Daily performance
34,209 trains23,045 carrying passengers668 part cancelled487 no arrival reported0 stopped short
On time91.5%
of those that arrivedAverage delay1.7min
at their last callCancelled301(1.3%)
passenger trains that did not runDisruptionDisruption, 0 to 5Cancelled and late trains across the network over the day.0–1Running normally2–3Some delays4–5Serious disruptionMore in the glossary1
low · over the dayBy operator least punctual first · not coloured under 20 trains
| Operator | Trains | On time | Late | Cancelled | Part cancelled | Average delay |
|---|---|---|---|---|---|---|
| Eurostar | 26 | 40.0% | 12 | 6 | 0 | 27.4min |
| Caledonian Sleeper | 9 | 75.0%Too few trains to rate (8 arrived) | 2 | 0 | 1 | 3.6min |
| Avanti West Coast | 319 | 79.7% | 62 | 2 | 11 | 6.2min |
| South Western Railway | 1,613 | 80.1% | 286 | 13 | 161 | 3.4min |
| TransPennine Express | 319 | 80.5% | 59 | 4 | 13 | 4.9min |
| CrossCountry | 278 | 85.6% | 30 | 15 | 55 | 5.0min |
| Hull Trains | 15 | 85.7%Too few trains to rate (14 arrived) | 2 | 1 | 0 | 6.4min |
| London North Eastern Railway | 201 | 85.9% | 28 | 0 | 3 | 4.5min |
| Elizabeth line | 696 | 87.5% | 82 | 17 | 24 | 2.0min |
| Southeastern | 1,809 | 88.0% | 213 | 10 | 31 | 2.4min |
| East Midlands Railway | 507 | 89.8% | 51 | 3 | 6 | 2.2min |
| Grand Central | 20 | 90.0% | 2 | 0 | 0 | 3.8min |
| London Underground | 220 | 90.1% | 14 | 78 | 1 | 1.8min |
| Northern | 2,751 | 90.6% | 252 | 16 | 57 | 1.7min |
| West Midlands Trains | 1,317 | 91.5% | 106 | 32 | 39 | 1.4min |
| Great Northern | 401 | 91.7% | 30 | 9 | 32 | 1.9min |
| Thameslink | 651 | 91.9% | 51 | 7 | 17 | 1.8min |
| Transport for Wales | 1,069 | 92.6% | 76 | 13 | 28 | 1.3min |
| Great Western Railway | 1,730 | 93.4% | 111 | 30 | 24 | 1.3min |
| Southern | 1,700 | 93.9% | 102 | 0 | 26 | 1.6min |
| c2c | 366 | 94.1% | 20 | 0 | 26 | 1.4min |
| Tyne and Wear Metro | 87 | 94.2% | 5 | 0 | 1 | 1.3min |
| Gatwick Express | 72 | 94.4% | 4 | 0 | 0 | 3.7min |
| ScotRail | 2,277 | 95.3% | 105 | 21 | 26 | 1.1min |
| London Overground | 1,603 | 95.4% | 70 | 14 | 73 | 1.1min |
| Lumo | 22 | 95.5% | 1 | 0 | 0 | 1.9min |
| Greater Anglia | 1,306 | 96.1% | 50 | 2 | 13 | 0.5min |
| Chiltern Railways | 340 | 96.8% | 11 | 1 | 0 | 0.2min |
| Island Line | 65 | 96.9% | 2 | 3 | 0 | 0.9min |
| Heathrow Express | 152 | 99.3% | 1 | 0 | 0 | 0.5min |
| Merseyrail | 622 | 100.0% | 0 | 0 | 0 | 0.2min early |
| South Yorkshire Supertram | 39 | 100.0% | 0 | 4 | 0 | 0.2min early |
Punctuality
| Trains | Ran | Arrived | On time | Average delay |
|---|---|---|---|---|
| Long distance, within 10 minutes | 6,367 | 6,367 | 92.1% | 2.9 min |
| Regional and commuter, within 5 minutes | 15,269 | 15,269 | 91.2% | 1.3 min |
Cancellations passenger trains that did not run at all
| Kind | Trains | Share |
|---|---|---|
| On the day, cause given | 278 | 92.4% |
| On the day, unexplained | 21 | 7.0% |
| Planned or excluded | 1 | 0.3% |
| National Rail only | 1 | 0.3% |
Why every cancelled train, freight included
| Reason | Code | Share |
|---|---|---|
| Cancelled at the freight operator's request, or planned not to run | FL | 24.4%(343) |
| Not investigated by Network Rail | OU | 13.7%(192) |
| Agreed in advance between Network Rail and the operator | PL | 10.1%(141) |
| Delays incurred on non-Network Rail running lines or networks including London Underground | TX | 7.5%(104) |
| Not yet investigated | ZW | 6.9%(97) |
| The train due to form it arrived late | YI | 6.4%(90) |
| At the train operator's request | TB | 4.0%(57) |
| Other technical failures (doors, body or interior) | M8 | 2.9%(41) |
| Driver | TG | 2.2%(32) |
| Time lost en-route believed to be Operator cause and information required from Operator | TO | 2.0%(28) |
All trains in the network
| State | All | Passenger |
|---|---|---|
| Planned | 2,513 | 62 |
| Arrived | 29,807 | 22,124 |
| Cancelled | 1,402 | 491 |
| No arrival reported | 487 | 368 |
Cancelled here is what the signalling feed recorded, including trains cancelled for part of the way. The Cancelled figure at the top counts passenger trains that did not run at all, from National Rail's feed as well, so the two can differ either way.
Stopped short 0
iInferred, not reported: a train turned short on purpose looks the same as one that failed. Passenger trains that had already started.
None on this day. A train cut short on purpose is counted as part cancelled.