The railway on 26th November 2026

TrainTimesLive
Menu Close menu

Daily performance

34,247 trains23,048 carrying passengers755 part cancelled356 no arrival reported0 stopped short

On time90.0%
of those that arrived
Average delay2.0min
at their last call
Cancelled873(3.8%)
passenger trains that did not run
DisruptionDisruption, 0 to 5Cancelled and late trains across the network over the day.0–1Running normally2–3Some delays4–5Serious disruptionMore in the glossary2
moderate · over the day

By operator least punctual first · not coloured under 20 trains

OperatorTrainsOn time LateCancelledPart cancelledAverage delay
Eurostar 27 39.1% 14 4 0 20.4min
Grand Central 20 65.0% 7 0 0 8.7min
Caledonian Sleeper 10 70.0%Too few trains to rate (10 arrived) 3 0 0 1.3min
CrossCountry 281 80.0% 53 3 13 6.0min
Elizabeth line 696 80.2% 125 14 50 2.5min
TransPennine Express 321 81.8% 52 4 31 4.9min
Avanti West Coast 318 83.0% 53 3 3 5.0min
Northern 2,749 85.8% 371 52 80 2.4min
East Midlands Railway 509 86.4% 67 1 17 3.0min
Lumo 22 86.4% 3 0 0 2.4min
Great Northern 400 86.5% 51 2 19 2.7min
South Western Railway 1,616 87.9% 191 11 22 2.3min
London North Eastern Railway 200 88.4% 23 0 2 3.5min
Great Western Railway 1,741 88.5% 191 55 56 2.3min
ScotRail 2,277 89.0% 239 63 51 2.3min
Southern 1,720 90.4% 161 7 33 2.2min
Thameslink 648 91.0% 54 13 38 2.1min
South Yorkshire Supertram 37 91.9% 3 0 0 1.1min
West Midlands Trains 1,319 92.4% 95 32 37 1.3min
London Overground 1,616 92.9% 90 191 169 1.3min
Hull Trains 14 92.9%Too few trains to rate (14 arrived) 1 0 0 2.4min
Southeastern 1,809 93.1% 123 9 12 1.5min
Chiltern Railways 340 93.1% 23 5 1 1.1min
Tyne and Wear Metro 90 93.2% 6 2 0 1.7min
Transport for Wales 1,061 93.3% 67 13 45 1.2min
Island Line 66 95.5% 3 8 0 3.1min
Heathrow Express 152 96.4% 5 14 0 1.1min
Greater Anglia 1,306 96.5% 45 7 12 0.2min
c2c 367 97.1% 9 4 54 1.2min
Gatwick Express 72 97.2% 2 0 0 3.0min
Merseyrail 622 99.0% 6 1 8 0.0min
London Underground 361 100.0%Too few trains to rate (4 arrived) 0 355 2 0.5min early

Punctuality

TrainsRan ArrivedOn time Average delay
Long distance, within 10 minutes 6,329 6,329 90.1% 3.2 min
Regional and commuter, within 5 minutes 14,830 14,830 90.0% 1.5 min

Cancellations passenger trains that did not run at all

KindTrains Share
On the day, cause given 790 90.5%
On the day, unexplained 47 5.4%
Planned or excluded 29 3.3%
National Rail only 7 0.8%

Why every cancelled train, freight included

ReasonCode Share
Cancelled at the freight operator's request, or planned not to run FL 15.7%(331)
Not investigated by Network Rail OU 11.4%(241)
Delays incurred on non-Network Rail running lines or networks including London Underground TX 10.6%(224)
Broken/cracked/twisted/buckled/flawed rail IR 9.9%(207)
Agreed in advance between Network Rail and the operator PL 7.5%(158)
Not yet investigated ZW 6.9%(146)
The train due to form it arrived late YI 5.3%(113)
Trespass including non-intentional XA 3.9%(81)
At the train operator's request TB 3.0%(64)
Diesel loco failure, defect, attention MC 2.4%(50)

All trains in the network

StateAll Passenger
Planned 2,476 60
Arrived 29,310 21,663
Cancelled 2,105 1,137
No arrival reported 356 188

Cancelled here is what the signalling feed recorded, including trains cancelled for part of the way. The Cancelled figure at the top counts passenger trains that did not run at all, from National Rail's feed as well, so the two can differ either way.

Stopped short 0

Inferred, not reported: a train turned short on purpose looks the same as one that failed. Passenger trains that had already started.

None on this day. A train cut short on purpose is counted as part cancelled.