The railway on 26th September 2026

TrainTimesLive
Menu Close menu

26th September 2026

28,920Trains21,369 carrying passengers
91.9%On timeof those that arrived
1.8 minAverage delayat their last call
367Cancelledplanned ones included
572Part cancelledran for only part of the journey
1,165Never activatedbooked, and never appeared
0Stopped shortdid not reach the last stop

By operator least punctual first

OperatorTrackedOn time LateCancelledPart cancelledAverage delay
Eurostar 24 66.7% 8 0 0 10 min
Avanti West Coast 289 75.5% 70 1 2 6.5 min
London North Eastern Railway 167 77.8% 37 0 0 7.7 min
Great Northern 317 79.6% 58 12 21 3.5 min
East Midlands Railway 513 82.9% 85 4 13 5.4 min
CrossCountry 272 84.3% 40 3 15 5.4 min
Thameslink 596 86.1% 74 11 52 5.2 min
Northern 2,649 86.7% 333 76 74 2.3 min
TransPennine Express 355 88.1% 40 7 12 4.1 min
Great Western Railway 1,576 89.1% 161 64 39 2.1 min
Transport for Wales 1,086 90.3% 99 6 59 1.7 min
Heathrow Express 152 90.8% 13 8 3 1.8 min
West Midlands Trains 1,252 91.1% 102 44 58 1.6 min
South Western Railway 1,497 93.2% 100 14 22 1.4 min
Southern 1,566 93.8% 93 9 48 1.6 min
Gatwick Express 72 94.4% 4 0 0 3.3 min
Southeastern 1,333 94.8% 68 0 14 0.9 min
London Underground 183 95.2% 6 55 2 0.9 min
Greater Anglia 1,258 95.8% 51 15 20 0.4 min
ScotRail 2,223 96.5% 76 17 15 0.8 min
Elizabeth line 665 96.5% 22 1 28 0.5 min
London Overground 1,423 97.1% 40 15 51 0.8 min
Chiltern Railways 243 97.5% 6 0 0 0.3 min
c2c 295 97.9% 6 0 14 0.3 min
Merseyrail 622 98.2% 11 3 9 0.1 min
Tyne and Wear Metro 83 98.8% 1 0 1 0.3 min
Island Line 52 100% 0 0 0 0.8 min early
South Yorkshire Supertram 37 100% 0 0 0 on time

Punctuality

TrainsRan ArrivedOn time Average delay
Other (5 min) 14,006 14,003 92.6% 1.1 min
Long distance (10 min) 5,936 5,929 90.1% 3.4 min

Cancellations

KindTrains Share
Attributed 309 84.2%
Unexplained 53 14.4%
Reported by Darwin 4 1.1%
Planned 1 0.3%

Why most common first

ReasonCode Share
Train cancelled at FOC request or planned not to run FL 15.9% (196)
Exclusion commercially agreed and documented between Network Rail and Train Operator PL 14.8% (183)
Delays not investigated by Network Rail OU 10.8% (133)
Late arrival of booked inward stock YI 9.9% (122)
Uninvestigated Cancellations System Roll-Ups only ZW 6.6% (82)
Delays incurred on non-Network Rail running lines or networks including London Underground TX 4.4% (55)
Driver TG 3.8% (47)
Uninvestigated Cancellations System Roll-Ups only ZW 2.6% (32)
Other technical failures below the solebar MD 2.5% (31)
Late arrival of booked inward stock YI 2.3% (29)
Depot operating problem MU 2.2% (27)
Other technical failures above the Solebar M8 1.5% (18)
Other technical failures below the solebar MD 1.4% (17)
Driver TG 1.3% (16)
Other technical failures above the Solebar M8 1.1% (14)
Train-crew rostering problem TI 1.1% (13)
Train cancelled or delayed at Train Operator's request TB 1.1% (13)
Trespass including non-intentional XA 1% (12)
Fatalities or injuries caused by being hit by train XC 1% (12)
Train cancelled or delayed at Train Operator's request TB 0.7% (9)
Points failure (including no fault found) IB 0.7% (9)
Planned underpowered or shortformed service or vehicle MS 0.7% (9)
Trespass including non-intentional XA 0.6% (8)
Senior Conductor or Train Manager TH 0.6% (7)
Time lost en-route believed to be Operator cause and information required from Operator TO 0.5% (6)
Waiting platform or station congestion or platform alteration YO 0.5% (6)
Axle Counter Failure J3 0.5% (6)
Signal failure (including no fault found) IA 0.5% (6)
WTT Schedule or LTP process including incorrect simplifiers QA 0.5% (6)
Delays not investigated by Network Rail OU 0.4% (5)
Door and Door system faults M7 0.4% (5)
Train-crew rostering problem TI 0.4% (5)
Door and Door system faults M7 0.4% (5)
Structures - bridges, tunnels, buildings, retaining walls, sea defences JD 0.3% (4)
Confirmed train cab based safety system fault including GSM-R M0 0.3% (4)
Cancellation of a duplicate or erroneous schedule or an identified duplicate, false or erroneous delay PJ 0.3% (4)
Other Passenger Train Operating Company causes TZ 0.3% (4)
Disorder, drunks or trespass VA 0.3% (4)
Fatalities or injuries caused by being hit by train XC 0.2% (3)
Train Describer/Panel/ARS/SSI/TDM/Remote Control failure IF 0.2% (3)

All trains in the network

StateAll Passenger
Arrived 25,370 20,337
Cancelled 1,236 562
Never activated 1,165 392
Planned 1,149 78