The railway on 26th August 2026

TrainTimesLive
Menu Close menu

26th August 2026

33,886Trains22,839 carrying passengers
88.3%On timeof those that arrived
2.4 minAverage delayat their last call
756Cancelledplanned ones included
434Part cancelledran for only part of the journey
1,798Never activatedbooked, and never appeared
2Stopped shortdid not reach the last stop

By operator least punctual first

OperatorTrackedOn time LateCancelledPart cancelledAverage delay
London North Eastern Railway 183 37.1% 61 25 7 22.9 min
Great Northern 300 58.2% 41 131 35 9.2 min
Avanti West Coast 249 59.8% 74 2 2 10 min
Thameslink 501 61.4% 97 110 51 10.9 min
London Underground 171 67% 29 68 0 4 min
CrossCountry 246 67.6% 55 3 2 9.8 min
Eurostar 24 70% 6 0 0 5 min
East Midlands Railway 420 78.4% 69 7 8 4.3 min
Elizabeth line 553 79.6% 87 28 21 2.6 min
Southeastern 1,441 82.1% 201 69 50 3.9 min
Tyne and Wear Metro 70 82.8% 10 1 0 2.4 min
Gatwick Express 59 83.3% 8 2 1 5.4 min
West Midlands Trains 1,090 87% 112 55 21 2.3 min
Heathrow Express 120 87.2% 14 0 0 2.9 min
Transport for Wales 839 88.5% 69 60 42 2.2 min
Northern 2,297 89% 210 22 20 1.7 min
South Western Railway 1,325 89.2% 117 15 69 2 min
Great Western Railway 1,391 90.7% 109 19 12 1.7 min
TransPennine Express 259 91% 17 4 8 1.6 min
Southern 1,330 91.3% 94 32 50 2 min
Greater Anglia 1,034 92.4% 67 9 4 1.4 min
c2c 267 93.3% 15 1 4 1.8 min
London Overground 1,330 96.1% 43 66 14 0.9 min
South Yorkshire Supertram 30 96.3% 1 0 0 1.5 min
ScotRail 1,924 96.4% 59 9 3 0.7 min
Chiltern Railways 291 98.3% 4 0 2 0.1 min
Merseyrail 526 99.6% 2 3 6 0.2 min early
Island Line 42 100% 0 0 0 0.3 min early

Punctuality

TrainsRan ArrivedOn time Average delay
Long distance (10 min) 5,064 4,052 84.3% 4.9 min
Other (5 min) 12,167 10,497 89.9% 1.4 min

Stopped short 2

Trains that reported movements and then did not reach the last station they were booked to.

TrainOperator Booked to reach
1P03 TP York
9G82 Southend Victoria

Inferred, not reported: TRUST sends no failure event. A train diverted or turned short on purpose looks the same as one that broke down, and neither announces itself. Passenger services only, and only where the train had already started.

Cancellations

KindTrains Share
Attributed 685 90.6%
Unexplained 38 5%
Reported by Darwin 28 3.7%
Planned 5 0.7%

Why most common first

ReasonCode Share
Train cancelled at FOC request or planned not to run FL 11.6% (159)
Exclusion commercially agreed and documented between Network Rail and Train Operator PL 11% (150)
Delays not investigated by Network Rail OU 9.9% (136)
Fatalities or injuries caused by being hit by train XC 8.5% (116)
Late arrival of booked inward stock YI 8.4% (115)
Delays incurred on non-Network Rail running lines or networks including London Underground TX 6.8% (93)
Driver TG 6.4% (87)
Uninvestigated Cancellations System Roll-Ups only ZW 2.8% (38)
Trespass including non-intentional XA 2.5% (34)
Fatalities or injuries caused by being hit by train XC 2.3% (31)
Late arrival of booked inward stock YI 2% (28)
Trespass including non-intentional XA 1.9% (26)
Train cancelled or delayed at Train Operator's request TB 1.9% (26)
Other Passenger Train Operating Company causes TZ 1.5% (20)
Uninvestigated Cancellations System Roll-Ups only ZW 1.3% (18)
Driver TG 1.2% (17)
Fire external to but directly affecting the Network Rail network XL 1.1% (15)
Other technical failures above the Solebar M8 1% (13)
Depot operating problem MU 0.8% (11)
Uninvestigated Late Start System Roll-Ups only ZX 0.8% (11)
Brake and brake system faults including wheel flats MN 0.7% (10)
WTT Schedule or LTP process including incorrect simplifiers QA 0.7% (10)
Points failure (including no fault found) IB 0.6% (8)
Rough ride or bumps reported - cause not known or no fault found IT 0.6% (8)
Broken/cracked/twisted/buckled/flawed rail IR 0.5% (7)
Track defects other than rail defects IS 0.5% (7)
Train cancelled or delayed at Train Operator's request TB 0.5% (7)
Time lost en-route believed to be Operator cause and information required from Operator TO 0.4% (6)
Broken/cracked/twisted/buckled/flawed rail IR 0.4% (6)
Fire external to but directly affecting the Network Rail network XL 0.4% (6)
Time lost en-route believed to be Operator cause and information required from Operator TO 0.4% (6)
Other technical failures below the solebar MD 0.4% (6)
Exclusion commercially agreed and documented between Network Rail and Train Operator PL 0.4% (6)
Planned cancellation identified and agreed prior to 22.00 the day before the schedule runs PG 0.4% (5)
Track defects other than rail defects IS 0.4% (5)
Senior Conductor or Train Manager TH 0.4% (5)
Axle Counter Failure J3 0.4% (5)
Senior Conductor or Train Manager TH 0.4% (5)
Diesel loco failure, defect, attention MC 0.3% (4)
Cancellation of a duplicate or erroneous schedule or an identified duplicate, false or erroneous delay PJ 0.3% (4)

All trains in the network

StateAll Passenger
Arrived 21,351 17,684
Planned 9,369 3,928
Never activated 1,798 499
Cancelled 1,368 728