The railway on 19th November 2026

TrainTimesLive
Menu Close menu

19th November 2026

34,324Trains23,080 carrying passengers
89%On timeof those that arrived
2.4 minAverage delayat their last call
550Cancelledplanned ones included
847Part cancelledran for only part of the journey
763No arrival reportedstarted, then went quiet
0Stopped shortdid not reach the last stop

By operator least punctual first

OperatorTrackedOn time LateCancelledPart cancelledAverage delay
London North Eastern Railway 199 38.2% 84 42 21 38.2 min
Eurostar 26 53.8% 12 0 0 8.6 min
TransPennine Express 325 62.6% 96 9 59 9.2 min
CrossCountry 286 67.4% 74 10 49 11.1 min
Avanti West Coast 318 76.4% 74 1 3 7.4 min
c2c 370 79.7% 47 95 45 4.5 min
Northern 2,737 82.2% 457 51 124 3.2 min
Thameslink 654 86.5% 72 63 73 3.1 min
Southeastern 1,804 86.8% 232 13 28 2.6 min
East Midlands Railway 506 87.7% 60 2 17 3 min
Great Northern 402 89.1% 37 22 42 2.3 min
West Midlands Trains 1,319 89.2% 137 14 35 1.9 min
Great Western Railway 1,712 89.3% 176 19 42 2.1 min
Gatwick Express 72 90.3% 6 4 6 3 min
South Western Railway 1,609 91% 142 4 29 1.8 min
Elizabeth line 695 91.3% 58 6 19 1.4 min
London Underground 181 91.6% 13 26 0 1.4 min
ScotRail 2,290 92% 170 85 81 1.6 min
London Overground 1,614 93.3% 104 7 53 1.4 min
Transport for Wales 1,062 93.3% 67 15 46 1.2 min
Southern 1,699 93.5% 106 31 41 1.5 min
Greater Anglia 1,308 95.5% 57 11 18 0.5 min
Heathrow Express 152 95.9% 6 4 1 1.4 min
Tyne and Wear Metro 88 96.5% 3 2 1 1.1 min
South Yorkshire Supertram 39 97.4% 1 0 0 1.2 min
Chiltern Railways 340 98.2% 6 0 0 0.1 min
Island Line 66 98.5% 1 4 0 0.2 min
Merseyrail 622 98.7% 8 4 3 0.2 min early

Punctuality

TrainsRan ArrivedOn time Average delay
Long distance (10 min) 6,054 6,048 87.3% 4.6 min
Other (5 min) 15,113 15,112 89.7% 1.5 min

Cancellations

KindTrains Share
Attributed 480 87.3%
Unexplained 44 8%
Reported by National Rail 18 3.3%
Planned 8 1.5%

Why most common first

ReasonCode Share
Cancelled at the freight operator's request, or planned not to run FL 20.3% (368)
Not investigated by Network Rail OU 10.7% (194)
Agreed in advance between Network Rail and the operator PL 10% (182)
Fatalities or injuries caused by being hit by train XC 8.1% (147)
Not yet investigated ZW 6.9% (126)
The train due to form it arrived late YI 5.7% (103)
AC/DC trip (including no fault or cause found) I2 4.7% (86)
Power supply and distribution system failure IH 3.9% (71)
At the train operator's request TB 3.6% (65)
Confirmed Pantograph ADD, shoe beam or associated system faults M1 3.4% (62)
Delays incurred on non-Network Rail running lines or networks including London Underground TX 1.7% (30)
Other technical failures (doors, body or interior) M8 1.6% (30)
Driver TG 1.4% (25)
Other technical failures below the solebar MD 1.3% (23)
Overhead line/3rd rail defect I1 1% (18)
Points failure (including no fault found) IB 0.8% (14)
Brake and brake system faults including wheel flats MN 0.6% (11)
Time lost en-route believed to be Operator cause and information required from Operator TO 0.6% (11)
Cancellation of a duplicate or erroneous schedule or an identified duplicate, false or erroneous delay PJ 0.5% (9)
Confirmed train cab based safety system fault including GSM-R M0 0.5% (9)
Train-crew rostering problem TI 0.5% (9)
Planned underpowered or shortformed service or vehicle MS 0.5% (9)
Senior Conductor or Train Manager TH 0.5% (9)
Depot operating problem MU 0.4% (8)
Train Describer/Panel/ARS/SSI/TDM/Remote Control failure IF 0.4% (8)
Level crossing faults and failure ID 0.4% (7)
WTT Schedule or LTP process including incorrect simplifiers QA 0.4% (7)
Possession over-run from planned work I5 0.3% (6)

All trains in the network

StateAll Passenger
Arrived 29,144 21,732
Planned 2,498 64
Cancelled 1,813 842
No arrival reported 763 409
En route 106 33