The railway on 14th September 2026

TrainTimesLive
Menu Close menu

14th September 2026

33,526Trains22,919 carrying passengers
90%On timeof those that arrived
2.2 minAverage delayat their last call
667Cancelledplanned ones included
772Part cancelledran for only part of the journey
1,357Never activatedbooked, and never appeared
0Stopped shortdid not reach the last stop

By operator least punctual first

OperatorTrackedOn time LateCancelledPart cancelledAverage delay
Avanti West Coast 317 49.5% 149 10 12 13.6 min
Eurostar 29 70.4% 8 2 0 6.2 min
CrossCountry 280 72.9% 69 8 17 7.5 min
Thameslink 664 75.4% 121 108 64 4.7 min
Great Northern 395 77.4% 72 33 43 4.3 min
East Midlands Railway 501 78.6% 98 15 27 4.4 min
London North Eastern Railway 200 84% 32 0 0 4.7 min
Gatwick Express 72 84.3% 11 0 2 4 min
Great Western Railway 1,700 84.6% 216 196 103 3.9 min
TransPennine Express 318 86.3% 41 1 18 3.2 min
Southeastern 1,790 86.9% 223 22 61 2.8 min
Southern 1,649 89.5% 164 12 70 2.4 min
Chiltern Railways 349 89.9% 34 5 6 2.1 min
West Midlands Trains 1,268 90.8% 110 33 37 1.5 min
Elizabeth line 695 90.9% 57 15 56 1.6 min
Northern 2,721 91.3% 230 32 48 1.4 min
c2c 338 92.6% 24 0 12 2.4 min
South Western Railway 1,616 92.9% 112 9 28 1.6 min
Transport for Wales 1,024 92.9% 69 9 41 1.3 min
Greater Anglia 1,306 93.6% 82 5 17 1.1 min
Tyne and Wear Metro 88 94.3% 5 0 0 0.9 min
London Underground 201 95% 7 62 0 0.8 min
ScotRail 2,278 96% 90 27 16 0.9 min
London Overground 1,603 96.2% 57 43 75 1.2 min
Merseyrail 622 99.8% 1 0 6 0.3 min early
Heathrow Express 152 100% 0 6 0 0.6 min
Island Line 52 100% 0 0 0 0.4 min early
South Yorkshire Supertram 37 100% 0 0 0 0.1 min early

Punctuality

TrainsRan ArrivedOn time Average delay
Other (5 min) 14,932 14,932 91.4% 1.3 min
Long distance (10 min) 6,051 6,051 86.4% 4.4 min

Cancellations

KindTrains Share
Attributed 558 83.7%
Unexplained 86 12.9%
Planned 15 2.2%
Reported by Darwin 8 1.2%

Why most common first

ReasonCode Share
Train cancelled at FOC request or planned not to run FL 17% (326)
Delays not investigated by Network Rail OU 10.4% (200)
Uninvestigated Cancellations System Roll-Ups only ZW 8.2% (158)
Exclusion commercially agreed and documented between Network Rail and Train Operator PL 8.1% (156)
Late arrival of booked inward stock YI 6.6% (126)
Fatalities or injuries caused by being hit by train XC 4% (76)
Delays incurred on non-Network Rail running lines or networks including London Underground TX 3.6% (69)
Train cancelled or delayed at Train Operator's request TB 2.7% (52)
Driver TG 2.5% (49)
Late arrival of booked inward stock YI 2.5% (48)
Fatalities or injuries caused by being hit by train XC 2.4% (47)
Track circuit failure (including no fault found) IC 1.9% (37)
Axle Counter Failure J3 1.8% (34)
Broken/cracked/twisted/buckled/flawed rail IR 1.8% (34)
Uninvestigated Cancellations System Roll-Ups only ZW 1.7% (32)
Broken/cracked/twisted/buckled/flawed rail IR 1.6% (31)
Other technical failures above the Solebar M8 1.2% (24)
WTT Schedule or LTP process including incorrect simplifiers QA 1.2% (23)
Points failure (including no fault found) IB 1.1% (22)
Train cancelled or delayed at Train Operator's request TB 1% (20)
Other Passenger Train Operating Company causes TZ 1% (19)
Other technical failures above the Solebar M8 0.8% (16)
Depot operating problem MU 0.8% (15)
Other technical failures below the solebar MD 0.8% (15)
Planned underpowered or shortformed service or vehicle MS 0.8% (15)
Cancellation of a duplicate or erroneous schedule or an identified duplicate, false or erroneous delay PJ 0.7% (14)
Points failure (including no fault found) IB 0.7% (14)
Track defects other than rail defects IS 0.7% (13)
Axle Counter Failure J3 0.7% (13)
Delays not investigated by Network Rail OU 0.6% (11)
Track circuit failure (including no fault found) IC 0.6% (11)
Driver TG 0.5% (10)
Uninvestigated Late Start System Roll-Ups only ZX 0.4% (8)
Late arrival of booked inward train-crew YJ 0.4% (8)
Other technical failures below the solebar MD 0.4% (8)
Signal failure (including no fault found) IA 0.4% (7)
Confirmed train cab based safety system fault including GSM-R M0 0.4% (7)
Senior Conductor or Train Manager TH 0.4% (7)
Trespass including non-intentional XA 0.3% (6)
Security alert affecting the Network Rail Network XI 0.3% (6)

All trains in the network

StateAll Passenger
Arrived 27,730 21,463
Planned 2,516 60
Cancelled 1,923 961
Never activated 1,357 435