5th November 2026
33,825Trains22,878 carrying passengers
89.8%On timeof those that arrived
2.1 minAverage delayat their last call
375Cancelledplanned ones included
599Part cancelledran for only part of the journey
621No arrival reportedstarted, then went quiet
0Stopped shortdid not reach the last stop
By operator least punctual first
| Operator | Tracked | On time | Late | Cancelled | Part cancelled | Average delay |
|---|---|---|---|---|---|---|
| London North Eastern Railway | 201 | 46.9% | 76 | 34 | 25 | 21.6 min |
| Lumo | 23 | 71.4% | 6 | 0 | 2 | 9.5 min |
| Eurostar | 25 | 75% | 6 | 1 | 0 | 3.4 min |
| CrossCountry | 279 | 80.1% | 52 | 9 | 9 | 5.8 min |
| Avanti West Coast | 318 | 80.5% | 61 | 0 | 5 | 5.7 min |
| Tyne and Wear Metro | 89 | 80.7% | 17 | 0 | 1 | 2.7 min |
| Great Northern | 401 | 82.3% | 62 | 17 | 34 | 4 min |
| Chiltern Railways | 350 | 82.4% | 54 | 36 | 8 | 6.3 min |
| TransPennine Express | 319 | 84.9% | 47 | 2 | 5 | 4 min |
| Great Western Railway | 1,799 | 85.9% | 246 | 13 | 37 | 2.3 min |
| Northern | 2,733 | 87.5% | 336 | 10 | 34 | 2.1 min |
| ScotRail | 2,280 | 87.6% | 273 | 33 | 49 | 2.4 min |
| London Underground | 189 | 88% | 18 | 39 | 0 | 2.1 min |
| South Western Railway | 1,610 | 88.8% | 176 | 3 | 37 | 2.1 min |
| Southeastern | 1,810 | 88.9% | 192 | 25 | 57 | 2.3 min |
| East Midlands Railway | 510 | 90.3% | 48 | 1 | 12 | 2.1 min |
| Transport for Wales | 1,070 | 90.8% | 87 | 59 | 69 | 2.1 min |
| Thameslink | 651 | 91.4% | 52 | 22 | 27 | 1.9 min |
| Elizabeth line | 697 | 92.5% | 51 | 0 | 16 | 1 min |
| West Midlands Trains | 1,319 | 93.1% | 85 | 41 | 45 | 1.2 min |
| London Overground | 1,542 | 93.8% | 91 | 14 | 55 | 1.3 min |
| Southern | 1,700 | 94% | 100 | 5 | 28 | 1.7 min |
| c2c | 268 | 94% | 15 | 1 | 18 | 1.6 min |
| Gatwick Express | 72 | 95.7% | 3 | 0 | 2 | 3.2 min |
| Greater Anglia | 1,306 | 98.1% | 25 | 8 | 14 | on time |
| Merseyrail | 618 | 99.2% | 5 | 2 | 2 | on time |
| Heathrow Express | 152 | 100% | 0 | 0 | 0 | 0.2 min early |
| South Yorkshire Supertram | 37 | 100% | 0 | 0 | 0 | 0.3 min |
Punctuality
| Trains | Ran | Arrived | On time | Average delay |
|---|---|---|---|---|
| Other (5 min) | 15,152 | 15,152 | 89.7% | 1.5 min |
| Long distance (10 min) | 6,287 | 6,286 | 89.9% | 3.7 min |
Cancellations
| Kind | Trains | Share |
|---|---|---|
| Attributed | 307 | 81.9% |
| Unexplained | 64 | 17.1% |
| Planned | 2 | 0.5% |
| Reported by National Rail | 2 | 0.5% |
Why most common first
| Reason | Code | Share |
|---|---|---|
| Cancelled at the freight operator's request, or planned not to run | FL | 21.2% (314) |
| Agreed in advance between Network Rail and the operator | PL | 12.4% (184) |
| Not investigated by Network Rail | OU | 12.4% (184) |
| Not yet investigated | ZW | 10% (148) |
| The train due to form it arrived late | YI | 4.9% (73) |
| At the train operator's request | TB | 4.5% (66) |
| Fatalities or injuries caused by being hit by train | XC | 4.1% (60) |
| Track circuit failure (including no fault found) | IC | 3.9% (58) |
| Delays incurred on non-Network Rail running lines or networks including London Underground | TX | 3% (45) |
| Axle Counter Failure | J3 | 2% (30) |
| Other technical failures below the solebar | MD | 1.6% (24) |
| Brake and brake system faults including wheel flats | MN | 1.5% (23) |
| Driver | TG | 1.4% (22) |
| Other technical failures (doors, body or interior) | M8 | 1.4% (21) |
| WTT Schedule or LTP process including incorrect simplifiers | QA | 1.2% (17) |
| Overhead line/3rd rail defect | I1 | 0.8% (12) |
| Fatalities or injuries sustained whilst on a platform | VC | 0.6% (9) |
| Time lost en-route believed to be Operator cause and information required from Operator | TO | 0.5% (8) |
| Cancellation of a duplicate or erroneous schedule or an identified duplicate, false or erroneous delay | PJ | 0.5% (8) |
| Delay due to incorrect ETCS system or equipment operation by Driver | TS | 0.5% (8) |
| Confirmed train cab based safety system fault including GSM-R | M0 | 0.5% (8) |
| Train-crew rostering problem | TI | 0.5% (8) |
| Depot operating problem | MU | 0.5% (7) |
| Signal failure (including no fault found) | IA | 0.5% (7) |
| Lost path - following another later running train | YD | 0.4% (6) |
| Bridge Strike | XP | 0.4% (6) |
| Uninvestigated Late Start System Roll-Ups only | ZX | 0.4% (6) |
All trains in the network
| State | All | Passenger |
|---|---|---|
| Arrived | 29,366 | 21,850 |
| Planned | 2,360 | 60 |
| Cancelled | 1,478 | 565 |
| No arrival reported | 621 | 403 |