The railway on 25th September 2026

TrainTimesLive
Menu Close menu

25th September 2026

34,155Trains23,133 carrying passengers
91.1%On timeof those that arrived
1.9 minAverage delayat their last call
377Cancelledplanned ones included
756Part cancelledran for only part of the journey
1,575Never activatedbooked, and never appeared
0Stopped shortdid not reach the last stop

By operator least punctual first

OperatorTrackedOn time LateCancelledPart cancelledAverage delay
Gatwick Express 72 76.8% 13 6 10 7.5 min
CrossCountry 280 79.9% 51 2 24 6.8 min
Great Northern 400 80.5% 71 12 23 3.7 min
London North Eastern Railway 199 81.9% 36 0 0 4.8 min
East Midlands Railway 501 84.1% 77 2 14 3.7 min
Great Western Railway 1,715 84.5% 256 23 38 3.1 min
Eurostar 29 86.2% 4 0 0 3.6 min
Elizabeth line 687 87.7% 80 2 33 1.7 min
Avanti West Coast 317 87.7% 39 0 0 4.3 min
Southeastern 1,807 87.9% 210 19 52 2.4 min
South Western Railway 1,615 89.3% 151 60 150 2 min
London Underground 192 90.1% 13 60 1 1.3 min
Northern 2,775 90.2% 261 37 78 1.7 min
Southern 1,687 90.3% 150 66 80 2.5 min
Thameslink 650 90.8% 52 10 73 2.2 min
TransPennine Express 356 92% 27 0 17 2.5 min
Heathrow Express 152 92.1% 12 0 0 2.9 min
West Midlands Trains 1,319 93.6% 82 4 27 1.1 min
Transport for Wales 990 93.6% 60 7 42 0.9 min
c2c 363 94.4% 20 2 7 1.9 min
ScotRail 2,281 95.7% 95 11 21 0.9 min
Greater Anglia 1,307 96.1% 50 4 14 0.6 min
London Overground 1,608 96.2% 58 38 32 1 min
Tyne and Wear Metro 87 96.6% 3 0 0 0.9 min
Chiltern Railways 349 96.8% 11 0 1 0.7 min
Merseyrail 622 97.2% 17 2 18 0.1 min
South Yorkshire Supertram 38 97.4% 1 0 0 0.5 min
Island Line 52 100% 0 0 0 0.6 min early

Punctuality

TrainsRan ArrivedOn time Average delay
Other (5 min) 15,230 15,201 92% 1.2 min
Long distance (10 min) 6,260 6,260 88.8% 3.6 min

Cancellations

KindTrains Share
Attributed 340 90.2%
Unexplained 21 5.6%
Planned 8 2.1%
Reported by Darwin 8 2.1%

Why most common first

ReasonCode Share
Train cancelled at FOC request or planned not to run FL 25.4% (410)
Delays not investigated by Network Rail OU 11.5% (186)
Exclusion commercially agreed and documented between Network Rail and Train Operator PL 9.2% (149)
Late arrival of booked inward stock YI 6.9% (111)
Uninvestigated Cancellations System Roll-Ups only ZW 5.3% (86)
Delays incurred on non-Network Rail running lines or networks including London Underground TX 3.8% (62)
Other technical failures above the Solebar M8 3.2% (52)
Train cancelled or delayed at Train Operator's request TB 2.9% (47)
Late arrival of booked inward stock YI 1.9% (30)
Driver TG 1.4% (23)
WTT Schedule or LTP process including incorrect simplifiers QA 1.4% (22)
Fatalities or injuries caused by being hit by train XC 1.3% (21)
Driver TG 1.2% (20)
Train cancelled or delayed at Train Operator's request TB 1.2% (19)
Fatalities or injuries caused by being hit by train XC 1.1% (18)
Uninvestigated Cancellations System Roll-Ups only ZW 1.1% (17)
Other technical failures below the solebar MD 1% (16)
Door and Door system faults M7 0.9% (15)
Track defects other than rail defects IS 0.8% (13)
Other technical failures above the Solebar M8 0.8% (13)
Track circuit failure (including no fault found) IC 0.7% (12)
Delays not investigated by Network Rail OU 0.7% (12)
Track circuit failure (including no fault found) IC 0.7% (12)
Time lost en-route believed to be Operator cause and information required from Operator TO 0.7% (11)
Trespass including non-intentional XA 0.7% (11)
Depot operating problem MU 0.6% (10)
Fatalities or injuries sustained whilst on a platform VC 0.6% (10)
Track defects other than rail defects IS 0.6% (9)
Senior Conductor or Train Manager TH 0.5% (8)
Planned cancellation identified and agreed prior to 22.00 the day before the schedule runs PG 0.5% (8)
Train-crew rostering problem TI 0.5% (8)
Trespass including non-intentional XA 0.5% (8)
Door and Door system faults M7 0.4% (7)
Axle Counter Failure J3 0.4% (7)
Confirmed train cab based safety system fault including GSM-R M0 0.4% (7)
Senior Conductor or Train Manager TH 0.4% (7)
Other Passenger Train Operating Company causes TZ 0.4% (7)
Animal Strike or Incursion within the control of Network Rail I8 0.4% (6)
Other FOC causes including mishaps FZ 0.4% (6)
Train cancelled at FOC request or planned not to run FL 0.3% (5)

All trains in the network

StateAll Passenger
Arrived 28,368 22,031
Planned 2,600 65
Cancelled 1,612 607
Never activated 1,575 430