The railway on 27th September 2026

TrainTimesLive
Menu Close menu

27th September 2026

18,426Trains13,352 carrying passengers
91.2%On timeof those that arrived
1.7 minAverage delayat their last call
492Cancelledplanned ones included
465Part cancelledran for only part of the journey
916Never activatedbooked, and never appeared
0Stopped shortdid not reach the last stop

By operator least punctual first

OperatorTrackedOn time LateCancelledPart cancelledAverage delay
Eurostar 26 53.8% 12 0 0 7.2 min
London North Eastern Railway 147 72.7% 39 3 1 8.1 min
Avanti West Coast 227 81.9% 41 0 0 4.3 min
Southern 918 84.5% 98 192 96 4.7 min
East Midlands Railway 256 85.1% 36 7 7 3.2 min
London Underground 152 85.9% 19 17 0 1.9 min
South Western Railway 1,084 86.3% 141 12 47 2.5 min
Great Western Railway 884 86.8% 113 14 11 2.6 min
CrossCountry 161 87.6% 17 4 20 3.8 min
Great Northern 243 88.8% 25 5 15 2.7 min
Northern 1,256 91.2% 107 24 11 1.2 min
Transport for Wales 588 91.2% 51 4 5 1 min
London Overground 1,178 91.4% 86 81 93 1.3 min
West Midlands Trains 629 91.6% 49 14 32 1.4 min
Elizabeth line 504 92.9% 33 4 38 1 min
Gatwick Express 66 93.1% 2 35 2 2.3 min
Thameslink 366 93.8% 22 5 8 1.7 min
Heathrow Express 97 93.8% 6 0 0 3 min
Chiltern Railways 194 94.4% 10 0 16 1.6 min
Southeastern 958 94.7% 50 10 4 1.2 min
Tyne and Wear Metro 78 94.7% 2 27 13 0.6 min
ScotRail 1,127 95.2% 53 11 19 1 min
TransPennine Express 265 96.1% 9 11 21 1.9 min
Greater Anglia 884 97.4% 23 2 0 0.1 min early
Merseyrail 324 99.7% 1 0 3 0.6 min early
c2c 202 100% 0 4 1 0.6 min
Island Line 46 100% 0 0 0 0.6 min early
South Yorkshire Supertram 27 100% 0 4 0 0.8 min early

Punctuality

TrainsRan ArrivedOn time Average delay
Other (5 min) 8,255 8,254 91.6% 1.1 min
Long distance (10 min) 3,751 3,751 90.3% 3.2 min

Cancellations

KindTrains Share
Attributed 477 97%
Reported by Darwin 6 1.2%
Unexplained 6 1.2%
Planned 3 0.6%

Why most common first

ReasonCode Share
Fires starting on Network Rail Infrastructure I9 17.5% (188)
Delays not investigated by Network Rail OU 12.1% (130)
Late arrival of booked inward stock YI 9.2% (99)
Exclusion commercially agreed and documented between Network Rail and Train Operator PL 8.2% (88)
Train cancelled at FOC request or planned not to run FL 7.4% (80)
Fires starting on Network Rail Infrastructure I9 4.8% (52)
Late arrival of booked inward stock YI 3.6% (39)
Other Passenger Train Operating Company causes TZ 3% (32)
Driver TG 2.9% (31)
Fires starting on Network Rail Infrastructure I9 2.4% (26)
Uninvestigated Cancellations System Roll-Ups only ZW 2% (21)
Delays incurred on non-Network Rail running lines or networks including London Underground TX 2% (21)
Train cancelled or delayed at Train Operator's request TB 1.5% (16)
Uninvestigated Cancellations System Roll-Ups only ZW 1.2% (13)
Cable vandalism or theft XR 1.2% (13)
Cable vandalism or theft XR 1.1% (12)
Other technical failures above the Solebar M8 1% (11)
Miscellaneous items on the track or railhead JX 1% (11)
Senior Conductor or Train Manager TH 0.9% (10)
Driver TG 0.9% (10)
Track defects other than rail defects IS 0.8% (9)
Train cancelled or delayed at Train Operator's request TB 0.7% (8)
Delays not investigated by Network Rail OU 0.7% (7)
Possession over-run from planned work I5 0.7% (7)
Passenger taken ill on train VD 0.6% (6)
Cancellation of a duplicate or erroneous schedule or an identified duplicate, false or erroneous delay PJ 0.5% (5)
Confirmed train cab based safety system fault including GSM-R M0 0.5% (5)
Points failure (including no fault found) IB 0.5% (5)
Time lost en-route believed to be Operator cause and information required from Operator TO 0.5% (5)
Depot operating problem MU 0.5% (5)
Other technical failures below the solebar MD 0.4% (4)
Senior Conductor or Train Manager TH 0.4% (4)
Other technical failures below the solebar MD 0.4% (4)
Other technical failures above the Solebar M8 0.4% (4)
Track defects other than rail defects IS 0.4% (4)
Signalling functional power supply failure IE 0.4% (4)
WTT Schedule or LTP process including incorrect simplifiers QA 0.4% (4)
Vandalism or theft VB 0.4% (4)
Late arrival of booked inward train-crew YJ 0.4% (4)
Train Describer/Panel/ARS/SSI/TDM/Remote Control failure IF 0.3% (3)

All trains in the network

StateAll Passenger
Arrived 15,862 12,301
Cancelled 1,076 668
Never activated 916 333
Planned 572 50