11th November 2026
34,128Trains22,906 carrying passengers
89.5%On timeof those that arrived
2.3 minAverage delayat their last call
576Cancelledplanned ones included
900Part cancelledran for only part of the journey
532No arrival reportedstarted, then went quiet
0Stopped shortdid not reach the last stop
By operator least punctual first
| Operator | Tracked | On time | Late | Cancelled | Part cancelled | Average delay |
|---|---|---|---|---|---|---|
| London North Eastern Railway | 201 | 68.2% | 57 | 13 | 9 | 11.5 min |
| Eurostar | 22 | 68.2% | 7 | 0 | 0 | 9.7 min |
| TransPennine Express | 315 | 73.8% | 75 | 3 | 26 | 5.7 min |
| Great Northern | 402 | 74.3% | 75 | 50 | 61 | 4.7 min |
| CrossCountry | 281 | 81.7% | 49 | 4 | 9 | 6.2 min |
| East Midlands Railway | 509 | 82.5% | 84 | 10 | 18 | 4.2 min |
| Avanti West Coast | 317 | 83% | 53 | 3 | 3 | 6.6 min |
| Southern | 1,695 | 85% | 227 | 47 | 139 | 3.4 min |
| Northern | 2,737 | 85.2% | 383 | 33 | 113 | 2.6 min |
| Thameslink | 650 | 85.3% | 82 | 37 | 58 | 3.5 min |
| Elizabeth line | 697 | 86.9% | 76 | 54 | 66 | 2.5 min |
| Chiltern Railways | 342 | 87.5% | 41 | 2 | 11 | 2.4 min |
| Great Western Railway | 1,725 | 88% | 196 | 32 | 59 | 2.5 min |
| Tyne and Wear Metro | 89 | 88.1% | 10 | 3 | 2 | 2 min |
| Gatwick Express | 72 | 88.1% | 5 | 24 | 6 | 4.4 min |
| c2c | 366 | 88.3% | 38 | 15 | 27 | 2.4 min |
| Southeastern | 1,813 | 90.5% | 165 | 27 | 45 | 2.3 min |
| Transport for Wales | 1,055 | 91.5% | 80 | 31 | 83 | 1.6 min |
| West Midlands Trains | 1,317 | 92% | 103 | 17 | 14 | 1.3 min |
| London Underground | 214 | 92.3% | 12 | 58 | 1 | 1.1 min |
| ScotRail | 2,270 | 93.1% | 155 | 12 | 16 | 1.7 min |
| London Overground | 1,561 | 93.8% | 90 | 47 | 62 | 1.5 min |
| Greater Anglia | 1,305 | 95.7% | 55 | 8 | 31 | 0.7 min |
| South Western Railway | 1,612 | 96.1% | 63 | 2 | 12 | 0.8 min |
| Heathrow Express | 152 | 97.7% | 3 | 22 | 0 | 1.9 min |
| Merseyrail | 622 | 98.2% | 11 | 4 | 23 | on time |
| South Yorkshire Supertram | 43 | 100% | 0 | 12 | 1 | 0.2 min early |
Punctuality
| Trains | Ran | Arrived | On time | Average delay |
|---|---|---|---|---|
| Other (5 min) | 14,867 | 14,867 | 89.9% | 1.6 min |
| Long distance (10 min) | 6,113 | 6,113 | 88.6% | 4 min |
Cancellations
| Kind | Trains | Share |
|---|---|---|
| Attributed | 525 | 91.1% |
| Unexplained | 36 | 6.3% |
| Reported by National Rail | 9 | 1.6% |
| Planned | 6 | 1% |
Why most common first
| Reason | Code | Share |
|---|---|---|
| Cancelled at the freight operator's request, or planned not to run | FL | 16.7% (318) |
| Not investigated by Network Rail | OU | 12% (229) |
| Agreed in advance between Network Rail and the operator | PL | 9.4% (180) |
| Fatalities or injuries caused by being hit by train | XC | 9.4% (180) |
| The train due to form it arrived late | YI | 9.3% (176) |
| Not yet investigated | ZW | 6% (116) |
| Points failure (including no fault found) | IB | 5% (97) |
| Trespass including non-intentional | XA | 5% (95) |
| At the train operator's request | TB | 4.3% (83) |
| Delays incurred on non-Network Rail running lines or networks including London Underground | TX | 4% (76) |
| Other technical failures (doors, body or interior) | M8 | 1.2% (24) |
| Other technical failures below the solebar | MD | 1.3% (24) |
| Overhead line/3rd rail defect | I1 | 1.2% (23) |
| Fires starting on Network Rail Infrastructure | I9 | 1% (19) |
| WTT Schedule or LTP process including incorrect simplifiers | QA | 0.8% (15) |
| Passenger taken ill on train | VD | 0.8% (15) |
| Other Passenger Train Operating Company causes | TZ | 0.7% (14) |
| Broken/cracked/twisted/buckled/flawed rail | IR | 0.8% (14) |
| Driver | TG | 0.7% (13) |
| Time lost en-route believed to be Operator cause and information required from Operator | TO | 0.6% (12) |
| Disorder, drunks or trespass | VA | 0.5% (9) |
| Brake and brake system faults including wheel flats | MN | 0.4% (8) |
| Cancellation of a duplicate or erroneous schedule or an identified duplicate, false or erroneous delay | PJ | 0.4% (7) |
| Signal failure (including no fault found) | IA | 0.3% (6) |
| Planned underpowered or shortformed service or vehicle | MS | 0.3% (5) |
| Track circuit failure (including no fault found) | IC | 0.3% (5) |
All trains in the network
| State | All | Passenger |
|---|---|---|
| Arrived | 29,125 | 21,582 |
| Planned | 2,564 | 69 |
| Cancelled | 1,907 | 887 |
| No arrival reported | 532 | 368 |