The railway on 15th October 2026

TrainTimesLive
Menu Close menu

15th October 2026

33,852Trains22,932 carrying passengers
91.8%On timeof those that arrived
1.7 minAverage delayat their last call
361Cancelledplanned ones included
556Part cancelledran for only part of the journey
1,658Never activatedbooked, and never appeared
0Stopped shortdid not reach the last stop

By operator least punctual first

OperatorTrackedOn time LateCancelledPart cancelledAverage delay
South Yorkshire Supertram 37 73% 10 0 0 4.1 min
Eurostar 26 73.1% 7 0 0 3.9 min
Avanti West Coast 317 75.6% 76 5 1 7.4 min
Great Northern 400 76.3% 84 23 22 4.1 min
CrossCountry 278 80% 45 18 35 6.4 min
London North Eastern Railway 200 85.2% 27 8 10 4.4 min
East Midlands Railway 501 86.6% 66 4 5 2.8 min
TransPennine Express 317 88.6% 34 4 15 2.7 min
Southeastern 1,799 89.4% 184 13 40 1.8 min
Tyne and Wear Metro 87 90.6% 8 0 2 1.6 min
Northern 2,750 90.9% 244 31 38 1.6 min
Great Western Railway 1,683 91.3% 144 10 17 1.7 min
Thameslink 651 91.3% 53 18 22 1.8 min
c2c 364 91.3% 31 1 5 2.4 min
West Midlands Trains 1,317 91.9% 101 27 37 1.3 min
ScotRail 2,203 92.1% 166 21 69 1.6 min
South Western Railway 1,611 92.8% 114 1 24 1.4 min
London Underground 180 92.9% 11 24 1 1.1 min
Southern 1,718 93.1% 115 4 38 1.7 min
Gatwick Express 72 93.1% 5 0 0 3.3 min
Transport for Wales 1,065 93.2% 65 37 75 1.5 min
London Overground 1,574 95.6% 63 72 73 1.1 min
Elizabeth line 695 96.4% 25 2 6 0.5 min
Greater Anglia 1,296 96.7% 42 20 14 0.4 min
Chiltern Railways 351 97.4% 9 0 1 0.8 min
Island Line 52 98.1% 1 0 0 0.4 min early
Merseyrail 618 98.4% 10 1 3 0.1 min
Heathrow Express 152 100% 0 1 0 0.1 min

Punctuality

TrainsRan ArrivedOn time Average delay
Long distance (10 min) 6,301 6,297 91.2% 3.1 min
Other (5 min) 15,213 15,209 92% 1.1 min

Cancellations

KindTrains Share
Attributed 301 83.4%
Unexplained 47 13%
Reported by Darwin 9 2.5%
Planned 4 1.1%

Why most common first

ReasonCode Share
Train cancelled at FOC request or planned not to run FL 22.8% (324)
Exclusion commercially agreed and documented between Network Rail and Train Operator PL 11.7% (166)
Delays not investigated by Network Rail OU 10.6% (151)
Uninvestigated Cancellations System Roll-Ups only ZW 6.6% (94)
Late arrival of booked inward stock YI 5.2% (74)
Driver TG 4.3% (61)
Late arrival of booked inward stock YI 2.5% (36)
Driver TG 2.5% (35)
Cable vandalism or theft XR 2.2% (31)
Uninvestigated Cancellations System Roll-Ups only ZW 2% (29)
Fatalities or injuries caused by being hit by train XC 2% (28)
Delays incurred on non-Network Rail running lines or networks including London Underground TX 2% (28)
Train cancelled or delayed at Train Operator's request TB 1.8% (26)
Depot operating problem MU 1.6% (23)
Fatalities or injuries caused by being hit by train XC 1.3% (19)
Train Describer/Panel/ARS/SSI/TDM/Remote Control failure IF 1.3% (19)
Other technical failures above the Solebar M8 1.1% (16)
Other technical failures below the solebar MD 1.1% (16)
Delays not investigated by Network Rail OU 0.8% (12)
Cable vandalism or theft XR 0.7% (10)
Train cancelled or delayed at Train Operator's request TB 0.7% (10)
Passenger taken ill on train VD 0.6% (9)
Track circuit failure (including no fault found) IC 0.6% (9)
Broken/cracked/twisted/buckled/flawed rail IR 0.6% (8)
Other FOC causes including mishaps FZ 0.6% (8)
Other Passenger Train Operating Company causes TZ 0.6% (8)
Exclusion commercially agreed and documented between Network Rail and Train Operator PL 0.6% (8)
Planned underpowered or shortformed service or vehicle MS 0.6% (8)
Other technical failures above the Solebar M8 0.5% (7)
No Cause Identified After Full Investigation by Both Parties ZU 0.5% (7)
Trespass including non-intentional XA 0.4% (6)
Confirmed train cab based safety system fault including GSM-R M0 0.4% (6)
Brake and brake system faults including wheel flats MN 0.4% (6)
Other technical failures below the solebar MD 0.4% (6)
Track defects other than rail defects IS 0.4% (5)
Cancellation of a duplicate or erroneous schedule or an identified duplicate, false or erroneous delay PJ 0.4% (5)
Track circuit failure (including no fault found) IC 0.4% (5)
Depot operating problem MU 0.4% (5)
Door and Door system faults M7 0.4% (5)
Disorder, drunks or trespass VA 0.3% (4)

All trains in the network

StateAll Passenger
Arrived 28,274 21,866
Planned 2,461 58
Never activated 1,658 433
Cancelled 1,419 566
En route 40 9