The railway on 25th September 2026

TrainTimesLive
Menu Close menu

25th September 2026 still running

34,149Trains23,132 carrying passengers
91.1%On timeof those that arrived
1.8 minAverage delayat their last call
342Cancelledplanned ones included
617Part cancelledran for only part of the journey
863Never activatedbooked, and never appeared
0Stopped shortdid not reach the last stop

By operator least punctual first

OperatorTrackedOn time LateCancelledPart cancelledAverage delay
Gatwick Express 62 73.9% 12 6 10 8.5 min
Great Northern 349 80.7% 63 10 13 3.6 min
CrossCountry 234 81% 40 2 22 6.5 min
London North Eastern Railway 167 81.4% 31 0 0 5.4 min
East Midlands Railway 418 84.4% 63 2 11 3.4 min
Eurostar 26 84.6% 4 0 0 4.1 min
Great Western Railway 1,495 85.1% 214 23 31 2.9 min
Avanti West Coast 273 86.8% 36 0 0 4.7 min
Elizabeth line 587 87.4% 70 2 31 1.7 min
London Underground 147 87.6% 13 42 0 1.7 min
Southeastern 1,553 88.7% 169 15 36 2.1 min
South Western Railway 1,374 89.7% 125 57 108 2 min
Northern 2,385 90% 227 37 72 1.8 min
Southern 1,449 90.3% 130 61 55 2.5 min
Heathrow Express 131 90.8% 12 0 0 3.3 min
Thameslink 546 91% 42 9 68 2.3 min
TransPennine Express 294 92.2% 22 0 13 2.5 min
West Midlands Trains 1,118 93.6% 70 4 21 1.2 min
c2c 317 94.5% 17 2 6 1.8 min
Transport for Wales 855 94.6% 43 8 40 0.8 min
ScotRail 1,970 95.7% 83 10 20 0.9 min
London Overground 1,386 96.1% 51 36 29 1 min
Greater Anglia 1,117 96.2% 42 4 12 0.6 min
Chiltern Railways 303 96.7% 10 0 1 0.8 min
Merseyrail 551 97% 16 2 17 0.1 min
South Yorkshire Supertram 33 97% 1 0 0 0.6 min
Tyne and Wear Metro 77 97.4% 2 0 0 0.9 min
Island Line 48 100% 0 0 0 0.7 min early

Punctuality

TrainsRan ArrivedOn time Average delay
Long distance (10 min) 5,332 5,332 88.8% 3.6 min
Other (5 min) 13,115 13,079 92.1% 1.1 min

Cancellations

KindTrains Share
Attributed 281 82.2%
Reported by Darwin 34 9.9%
Unexplained 19 5.6%
Planned 8 2.3%

Why most common first

ReasonCode Share
Train cancelled at FOC request or planned not to run FL 27.4% (359)
Delays not investigated by Network Rail OU 8.5% (112)
Exclusion commercially agreed and documented between Network Rail and Train Operator PL 7.1% (93)
Late arrival of booked inward stock YI 6.4% (84)
Uninvestigated Cancellations System Roll-Ups only ZW 5.9% (78)
Other technical failures above the Solebar M8 4% (52)
Delays incurred on non-Network Rail running lines or networks including London Underground TX 3.3% (43)
Train cancelled or delayed at Train Operator's request TB 3% (39)
Late arrival of booked inward stock YI 2% (26)
Driver TG 1.6% (21)
WTT Schedule or LTP process including incorrect simplifiers QA 1.6% (21)
Driver TG 1.5% (20)
Fatalities or injuries caused by being hit by train XC 1.4% (19)
Fatalities or injuries caused by being hit by train XC 1.4% (18)
Train cancelled or delayed at Train Operator's request TB 1.4% (18)
Uninvestigated Cancellations System Roll-Ups only ZW 1.2% (16)
Other technical failures below the solebar MD 1.2% (16)
Track circuit failure (including no fault found) IC 0.9% (12)
Track defects other than rail defects IS 0.9% (12)
Other technical failures above the Solebar M8 0.9% (12)
Track circuit failure (including no fault found) IC 0.9% (12)
Door and Door system faults M7 0.8% (11)
Fatalities or injuries sustained whilst on a platform VC 0.8% (10)
Time lost en-route believed to be Operator cause and information required from Operator TO 0.8% (10)
Track defects other than rail defects IS 0.7% (9)
Trespass including non-intentional XA 0.6% (8)
Planned cancellation identified and agreed prior to 22.00 the day before the schedule runs PG 0.6% (8)
Trespass including non-intentional XA 0.6% (8)
Train-crew rostering problem TI 0.6% (8)
Senior Conductor or Train Manager TH 0.5% (7)
Delays not investigated by Network Rail OU 0.5% (7)
Confirmed train cab based safety system fault including GSM-R M0 0.5% (7)
Axle Counter Failure J3 0.5% (7)
Senior Conductor or Train Manager TH 0.5% (6)
Depot operating problem MU 0.5% (6)
Animal Strike or Incursion within the control of Network Rail I8 0.5% (6)
Door and Door system faults M7 0.5% (6)
Other FOC causes including mishaps FZ 0.5% (6)
Lost path - following another later running train YD 0.4% (5)
Train cancelled at FOC request or planned not to run FL 0.3% (4)

All trains in the network

StateAll Passenger
Arrived 24,141 18,870
Planned 4,250 1,031
En route 1,883 1,414
Activated 1,701 1,080
Cancelled 1,311 524
Never activated 863 213