12th November 2026
34,118Trains22,972 carrying passengers
87.9%On timeof those that arrived
2.5 minAverage delayat their last call
481Cancelledplanned ones included
938Part cancelledran for only part of the journey
596No arrival reportedstarted, then went quiet
0Stopped shortdid not reach the last stop
By operator least punctual first
| Operator | Tracked | On time | Late | Cancelled | Part cancelled | Average delay |
|---|---|---|---|---|---|---|
| Eurostar | 26 | 52% | 12 | 0 | 0 | 23.5 min |
| Gatwick Express | 71 | 76.4% | 13 | 15 | 1 | 7.8 min |
| London Underground | 188 | 78.3% | 33 | 35 | 1 | 2.6 min |
| Avanti West Coast | 317 | 78.5% | 68 | 0 | 0 | 6.9 min |
| Thameslink | 651 | 78.7% | 109 | 64 | 76 | 4.7 min |
| Great Northern | 402 | 78.9% | 76 | 13 | 29 | 3.4 min |
| TransPennine Express | 317 | 79.3% | 62 | 0 | 17 | 4.7 min |
| London North Eastern Railway | 200 | 79.9% | 40 | 0 | 1 | 5.2 min |
| Lumo | 22 | 80% | 4 | 1 | 1 | 8.3 min |
| CrossCountry | 285 | 80.1% | 52 | 5 | 19 | 6 min |
| Northern | 2,747 | 80.2% | 500 | 71 | 151 | 3.4 min |
| Chiltern Railways | 342 | 81.8% | 52 | 31 | 25 | 3.6 min |
| Southern | 1,699 | 85.1% | 231 | 47 | 98 | 3.6 min |
| East Midlands Railway | 508 | 86% | 70 | 0 | 7 | 3 min |
| Southeastern | 1,811 | 88.4% | 205 | 10 | 33 | 2.5 min |
| Elizabeth line | 695 | 88.4% | 77 | 6 | 24 | 1.9 min |
| Transport for Wales | 1,057 | 89.8% | 95 | 23 | 99 | 2.2 min |
| West Midlands Trains | 1,320 | 90.4% | 118 | 15 | 70 | 1.9 min |
| London Overground | 1,600 | 90.6% | 136 | 48 | 108 | 1.8 min |
| South Western Railway | 1,610 | 91% | 139 | 19 | 42 | 1.9 min |
| Great Western Railway | 1,724 | 91.6% | 140 | 35 | 31 | 1.9 min |
| ScotRail | 2,270 | 92.3% | 173 | 10 | 20 | 1.7 min |
| South Yorkshire Supertram | 40 | 92.5% | 3 | 0 | 0 | 0.9 min |
| Greater Anglia | 1,307 | 93.6% | 79 | 25 | 43 | 1.2 min |
| c2c | 367 | 93.7% | 21 | 1 | 34 | 1.8 min |
| Merseyrail | 622 | 97.4% | 16 | 6 | 7 | 0.3 min |
| Tyne and Wear Metro | 88 | 97.7% | 2 | 0 | 0 | 0.9 min |
| Heathrow Express | 152 | 98% | 3 | 0 | 0 | 0.9 min |
Punctuality
| Trains | Ran | Arrived | On time | Average delay |
|---|---|---|---|---|
| Other (5 min) | 14,934 | 14,933 | 88.2% | 1.8 min |
| Long distance (10 min) | 6,140 | 6,139 | 87.3% | 4.3 min |
Cancellations
| Kind | Trains | Share |
|---|---|---|
| Attributed | 446 | 92.7% |
| Unexplained | 33 | 6.9% |
| Planned | 1 | 0.2% |
| Reported by National Rail | 1 | 0.2% |
Why most common first
| Reason | Code | Share |
|---|---|---|
| Cancelled at the freight operator's request, or planned not to run | FL | 17.1% (305) |
| Not investigated by Network Rail | OU | 12.7% (226) |
| The train due to form it arrived late | YI | 9.3% (165) |
| Trespass including non-intentional | XA | 9.2% (164) |
| Agreed in advance between Network Rail and the operator | PL | 8% (142) |
| Not yet investigated | ZW | 5.9% (104) |
| Points failure (including no fault found) | IB | 5.6% (99) |
| At the train operator's request | TB | 4.7% (83) |
| Delays incurred on non-Network Rail running lines or networks including London Underground | TX | 3.1% (55) |
| Axle Counter Failure | J3 | 2.3% (40) |
| Other technical failures below the solebar | MD | 1.6% (30) |
| Track circuit failure (including no fault found) | IC | 1.5% (26) |
| Driver | TG | 1.3% (23) |
| Other technical failures (doors, body or interior) | M8 | 1.2% (21) |
| Fatalities or injuries caused by being hit by train | XC | 0.9% (16) |
| Time lost en-route believed to be Operator cause and information required from Operator | TO | 0.7% (13) |
| WTT Schedule or LTP process including incorrect simplifiers | QA | 0.7% (13) |
| Train-crew rostering problem | TI | 0.7% (13) |
| Brake and brake system faults including wheel flats | MN | 0.6% (11) |
| Door and Door system faults | M7 | 0.6% (11) |
| Depot operating problem | MU | 0.5% (9) |
| Senior Conductor or Train Manager | TH | 0.4% (8) |
| Track defects other than rail defects | IS | 0.4% (8) |
| Planned underpowered or shortformed service or vehicle | MS | 0.4% (8) |
| Other freight operator causes including mishaps | FZ | 0.4% (8) |
| Cancellation of a duplicate or erroneous schedule or an identified duplicate, false or erroneous delay | PJ | 0.4% (8) |
| Confirmed train cab based safety system fault including GSM-R | M0 | 0.3% (6) |
All trains in the network
| State | All | Passenger |
|---|---|---|
| Arrived | 29,206 | 21,673 |
| Planned | 2,532 | 70 |
| Cancelled | 1,784 | 826 |
| No arrival reported | 596 | 403 |