The railway on 15th November 2026

TrainTimesLive
Menu Close menu

15th November 2026

18,004Trains13,086 carrying passengers
88.8%On timeof those that arrived
2.3 minAverage delayat their last call
442Cancelledplanned ones included
462Part cancelledran for only part of the journey
444No arrival reportedstarted, then went quiet
0Stopped shortdid not reach the last stop

By operator least punctual first

OperatorTrackedOn time LateCancelledPart cancelledAverage delay
Eurostar 27 55.6% 12 0 0 11.6 min
Avanti West Coast 225 56.9% 93 4 5 13.6 min
London North Eastern Railway 168 79.1% 28 5 29 7.6 min
Tyne and Wear Metro 65 79.4% 13 2 0 3.3 min
Northern 1,233 82% 211 13 45 3.1 min
London Underground 185 83.5% 14 95 5 2.5 min
West Midlands Trains 640 84.3% 96 6 23 2.6 min
Great Western Railway 898 86% 118 27 30 2.6 min
CrossCountry 164 86.8% 15 21 29 5.5 min
Thameslink 533 87.2% 37 167 76 1.9 min
Southern 924 88.1% 105 9 32 2.6 min
ScotRail 1,121 89.4% 114 13 35 1.9 min
East Midlands Railway 311 89.5% 31 7 8 2.6 min
Southeastern 799 90.5% 75 0 9 2.1 min
London Overground 1,135 90.7% 98 30 54 1.5 min
Transport for Wales 701 90.8% 63 3 14 2.1 min
Gatwick Express 72 91.7% 6 0 0 1.2 min
South Western Railway 740 91.9% 59 3 7 2.1 min
TransPennine Express 309 93% 20 14 9 1.3 min
c2c 147 93.8% 9 0 1 1.5 min
Elizabeth line 509 94.5% 27 1 19 0.7 min
Great Northern 246 94.6% 13 2 2 0.9 min
Greater Anglia 823 95.8% 34 4 6 0.4 min
Chiltern Railways 193 96.3% 7 0 3 0.5 min
Merseyrail 320 99% 3 1 13 0.4 min early
Heathrow Express 151 100% 0 0 0 0.1 min
South Yorkshire Supertram 25 100% 0 0 0 0.3 min early

Punctuality

TrainsRan ArrivedOn time Average delay
Long distance (10 min) 3,622 3,622 88.5% 3.8 min
Other (5 min) 8,214 8,214 89% 1.6 min

Cancellations

KindTrains Share
Attributed 405 91.6%
Unexplained 18 4.1%
Reported by National Rail 15 3.4%
Planned 4 0.9%

Why most common first

ReasonCode Share
Not investigated by Network Rail OU 12.6% (141)
Agreed in advance between Network Rail and the operator PL 12% (134)
Structures - bridges, tunnels, buildings, retaining walls, sea defences JD 10.7% (120)
External trees, buildings or structures encroaching or falling onto infrastructure XO 10.3% (115)
Delays incurred on non-Network Rail running lines or networks including London Underground TX 7.9% (88)
Cancelled at the freight operator's request, or planned not to run FL 7.1% (79)
The train due to form it arrived late YI 5% (56)
Overhead line/3rd rail defect I1 4.4% (49)
Possession over-run from planned work I5 3.7% (42)
Not yet investigated ZW 3.3% (37)
At the train operator's request TB 3.1% (34)
Driver TG 2.4% (27)
Other technical failures (doors, body or interior) M8 1.5% (17)
Uninvestigated Loss in Running System Roll-Up only ZZ 1.3% (15)
Engineer's on-track equipment failure outside possession MV 1.3% (15)
Uninvestigated Late Start System Roll-Ups only ZX 0.8% (9)
Other technical failures below the solebar MD 0.8% (9)
Other Passenger Train Operating Company causes TZ 0.7% (8)
Animal Strike or Incursion within the control of Network Rail I8 0.7% (8)
Track circuit failure (including no fault found) IC 0.6% (7)
Points failure (including no fault found) IB 0.6% (7)
Depot operating problem MU 0.5% (6)
Confirmed train cab based safety system fault including GSM-R M0 0.4% (5)
Time lost en-route believed to be Operator cause and information required from Operator TO 0.4% (5)
Cancellation of a duplicate or erroneous schedule or an identified duplicate, false or erroneous delay PJ 0.4% (5)
Trespass including non-intentional XA 0.4% (4)
Planned underpowered or shortformed service or vehicle MS 0.4% (4)

All trains in the network

StateAll Passenger
Arrived 15,950 12,120
Cancelled 1,112 611
Planned 498 40
No arrival reported 444 315