10th November 2026
33,841Trains22,819 carrying passengers
87.8%On timeof those that arrived
2.5 minAverage delayat their last call
424Cancelledplanned ones included
812Part cancelledran for only part of the journey
522No arrival reportedstarted, then went quiet
0Stopped shortdid not reach the last stop
By operator least punctual first
| Operator | Tracked | On time | Late | Cancelled | Part cancelled | Average delay |
|---|---|---|---|---|---|---|
| London North Eastern Railway | 213 | 55.3% | 68 | 35 | 26 | 18.9 min |
| Avanti West Coast | 318 | 60.6% | 123 | 2 | 4 | 11.1 min |
| Eurostar | 24 | 60.9% | 9 | 1 | 0 | 11.4 min |
| CrossCountry | 288 | 73.4% | 64 | 8 | 39 | 8.5 min |
| TransPennine Express | 321 | 75.5% | 64 | 7 | 53 | 6.6 min |
| Northern | 2,740 | 78.9% | 542 | 57 | 115 | 3.7 min |
| Great Northern | 402 | 82.2% | 67 | 10 | 15 | 3.2 min |
| Southeastern | 1,810 | 82.3% | 303 | 21 | 80 | 3.4 min |
| c2c | 269 | 84.2% | 36 | 0 | 41 | 3.5 min |
| East Midlands Railway | 508 | 84.3% | 77 | 5 | 12 | 4 min |
| West Midlands Trains | 1,313 | 86.4% | 171 | 12 | 46 | 2.3 min |
| Thameslink | 651 | 88% | 74 | 8 | 27 | 2.4 min |
| Transport for Wales | 1,076 | 88.8% | 109 | 24 | 82 | 2.5 min |
| South Western Railway | 1,611 | 90.1% | 150 | 34 | 59 | 2.1 min |
| Southern | 1,694 | 90.3% | 160 | 8 | 44 | 2.1 min |
| Elizabeth line | 697 | 90.7% | 63 | 3 | 17 | 1.3 min |
| Great Western Railway | 1,723 | 90.9% | 153 | 30 | 13 | 1.7 min |
| Tyne and Wear Metro | 104 | 91% | 6 | 32 | 5 | 1.7 min |
| London Underground | 215 | 91.1% | 14 | 56 | 0 | 1.5 min |
| Gatwick Express | 72 | 91.7% | 6 | 0 | 0 | 3.1 min |
| London Overground | 1,532 | 92.4% | 108 | 43 | 67 | 1.5 min |
| Chiltern Railways | 351 | 93.8% | 21 | 1 | 11 | 0.9 min |
| ScotRail | 2,270 | 94.8% | 115 | 14 | 33 | 1.2 min |
| Greater Anglia | 1,309 | 96.2% | 49 | 5 | 10 | 0.7 min |
| Merseyrail | 622 | 99% | 6 | 1 | 5 | 0.1 min early |
| Heathrow Express | 152 | 100% | 0 | 0 | 0 | 0.1 min |
| South Yorkshire Supertram | 37 | 100% | 0 | 0 | 0 | on time |
Punctuality
| Trains | Ran | Arrived | On time | Average delay |
|---|---|---|---|---|
| Other (5 min) | 14,927 | 14,920 | 88.1% | 1.8 min |
| Long distance (10 min) | 6,228 | 6,227 | 87% | 4.3 min |
Cancellations
| Kind | Trains | Share |
|---|---|---|
| Attributed | 380 | 89.6% |
| Unexplained | 27 | 6.4% |
| Planned | 9 | 2.1% |
| Reported by National Rail | 8 | 1.9% |
Why most common first
| Reason | Code | Share |
|---|---|---|
| Cancelled at the freight operator's request, or planned not to run | FL | 19.9% (326) |
| Not investigated by Network Rail | OU | 12.3% (202) |
| Agreed in advance between Network Rail and the operator | PL | 10.4% (170) |
| The train due to form it arrived late | YI | 8.6% (140) |
| Not yet investigated | ZW | 7% (114) |
| Overhead line/3rd rail defect | I1 | 5.7% (94) |
| Delays incurred on non-Network Rail running lines or networks including London Underground | TX | 4% (65) |
| Track circuit failure (including no fault found) | IC | 2.6% (43) |
| Other technical failures (doors, body or interior) | M8 | 2.4% (39) |
| At the train operator's request | TB | 2.2% (37) |
| Other Passenger Train Operating Company causes | TZ | 2.1% (34) |
| Driver | TG | 1.8% (30) |
| WTT Schedule or LTP process including incorrect simplifiers | QA | 1.5% (24) |
| Points failure (including no fault found) | IB | 1.5% (24) |
| Fatalities or injuries caused by being hit by train | XC | 1.4% (23) |
| Diesel loco failure, defect, attention | MC | 1.1% (17) |
| Time lost en-route believed to be Operator cause and information required from Operator | TO | 0.9% (15) |
| Other technical failures below the solebar | MD | 0.9% (15) |
| Failure to lay Sandite or operate Railhead Conditioning train as programmed | OE | 0.9% (14) |
| Cancellation of a duplicate or erroneous schedule or an identified duplicate, false or erroneous delay | PJ | 0.5% (8) |
| Senior Conductor or Train Manager | TH | 0.4% (7) |
| Brake and brake system faults including wheel flats | MN | 0.4% (7) |
| Disorder, drunks or trespass | VA | 0.4% (7) |
| No Cause Identified After Full Investigation by Both Parties | ZU | 0.4% (6) |
| Depot operating problem | MU | 0.4% (6) |
| Bridge Strike | XP | 0.4% (6) |
All trains in the network
| State | All | Passenger |
|---|---|---|
| Arrived | 29,247 | 21,680 |
| Planned | 2,432 | 62 |
| Cancelled | 1,640 | 716 |
| No arrival reported | 522 | 361 |