The railway on 24th September 2026

TrainTimesLive
Menu Close menu

24th September 2026

34,277Trains23,125 carrying passengers
92.3%On timeof those that arrived
1.6 minAverage delayat their last call
386Cancelledplanned ones included
513Part cancelledran for only part of the journey
1,572Never activatedbooked, and never appeared
1Stopped shortdid not reach the last stop

By operator least punctual first

OperatorTrackedOn time LateCancelledPart cancelledAverage delay
Eurostar 27 77.8% 6 0 0 5.1 min
CrossCountry 279 80.9% 49 5 17 5.8 min
Great Northern 400 85.6% 53 11 22 3.1 min
Southeastern 1,807 89.2% 189 5 44 2.1 min
London North Eastern Railway 200 89.4% 21 0 1 2.9 min
Northern 2,777 89.5% 277 66 69 1.7 min
East Midlands Railway 501 89.5% 51 5 11 2.4 min
Grand Central 20 90% 2 0 0 4.2 min
Great Western Railway 1,726 90.2% 164 35 20 1.8 min
South Western Railway 1,610 91.8% 123 43 59 1.6 min
TransPennine Express 356 92% 27 0 17 2.2 min
Greater Anglia 1,305 92.1% 100 23 18 1.6 min
Avanti West Coast 317 92.1% 25 0 2 3.5 min
Transport for Wales 993 92.6% 70 17 29 1.4 min
Elizabeth line 695 93.1% 45 21 21 1.6 min
Southern 1,690 93.5% 106 12 39 1.7 min
c2c 365 93.9% 22 0 7 2.1 min
West Midlands Trains 1,327 94.1% 76 22 13 1 min
London Overground 1,610 94.4% 85 43 47 1.3 min
Chiltern Railways 350 94.5% 19 0 3 1.2 min
Thameslink 653 95.2% 28 30 44 1.6 min
Heathrow Express 152 95.4% 7 0 0 1.4 min
ScotRail 2,279 96.1% 88 14 20 1 min
Tyne and Wear Metro 88 97.7% 2 2 0 0.4 min
Gatwick Express 72 98.6% 1 0 0 2.3 min
Merseyrail 622 98.7% 8 1 8 on time
London Underground 175 99.3% 1 27 1 on time
Island Line 52 100% 0 0 0 0.8 min early
South Yorkshire Supertram 38 100% 0 0 0 0.2 min early

Punctuality

TrainsRan ArrivedOn time Average delay
Long distance (10 min) 6,358 6,358 91.7% 3 min
Other (5 min) 15,385 15,384 92.6% 1 min

Stopped short 1

Trains that reported movements and then did not reach the last station they were booked to.

TrainOperator Booked to reach
9Z02 St Pancras International

Inferred, not reported: TRUST sends no failure event. A train diverted or turned short on purpose looks the same as one that broke down, and neither announces itself. Passenger services only, and only where the train had already started.

Cancellations

KindTrains Share
Attributed 350 90.7%
Unexplained 23 6%
Reported by Darwin 11 2.8%
Planned 2 0.5%

Why most common first

ReasonCode Share
Train cancelled at FOC request or planned not to run FL 24.8% (393)
Delays not investigated by Network Rail OU 13.4% (212)
Exclusion commercially agreed and documented between Network Rail and Train Operator PL 10.3% (163)
Late arrival of booked inward stock YI 6.6% (104)
Uninvestigated Cancellations System Roll-Ups only ZW 4.7% (74)
Train cancelled or delayed at Train Operator's request TB 2.8% (45)
Fatalities or injuries caused by being hit by train XC 2.7% (43)
Delays incurred on non-Network Rail running lines or networks including London Underground TX 1.9% (30)
Driver TG 1.8% (28)
Points failure (including no fault found) IB 1.8% (28)
Train-crew rostering problem TI 1.6% (26)
Animal Strike or Incursion within the control of Network Rail I8 1.5% (24)
Late arrival of booked inward stock YI 1.5% (23)
Other technical failures above the Solebar M8 1.3% (20)
WTT Schedule or LTP process including incorrect simplifiers QA 1.2% (19)
Animal Strike or Incursion within the control of Network Rail I8 1.1% (18)
Other Passenger Train Operating Company causes TZ 1% (16)
Miscellaneous items on the track or railhead JX 0.9% (15)
Uninvestigated Cancellations System Roll-Ups only ZW 0.9% (14)
Train cancelled or delayed at Train Operator's request TB 0.9% (14)
Failure to maintain vegetation within network boundaries JP 0.9% (14)
Driver TG 0.8% (13)
Planned underpowered or shortformed service or vehicle MS 0.8% (13)
Other technical failures above the Solebar M8 0.6% (10)
Other FOC causes including mishaps FZ 0.6% (9)
Senior Conductor or Train Manager TH 0.6% (9)
Points failure (including no fault found) IB 0.6% (9)
Train-crew rostering problem TI 0.5% (8)
External utility incident including gas, water mains and overhead power lines XM 0.5% (8)
Fatalities or injuries caused by being hit by train XC 0.4% (7)
Senior Conductor or Train Manager TH 0.4% (7)
Train cancelled at FOC request or planned not to run FL 0.4% (7)
Passenger taken ill on train VD 0.4% (7)
External trees, buildings or structures encroaching or falling onto infrastructure XO 0.4% (7)
Depot operating problem MU 0.4% (7)
Time lost en-route believed to be Operator cause and information required from Operator TO 0.4% (6)
Brake and brake system faults including wheel flats MN 0.4% (6)
Signal failure (including no fault found) IA 0.4% (6)
Other technical failures below the solebar MD 0.3% (5)
Other technical failures below the solebar MD 0.3% (5)

All trains in the network

StateAll Passenger
Arrived 28,505 22,085
Planned 2,617 68
Cancelled 1,583 562
Never activated 1,572 410