The railway on 23rd September 2026

TrainTimesLive
Menu Close menu

23rd September 2026

34,247Trains23,062 carrying passengers
89.9%On timeof those that arrived
2.2 minAverage delayat their last call
745Cancelledplanned ones included
1,058Part cancelledran for only part of the journey
1,387Never activatedbooked, and never appeared
5Stopped shortdid not reach the last stop

By operator least punctual first

OperatorTrackedOn time LateCancelledPart cancelledAverage delay
Avanti West Coast 317 61.5% 114 7 14 12.9 min
Gatwick Express 72 71.7% 15 3 16 9.7 min
London North Eastern Railway 200 72.5% 55 0 0 6.4 min
Great Northern 400 81.5% 63 28 32 3.7 min
Southern 1,689 81.7% 274 58 136 4.6 min
CrossCountry 267 82.4% 36 10 52 4.7 min
Thameslink 653 83.2% 87 42 94 4.7 min
South Western Railway 1,607 83.7% 231 47 143 3.6 min
Eurostar 26 84.6% 4 0 0 2.3 min
Great Western Railway 1,483 86.4% 176 77 114 2.1 min
London Underground 193 87.9% 17 52 1 1.4 min
Northern 2,770 90% 267 52 56 1.6 min
London Overground 1,609 90.8% 135 55 96 1.8 min
West Midlands Trains 1,327 90.9% 113 17 68 1.6 min
East Midlands Railway 501 91.9% 39 9 12 1.8 min
Southeastern 1,808 93.2% 122 7 19 1.6 min
Transport for Wales 958 93.2% 55 77 74 1.3 min
TransPennine Express 355 93.3% 22 3 24 2.5 min
ScotRail 2,279 94.4% 117 112 76 1.1 min
c2c 366 94.9% 18 2 10 1.7 min
Tyne and Wear Metro 89 95.3% 4 2 1 1.9 min
Greater Anglia 1,304 95.8% 54 2 6 0.8 min
Elizabeth line 695 97.1% 20 1 4 0.7 min
Chiltern Railways 350 97.4% 9 2 3 0.7 min
Merseyrail 622 99.7% 2 1 1 0.3 min early
Heathrow Express 150 100% 0 0 0 0.3 min early
Island Line 52 100% 0 0 0 0.5 min early
South Yorkshire Supertram 37 100% 0 0 0 0.2 min

Punctuality

TrainsRan ArrivedOn time Average delay
Other (5 min) 14,903 14,898 91% 1.3 min
Long distance (10 min) 5,889 5,889 87% 4.4 min

Stopped short 5

Trains that reported movements and then did not reach the last station they were booked to.

TrainOperator Booked to reach
2F88 Penmere
2F89 Penmere
2F90 Penmere
2F91 Penmere
2F93 Penmere

Inferred, not reported: TRUST sends no failure event. A train diverted or turned short on purpose looks the same as one that broke down, and neither announces itself. Passenger services only, and only where the train had already started.

Cancellations

KindTrains Share
Attributed 632 84.8%
Unexplained 77 10.3%
Reported by Darwin 26 3.5%
Planned 10 1.3%

Why most common first

ReasonCode Share
Delays not investigated by Network Rail OU 18.2% (450)
Train cancelled at FOC request or planned not to run FL 17.4% (428)
Uninvestigated Cancellations System Roll-Ups only ZW 8.4% (206)
Late arrival of booked inward stock YI 6.8% (167)
Exclusion commercially agreed and documented between Network Rail and Train Operator PL 6.4% (157)
Train Describer/Panel/ARS/SSI/TDM/Remote Control failure IF 3% (75)
Late arrival of booked inward stock YI 2.8% (68)
Train cancelled or delayed at Train Operator's request TB 2.7% (66)
Delays incurred on non-Network Rail running lines or networks including London Underground TX 2.2% (54)
Points failure (including no fault found) IB 1.9% (46)
Uninvestigated Cancellations System Roll-Ups only ZW 1.8% (45)
Driver TG 1.7% (43)
Depot operating problem MU 1.2% (30)
External trees, buildings or structures encroaching or falling onto infrastructure XO 1.2% (29)
Driver TG 1.1% (26)
Train cancelled or delayed at Train Operator's request TB 1.1% (26)
External utility incident including gas, water mains and overhead power lines XM 1.1% (26)
Planned underpowered or shortformed service or vehicle MS 1% (25)
Other technical failures below the solebar MD 0.9% (23)
Brake and brake system faults including wheel flats MN 0.7% (18)
External utility incident including gas, water mains and overhead power lines XM 0.7% (17)
Points failure (including no fault found) IB 0.7% (17)
Train Describer/Panel/ARS/SSI/TDM/Remote Control failure IF 0.7% (17)
Time lost en-route believed to be Operator cause and information required from Operator TO 0.6% (16)
AWS/ATP/TPWS/Train Stop/On-track equipment failure IJ 0.6% (15)
Fires starting on Network Rail Infrastructure I9 0.6% (15)
Telecom equipment radio failure (GSM-R) J0 0.6% (14)
Brake and brake system faults including wheel flats MN 0.5% (13)
Other Passenger Train Operating Company causes TZ 0.5% (12)
External utility incident including gas, water mains and overhead power lines XM 0.5% (12)
Telecom equipment radio failure (GSM-R) J0 0.4% (11)
Signal failure (including no fault found) IA 0.4% (11)
Delays not investigated by Network Rail OU 0.4% (11)
Safety related incident caused by maintenance or infrastructure staff oversight or error JL 0.4% (11)
Telecom equipment failure (including no fault found) IK 0.4% (11)
Other technical failures above the Solebar M8 0.4% (11)
Fires starting on Network Rail Infrastructure I9 0.4% (10)
Safety related incident caused by maintenance or infrastructure staff oversight or error JL 0.4% (10)
Cancellation of a duplicate or erroneous schedule or an identified duplicate, false or erroneous delay PJ 0.4% (9)
Other technical failures above the Solebar M8 0.4% (9)

All trains in the network

StateAll Passenger
Arrived 27,809 21,524
Planned 2,585 63
Cancelled 2,466 1,083
Never activated 1,387 392