18th November 2026
34,148Trains23,006 carrying passengers
91.9%On timeof those that arrived
1.7 minAverage delayat their last call
248Cancelledplanned ones included
512Part cancelledran for only part of the journey
539No arrival reportedstarted, then went quiet
0Stopped shortdid not reach the last stop
By operator least punctual first
| Operator | Tracked | On time | Late | Cancelled | Part cancelled | Average delay |
|---|---|---|---|---|---|---|
| CrossCountry | 287 | 72.5% | 67 | 15 | 28 | 8.6 min |
| Eurostar | 24 | 75% | 6 | 0 | 0 | 4.2 min |
| Avanti West Coast | 317 | 76% | 75 | 0 | 4 | 7.3 min |
| Lumo | 21 | 80% | 4 | 0 | 1 | 5.4 min |
| Grand Central | 20 | 80% | 4 | 0 | 0 | 4.8 min |
| London North Eastern Railway | 200 | 81.9% | 36 | 0 | 1 | 5.6 min |
| East Midlands Railway | 508 | 85.3% | 70 | 8 | 23 | 4 min |
| Gatwick Express | 72 | 85.7% | 8 | 4 | 12 | 3.7 min |
| Tyne and Wear Metro | 87 | 86.2% | 12 | 0 | 0 | 2 min |
| TransPennine Express | 314 | 87.7% | 37 | 3 | 10 | 3.2 min |
| Great Northern | 400 | 88.2% | 45 | 7 | 12 | 2.3 min |
| Thameslink | 654 | 88.4% | 73 | 4 | 22 | 2.6 min |
| Southeastern | 1,807 | 89.4% | 187 | 12 | 23 | 2 min |
| South Western Railway | 1,613 | 89.8% | 156 | 27 | 56 | 2.1 min |
| Great Western Railway | 1,725 | 91.5% | 143 | 17 | 27 | 1.7 min |
| West Midlands Trains | 1,319 | 92.2% | 98 | 19 | 50 | 1.4 min |
| Northern | 2,703 | 92.5% | 201 | 16 | 20 | 1.3 min |
| South Yorkshire Supertram | 40 | 92.5% | 3 | 0 | 0 | 1.6 min |
| Southern | 1,699 | 92.9% | 117 | 16 | 36 | 1.7 min |
| c2c | 362 | 92.9% | 21 | 5 | 61 | 1.9 min |
| London Overground | 1,613 | 93.7% | 99 | 4 | 49 | 1.4 min |
| Transport for Wales | 1,074 | 94.2% | 58 | 24 | 44 | 1 min |
| ScotRail | 2,278 | 94.7% | 118 | 19 | 15 | 1.2 min |
| Elizabeth line | 696 | 94.9% | 35 | 0 | 5 | 0.9 min |
| London Underground | 187 | 95.2% | 7 | 41 | 0 | 1.4 min |
| Merseyrail | 622 | 97.2% | 17 | 5 | 10 | 0.3 min |
| Greater Anglia | 1,307 | 97.3% | 35 | 2 | 2 | 0.2 min |
| Chiltern Railways | 340 | 97.3% | 9 | 0 | 1 | 0.1 min |
| Heathrow Express | 152 | 100% | 0 | 0 | 0 | 0.4 min early |
| Island Line | 66 | 100% | 0 | 0 | 0 | 0.8 min early |
Punctuality
| Trains | Ran | Arrived | On time | Average delay |
|---|---|---|---|---|
| Long distance (10 min) | 6,349 | 6,349 | 90.8% | 3.1 min |
| Other (5 min) | 15,424 | 15,424 | 92.4% | 1.2 min |
Cancellations
| Kind | Trains | Share |
|---|---|---|
| Attributed | 233 | 94% |
| Unexplained | 10 | 4% |
| Planned | 5 | 2% |
Why most common first
| Reason | Code | Share |
|---|---|---|
| Cancelled at the freight operator's request, or planned not to run | FL | 27.1% (355) |
| Not investigated by Network Rail | OU | 16.2% (212) |
| Agreed in advance between Network Rail and the operator | PL | 11.1% (145) |
| The train due to form it arrived late | YI | 7% (92) |
| At the train operator's request | TB | 5.9% (78) |
| Delays incurred on non-Network Rail running lines or networks including London Underground | TX | 3.7% (48) |
| Not yet investigated | ZW | 3.6% (47) |
| Coupler and Coupler system faults | MY | 2.5% (33) |
| Other technical failures (doors, body or interior) | M8 | 1.8% (24) |
| Train-crew rostering problem | TI | 1.6% (21) |
| Driver | TG | 1.6% (21) |
| Trespass including non-intentional | XA | 1.4% (18) |
| Other technical failures below the solebar | MD | 1.2% (16) |
| Brake and brake system faults including wheel flats | MN | 1.3% (16) |
| Uninvestigated Loss in Running System Roll-Up only | ZZ | 1.1% (15) |
| Depot operating problem | MU | 1.1% (14) |
| Door and Door system faults | M7 | 0.8% (10) |
| Points failure (including no fault found) | IB | 0.8% (10) |
| Planned underpowered or shortformed service or vehicle | MS | 0.6% (8) |
| Track defects other than rail defects | IS | 0.5% (7) |
| Senior Conductor or Train Manager | TH | 0.5% (7) |
| Lost path - following another later running train | YD | 0.5% (6) |
| Time lost en-route believed to be Operator cause and information required from Operator | TO | 0.5% (6) |
| Animal Strike or Incursion within the control of Network Rail | I8 | 0.4% (5) |
| Planned cancellation identified and agreed prior to 22.00 the day before the schedule runs | PG | 0.4% (5) |
| Track circuit failure (including no fault found) | IC | 0.4% (5) |
| Broken/cracked/twisted/buckled/flawed rail | IR | 0.3% (4) |
| Engineer's on-track equipment failure outside possession | MV | 0.3% (4) |
| Cancellation of a duplicate or erroneous schedule or an identified duplicate, false or erroneous delay | PJ | 0.3% (4) |
| Signal failure (including no fault found) | IA | 0.3% (4) |
All trains in the network
| State | All | Passenger |
|---|---|---|
| Arrived | 29,811 | 22,140 |
| Planned | 2,487 | 66 |
| Cancelled | 1,311 | 403 |
| No arrival reported | 539 | 397 |