19th November 2026
34,324Trains23,080 carrying passengers
89%On timeof those that arrived
2.4 minAverage delayat their last call
550Cancelledplanned ones included
847Part cancelledran for only part of the journey
769No arrival reportedstarted, then went quiet
0Stopped shortdid not reach the last stop
By operator least punctual first
| Operator | Tracked | On time | Late | Cancelled | Part cancelled | Average delay |
|---|---|---|---|---|---|---|
| London North Eastern Railway | 199 | 38.2% | 84 | 42 | 21 | 38.2 min |
| Eurostar | 26 | 53.8% | 12 | 0 | 0 | 8.6 min |
| TransPennine Express | 325 | 62.6% | 96 | 9 | 59 | 9.2 min |
| CrossCountry | 286 | 67.4% | 74 | 10 | 49 | 11.1 min |
| Avanti West Coast | 318 | 76.4% | 74 | 1 | 3 | 7.4 min |
| c2c | 370 | 79.7% | 47 | 95 | 45 | 4.5 min |
| Northern | 2,737 | 82.2% | 457 | 51 | 124 | 3.2 min |
| Thameslink | 654 | 86.5% | 72 | 63 | 73 | 3.1 min |
| Southeastern | 1,804 | 86.8% | 232 | 13 | 28 | 2.6 min |
| East Midlands Railway | 506 | 87.7% | 60 | 2 | 17 | 3 min |
| Great Northern | 402 | 89.1% | 37 | 22 | 42 | 2.3 min |
| West Midlands Trains | 1,319 | 89.2% | 137 | 14 | 35 | 1.9 min |
| Great Western Railway | 1,712 | 89.3% | 176 | 19 | 42 | 2.1 min |
| Gatwick Express | 72 | 90.3% | 6 | 4 | 6 | 3 min |
| South Western Railway | 1,609 | 91% | 142 | 4 | 29 | 1.8 min |
| Elizabeth line | 695 | 91.3% | 58 | 6 | 19 | 1.4 min |
| London Underground | 181 | 91.6% | 13 | 26 | 0 | 1.4 min |
| ScotRail | 2,290 | 92% | 170 | 85 | 81 | 1.6 min |
| London Overground | 1,614 | 93.3% | 104 | 7 | 53 | 1.4 min |
| Transport for Wales | 1,062 | 93.3% | 67 | 15 | 46 | 1.2 min |
| Southern | 1,699 | 93.5% | 106 | 31 | 41 | 1.5 min |
| Greater Anglia | 1,308 | 95.5% | 57 | 11 | 18 | 0.5 min |
| Heathrow Express | 152 | 95.9% | 6 | 4 | 1 | 1.4 min |
| Tyne and Wear Metro | 88 | 96.5% | 3 | 2 | 1 | 1.1 min |
| South Yorkshire Supertram | 39 | 97.4% | 1 | 0 | 0 | 1.2 min |
| Chiltern Railways | 340 | 98.2% | 6 | 0 | 0 | 0.1 min |
| Island Line | 66 | 98.5% | 1 | 4 | 0 | 0.2 min |
| Merseyrail | 622 | 98.7% | 8 | 4 | 3 | 0.2 min early |
Punctuality
| Trains | Ran | Arrived | On time | Average delay |
|---|---|---|---|---|
| Long distance (10 min) | 6,054 | 6,048 | 87.3% | 4.6 min |
| Other (5 min) | 15,113 | 15,112 | 89.7% | 1.5 min |
Cancellations
| Kind | Trains | Share |
|---|---|---|
| Attributed | 480 | 87.3% |
| Unexplained | 44 | 8% |
| Reported by National Rail | 18 | 3.3% |
| Planned | 8 | 1.5% |
Why most common first
| Reason | Code | Share |
|---|---|---|
| Cancelled at the freight operator's request, or planned not to run | FL | 20.3% (368) |
| Not investigated by Network Rail | OU | 10.7% (194) |
| Agreed in advance between Network Rail and the operator | PL | 10% (181) |
| Fatalities or injuries caused by being hit by train | XC | 8.1% (147) |
| Not yet investigated | ZW | 6.9% (126) |
| The train due to form it arrived late | YI | 5.7% (103) |
| AC/DC trip (including no fault or cause found) | I2 | 4.7% (86) |
| Power supply and distribution system failure | IH | 3.9% (71) |
| At the train operator's request | TB | 3.6% (65) |
| Confirmed Pantograph ADD, shoe beam or associated system faults | M1 | 3.4% (62) |
| Delays incurred on non-Network Rail running lines or networks including London Underground | TX | 1.7% (30) |
| Other technical failures (doors, body or interior) | M8 | 1.6% (30) |
| Driver | TG | 1.4% (25) |
| Other technical failures below the solebar | MD | 1.3% (23) |
| Overhead line/3rd rail defect | I1 | 1% (18) |
| Points failure (including no fault found) | IB | 0.8% (14) |
| Brake and brake system faults including wheel flats | MN | 0.6% (11) |
| Time lost en-route believed to be Operator cause and information required from Operator | TO | 0.6% (11) |
| Cancellation of a duplicate or erroneous schedule or an identified duplicate, false or erroneous delay | PJ | 0.5% (9) |
| Confirmed train cab based safety system fault including GSM-R | M0 | 0.5% (9) |
| Train-crew rostering problem | TI | 0.5% (9) |
| Planned underpowered or shortformed service or vehicle | MS | 0.5% (9) |
| Senior Conductor or Train Manager | TH | 0.5% (9) |
| Depot operating problem | MU | 0.4% (8) |
| Train Describer/Panel/ARS/SSI/TDM/Remote Control failure | IF | 0.4% (8) |
| Level crossing faults and failure | ID | 0.4% (7) |
| WTT Schedule or LTP process including incorrect simplifiers | QA | 0.4% (7) |
| Possession over-run from planned work | I5 | 0.3% (6) |
All trains in the network
| State | All | Passenger |
|---|---|---|
| Arrived | 29,099 | 21,732 |
| Planned | 2,498 | 64 |
| Cancelled | 1,812 | 842 |
| No arrival reported | 769 | 403 |
| En route | 142 | 39 |
| Activated | 4 | 0 |