The railway on 13th September 2026

TrainTimesLive
Menu Close menu

13th September 2026

18,258Trains13,251 carrying passengers
91.1%On timeof those that arrived
1.8 minAverage delayat their last call
282Cancelledplanned ones included
301Part cancelledran for only part of the journey
839Never activatedbooked, and never appeared
0Stopped shortdid not reach the last stop

By operator least punctual first

OperatorTrackedOn time LateCancelledPart cancelledAverage delay
Avanti West Coast 226 42.8% 115 6 19 14.3 min
Eurostar 27 44% 14 2 0 23.2 min
CrossCountry 175 76.2% 31 19 26 6.2 min
East Midlands Railway 274 84.7% 40 5 7 3.1 min
West Midlands Trains 647 85.1% 84 36 46 2.5 min
Great Western Railway 814 85.4% 114 10 23 3.6 min
Tyne and Wear Metro 76 85.5% 10 5 2 2.1 min
Gatwick Express 66 87.9% 8 0 0 4.1 min
Southern 971 88.6% 106 11 30 2.6 min
London North Eastern Railway 165 89.1% 18 0 0 2 min
South Western Railway 1,014 89.4% 104 7 28 2.1 min
Northern 1,226 90.7% 110 23 19 1.6 min
Heathrow Express 78 90.7% 7 3 0 3.8 min
Transport for Wales 661 92.5% 48 12 11 1.1 min
c2c 143 92.9% 8 26 4 1.9 min
Elizabeth line 356 93.2% 24 1 4 1.3 min
London Overground 1,187 94.3% 64 17 40 1.5 min
TransPennine Express 359 94.4% 20 0 0 1.6 min
Southeastern 822 94.6% 44 1 5 1.1 min
Thameslink 466 95.2% 22 7 4 1 min
ScotRail 1,131 95.6% 48 20 10 0.7 min
Great Northern 238 96% 9 4 10 0.4 min
Greater Anglia 873 96.4% 31 2 0 0.3 min
Island Line 46 97.8% 1 0 0 0.4 min early
London Underground 159 98.1% 2 52 0 0.3 min
Chiltern Railways 182 98.9% 2 2 1 1.2 min early
Merseyrail 324 99.4% 2 0 9 0.1 min early
South Yorkshire Supertram 25 100% 0 0 0 0.4 min early

Punctuality

TrainsRan ArrivedOn time Average delay
Other (5 min) 8,567 8,567 92.6% 1 min
Long distance (10 min) 3,806 3,806 87.8% 3.6 min

Cancellations

KindTrains Share
Attributed 238 84.4%
Unexplained 38 13.5%
Planned 3 1.1%
Reported by Darwin 3 1.1%

Why most common first

ReasonCode Share
Delays not investigated by Network Rail OU 14.3% (128)
Exclusion commercially agreed and documented between Network Rail and Train Operator PL 12.2% (110)
Uninvestigated Cancellations System Roll-Ups only ZW 12.1% (109)
Train cancelled at FOC request or planned not to run FL 9.8% (88)
Delays incurred on non-Network Rail running lines or networks including London Underground TX 6.6% (59)
Late arrival of booked inward stock YI 5.7% (51)
Train cancelled or delayed at Train Operator's request TB 3.5% (31)
Driver TG 3.1% (28)
Late arrival of booked inward stock YI 2.7% (24)
Senior Conductor or Train Manager TH 2.3% (21)
Train-crew, loco, stock or unit diagram issues TA 1.8% (16)
Train cancelled or delayed at Train Operator's request TB 1.3% (12)
Driver TG 1.2% (11)
Uninvestigated Cancellations System Roll-Ups only ZW 1.2% (11)
Other Passenger Train Operating Company causes TZ 1.1% (10)
Depot operating problem MU 1.1% (10)
Other technical failures above the Solebar M8 1% (9)
Delays not investigated by Network Rail OU 0.9% (8)
Fatalities or injuries caused by being hit by train XC 0.9% (8)
Fatalities or injuries sustained whilst on a platform VC 0.8% (7)
Fatalities or injuries sustained whilst on a platform VC 0.8% (7)
Track circuit failure (including no fault found) IC 0.7% (6)
Possession over-run from planned work I5 0.7% (6)
Other technical failures below the solebar MD 0.7% (6)
Other technical failures above the Solebar M8 0.7% (6)
Points failure (including no fault found) IB 0.7% (6)
Fatalities or injuries caused by being hit by train XC 0.6% (5)
Uninvestigated Late Start System Roll-Ups only ZX 0.6% (5)
Time lost en-route believed to be Operator cause and information required from Operator TO 0.6% (5)
Exclusion commercially agreed and documented between Network Rail and Train Operator PL 0.6% (5)
Confirmed train borne safety system faults (not cab based) MT 0.4% (4)
WTT Schedule or LTP process including incorrect simplifiers QA 0.4% (4)
Disorder, drunks or trespass VA 0.4% (4)
Other technical failures below the solebar MD 0.3% (3)
Late presentation from the continent TN 0.3% (3)
Possession over-run from planned work I5 0.3% (3)
Confirmed train cab based safety system fault including GSM-R M0 0.3% (3)
Track defects other than rail defects IS 0.3% (3)
Cutting or embankment earthslip, rock fall or subsidence IV 0.3% (3)
Trespass including non-intentional XA 0.3% (3)

All trains in the network

StateAll Passenger
Arrived 15,924 12,582
Cancelled 898 386
Never activated 839 235
Planned 597 48