The railway on 14th November 2026

TrainTimesLive
Menu Close menu

14th November 2026

28,697Trains21,048 carrying passengers
86.5%On timeof those that arrived
2.7 minAverage delayat their last call
456Cancelledplanned ones included
725Part cancelledran for only part of the journey
761No arrival reportedstarted, then went quiet
0Stopped shortdid not reach the last stop

By operator least punctual first

OperatorTrackedOn time LateCancelledPart cancelledAverage delay
Avanti West Coast 291 46.3% 139 11 18 12.8 min
Eurostar 26 68% 8 1 0 8.7 min
London North Eastern Railway 192 70.7% 54 1 6 8.1 min
East Midlands Railway 552 72.9% 138 20 17 5.3 min
CrossCountry 265 76.2% 53 8 34 7.7 min
Lumo 22 77.3% 5 0 0 6.8 min
Northern 2,669 78.1% 528 79 155 3.5 min
Transport for Wales 1,075 80.2% 190 7 97 3.5 min
Great Western Railway 1,600 81.9% 272 60 24 3.1 min
Gatwick Express 72 82.9% 12 0 2 5.6 min
Southeastern 1,117 84.3% 166 4 40 3.5 min
TransPennine Express 362 85.6% 49 2 19 3.9 min
West Midlands Trains 1,234 86.1% 149 74 81 2.5 min
South Yorkshire Supertram 36 86.1% 5 0 0 2.2 min
c2c 288 86.4% 37 2 10 1.9 min
Great Northern 316 88.6% 34 3 8 2.1 min
Tyne and Wear Metro 85 89% 9 2 0 1.7 min
South Western Railway 1,498 89.1% 157 27 20 2.2 min
London Underground 185 89.1% 14 55 2 2 min
Thameslink 601 89.9% 58 3 17 2.4 min
Southern 1,458 91.1% 125 7 37 2.2 min
ScotRail 2,225 91.6% 180 23 42 2 min
London Overground 1,526 92.3% 108 48 61 1.5 min
Chiltern Railways 227 93% 15 6 5 1.8 min
Greater Anglia 1,167 96.5% 40 3 4 0.3 min
Elizabeth line 665 96.8% 21 0 8 0.4 min
Merseyrail 623 97.6% 14 9 18 0.4 min
Heathrow Express 152 98% 3 0 0 0.3 min

Punctuality

TrainsRan ArrivedOn time Average delay
Other (5 min) 13,679 13,524 86.8% 2 min
Long distance (10 min) 5,703 5,660 85.7% 4.4 min

Cancellations

KindTrains Share
Attributed 412 90.4%
Unexplained 26 5.7%
Reported by National Rail 17 3.7%
Planned 1 0.2%

Why most common first

ReasonCode Share
Not investigated by Network Rail OU 14.3% (187)
Cancelled at the freight operator's request, or planned not to run FL 13.8% (180)
The train due to form it arrived late YI 11% (144)
Points failure (including no fault found) IB 9% (119)
Driver TG 6.6% (87)
Agreed in advance between Network Rail and the operator PL 5.9% (77)
Not yet investigated ZW 5.5% (72)
At the train operator's request TB 5.4% (71)
Delays incurred on non-Network Rail running lines or networks including London Underground TX 4.4% (58)
Other technical failures below the solebar MD 3.6% (47)
Other technical failures (doors, body or interior) M8 1.9% (25)
Senior Conductor or Train Manager TH 1.6% (21)
Depot operating problem MU 1.1% (14)
Time lost en-route believed to be Operator cause and information required from Operator TO 1% (13)
No Cause Identified After Full Investigation by Both Parties ZU 0.8% (11)
Track circuit failure (including no fault found) IC 0.8% (11)
Animal Strike or Incursion within the control of Network Rail I8 0.8% (10)
Brake and brake system faults including wheel flats MN 0.8% (10)
Other Passenger Train Operating Company causes TZ 0.5% (6)
Delay due to incorrect ETCS system or equipment operation by Driver TS 0.5% (6)
Other freight operator causes including mishaps FZ 0.5% (6)
Late presentation from the continent TN 0.5% (6)
Train-crew rostering problem TI 0.4% (5)
Axle Counter Failure J3 0.4% (5)
Trespass including non-intentional XA 0.4% (5)
Electric loco failure, defect, attention MB 0.4% (5)
Planned cancellation identified and agreed prior to 22.00 the day before the schedule runs PG 0.4% (5)
Not in the published list MG 0.3% (4)
Door and Door system faults M7 0.3% (4)

All trains in the network

StateAll Passenger
Arrived 25,586 19,873
Cancelled 1,311 691
Planned 1,039 67
No arrival reported 761 417