 2.1 min
Elizabeth line 697 90.7% 63 3 17 1.3 min
Great Western Railway 1,723 90.9% 153 30 13 1.7 min
Tyne and Wear Metro 104 91% 6 32 5 1.7 min
London Underground 215 91.1% 14 56 0 1.5 min
Gatwick Express 72 91.7% 6 0 0 3.1 min
London Overground 1,532 92.4% 108 43 67 1.5 min
Chiltern Railways 351 93.8% 21 1 11 0.9 min
ScotRail 2,270 94.8% 115 14 33 1.2 min
Greater Anglia 1,309 96.2% 49 5 10 0.7 min
Merseyrail 622 99% 6 1 5 0.1 min early
Heathrow Express 152 100% 0 0 0 0.1 min
South Yorkshire Supertram 37 100% 0 0 0 on time

Punctuality

TrainsRan ArrivedOn time Average delay
Other (5 min) 14,927 14,920 88.1% 1.8 min
Long distance (10 min) 6,228 6,227 87% 4.3 min

Cancellations

KindTrains Share
Attributed 380 89.6%
Unexplained 27 6.4%
Planned 9 2.1%
Reported by National Rail 8 1.9%

Why most common first

ReasonCode Share
Cancelled at the freight operator's request, or planned not to run FL 19.9% (326)
Not investigated by Network Rail OU 12.3% (202)
Agreed in advance between Network Rail and the operator PL 10.4% (170)
The train due to form it arrived late YI 8.6% (140)
Not yet investigated ZW 7% (114)
Overhead line/3rd rail defect I1 5.7% (94)
Delays incurred on non-Network Rail running lines or networks including London Underground TX 4% (65)
Track circuit failure (including no fault found) IC 2.6% (43)
Other technical failures (doors, body or interior) M8 2.4% (39)
At the train operator's request TB 2.2% (37)
Other Passenger Train Operating Company causes TZ 2.1% (34)
Driver TG 1.8% (30)
WTT Schedule or LTP process including incorrect simplifiers QA 1.5% (24)
Points failure (including no fault found) IB 1.5% (24)
Fatalities or injuries caused by being hit by train XC 1.4% (23)
Diesel loco failure, defect, attention MC 1.1% (17)
Time lost en-route believed to be Operator cause and information required from Operator TO 0.9% (15)
Other technical failures below the solebar MD 0.9% (15)
Failure to lay Sandite or operate Railhead Conditioning train as programmed OE 0.9% (14)
Cancellation of a duplicate or erroneous schedule or an identified duplicate, false or erroneous delay PJ 0.5% (8)
Senior Conductor or Train Manager TH 0.4% (7)
Brake and brake system faults including wheel flats MN 0.4% (7)
Disorder, drunks or trespass VA 0.4% (7)
No Cause Identified After Full Investigation by Both Parties ZU 0.4% (6)
Depot operating problem MU 0.4% (6)
Bridge Strike XP 0.4% (6)

All trains in the network

StateAll Passenger
Arrived 29,247 21,680
Planned 2,432 62
Cancelled 1,640 716
No arrival reported 522 361