The railway on 6th November 2026

TrainTimesLive
Menu Close menu

6th November 2026

33,650Trains22,918 carrying passengers
90.7%On timeof those that arrived
1.9 minAverage delayat their last call
419Cancelledplanned ones included
565Part cancelledran for only part of the journey
819No arrival reportedstarted, then went quiet
0Stopped shortdid not reach the last stop

By operator least punctual first

OperatorTrackedOn time LateCancelledPart cancelledAverage delay
Eurostar 27 63% 10 0 0 5.9 min
London North Eastern Railway 200 68% 62 4 2 8.1 min
CrossCountry 282 71.8% 68 7 34 7.4 min
TransPennine Express 320 77.2% 66 1 30 5.6 min
Lumo 22 81.8% 4 0 0 4 min
Avanti West Coast 318 81.9% 57 3 0 5.6 min
Northern 2,753 84.2% 421 32 61 2.6 min
Great Northern 400 85.2% 57 2 12 2.6 min
London Underground 231 85.7% 14 129 4 2 min
East Midlands Railway 506 86% 69 4 10 3 min
Great Western Railway 1,761 86.8% 220 57 40 2.3 min
Transport for Wales 1,074 89.1% 111 1 50 2.6 min
West Midlands Trains 1,312 90.7% 116 26 41 1.6 min
c2c 269 92.2% 19 3 22 1.8 min
South Western Railway 1,615 92.4% 117 5 37 1.5 min
ScotRail 2,281 92.7% 160 31 47 1.7 min
Gatwick Express 72 93.8% 3 22 2 3.8 min
Southern 1,694 94.5% 91 36 17 1.4 min
South Yorkshire Supertram 37 94.6% 2 0 0 1.4 min
Chiltern Railways 348 95.1% 17 0 2 0.7 min
Greater Anglia 1,309 95.2% 62 5 15 0.5 min
Elizabeth line 696 95.2% 33 0 7 0.8 min
Thameslink 651 95.4% 29 9 15 1.3 min
London Overground 1,537 95.6% 62 37 87 1 min
Southeastern 1,810 95.9% 74 1 15 0.8 min
Merseyrail 636 96.1% 24 2 13 0.8 min
Tyne and Wear Metro 88 96.5% 3 2 0 1 min
Heathrow Express 152 100% 0 0 0 0.2 min

Punctuality

TrainsRan ArrivedOn time Average delay
Other (5 min) 15,091 15,089 90.6% 1.4 min
Long distance (10 min) 6,370 6,337 91% 3 min

Cancellations

KindTrains Share
Attributed 383 91.4%
Unexplained 29 6.9%
Reported by National Rail 5 1.2%
Planned 2 0.5%

Why most common first

ReasonCode Share
Cancelled at the freight operator's request, or planned not to run FL 21.3% (330)
Not investigated by Network Rail OU 12.5% (194)
Agreed in advance between Network Rail and the operator PL 9.8% (153)
External trees, buildings or structures encroaching or falling onto infrastructure XO 9.4% (147)
The train due to form it arrived late YI 5.8% (90)
Not yet investigated ZW 5.2% (81)
At the train operator's request TB 4.3% (67)
Track circuit failure (including no fault found) IC 3.8% (58)
Driver TG 3.4% (54)
Other technical failures below the solebar MD 2.3% (36)
Other technical failures (doors, body or interior) M8 1.9% (29)
Delays incurred on non-Network Rail running lines or networks including London Underground TX 1.7% (26)
WTT Schedule or LTP process including incorrect simplifiers QA 1.4% (21)
Train Describer/Panel/ARS/SSI/TDM/Remote Control failure IF 0.9% (14)
Depot operating problem MU 0.8% (13)
Uninvestigated Late Start System Roll-Ups only ZX 0.8% (12)
Train-crew rostering problem TI 0.6% (10)
Time lost en-route believed to be Operator cause and information required from Operator TO 0.6% (9)
Planned underpowered or shortformed service or vehicle MS 0.5% (8)
Vandalism or theft VB 0.5% (7)
Points failure (including no fault found) IB 0.5% (7)
Disorder, drunks or trespass VA 0.4% (6)
Cancellation of a duplicate or erroneous schedule or an identified duplicate, false or erroneous delay PJ 0.4% (6)
Confirmed train cab based safety system fault including GSM-R M0 0.4% (6)
Delay due to incorrect ETCS system or equipment operation by Driver TS 0.4% (6)
No Cause Identified After Full Investigation by Both Parties ZU 0.4% (6)
National Grid power failure - local area also affected XK 0.4% (6)
Late presentation from the continent TN 0.3% (5)
Door and Door system faults M7 0.3% (5)

All trains in the network

StateAll Passenger
Arrived 28,889 21,834
Planned 2,387 60
Cancelled 1,555 617
No arrival reported 819 407