The railway on 11th November 2026

TrainTimesLive
Menu Close menu

11th November 2026

34,128Trains22,906 carrying passengers
89.5%On timeof those that arrived
2.3 minAverage delayat their last call
576Cancelledplanned ones included
900Part cancelledran for only part of the journey
532No arrival reportedstarted, then went quiet
0Stopped shortdid not reach the last stop

By operator least punctual first

OperatorTrackedOn time LateCancelledPart cancelledAverage delay
London North Eastern Railway 201 68.2% 57 13 9 11.5 min
Eurostar 22 68.2% 7 0 0 9.7 min
TransPennine Express 315 73.8% 75 3 26 5.7 min
Great Northern 402 74.3% 75 50 61 4.7 min
CrossCountry 281 81.7% 49 4 9 6.2 min
East Midlands Railway 509 82.5% 84 10 18 4.2 min
Avanti West Coast 317 83% 53 3 3 6.6 min
Southern 1,695 85% 227 47 139 3.4 min
Northern 2,737 85.2% 383 33 113 2.6 min
Thameslink 650 85.3% 82 37 58 3.5 min
Elizabeth line 697 86.9% 76 54 66 2.5 min
Chiltern Railways 342 87.5% 41 2 11 2.4 min
Great Western Railway 1,725 88% 196 32 59 2.5 min
Tyne and Wear Metro 89 88.1% 10 3 2 2 min
Gatwick Express 72 88.1% 5 24 6 4.4 min
c2c 366 88.3% 38 15 27 2.4 min
Southeastern 1,813 90.5% 165 27 45 2.3 min
Transport for Wales 1,055 91.5% 80 31 83 1.6 min
West Midlands Trains 1,317 92% 103 17 14 1.3 min
London Underground 214 92.3% 12 58 1 1.1 min
ScotRail 2,270 93.1% 155 12 16 1.7 min
London Overground 1,561 93.8% 90 47 62 1.5 min
Greater Anglia 1,305 95.7% 55 8 31 0.7 min
South Western Railway 1,612 96.1% 63 2 12 0.8 min
Heathrow Express 152 97.7% 3 22 0 1.9 min
Merseyrail 622 98.2% 11 4 23 on time
South Yorkshire Supertram 43 100% 0 12 1 0.2 min early

Punctuality

TrainsRan ArrivedOn time Average delay
Other (5 min) 14,867 14,867 89.9% 1.6 min
Long distance (10 min) 6,113 6,113 88.6% 4 min

Cancellations

KindTrains Share
Attributed 525 91.1%
Unexplained 36 6.3%
Reported by National Rail 9 1.6%
Planned 6 1%

Why most common first

ReasonCode Share
Cancelled at the freight operator's request, or planned not to run FL 16.7% (318)
Not investigated by Network Rail OU 12% (229)
Agreed in advance between Network Rail and the operator PL 9.4% (180)
Fatalities or injuries caused by being hit by train XC 9.4% (180)
The train due to form it arrived late YI 9.3% (176)
Not yet investigated ZW 6% (116)
Points failure (including no fault found) IB 5% (97)
Trespass including non-intentional XA 5% (95)
At the train operator's request TB 4.3% (83)
Delays incurred on non-Network Rail running lines or networks including London Underground TX 4% (76)
Other technical failures (doors, body or interior) M8 1.2% (24)
Other technical failures below the solebar MD 1.3% (24)
Overhead line/3rd rail defect I1 1.2% (23)
Fires starting on Network Rail Infrastructure I9 1% (19)
WTT Schedule or LTP process including incorrect simplifiers QA 0.8% (15)
Passenger taken ill on train VD 0.8% (15)
Other Passenger Train Operating Company causes TZ 0.7% (14)
Broken/cracked/twisted/buckled/flawed rail IR 0.8% (14)
Driver TG 0.7% (13)
Time lost en-route believed to be Operator cause and information required from Operator TO 0.6% (12)
Disorder, drunks or trespass VA 0.5% (9)
Brake and brake system faults including wheel flats MN 0.4% (8)
Cancellation of a duplicate or erroneous schedule or an identified duplicate, false or erroneous delay PJ 0.4% (7)
Signal failure (including no fault found) IA 0.3% (6)
Planned underpowered or shortformed service or vehicle MS 0.3% (5)
Track circuit failure (including no fault found) IC 0.3% (5)

All trains in the network

StateAll Passenger
Arrived 29,125 21,582
Planned 2,564 69
Cancelled 1,907 887
No arrival reported 532 368