The railway on 14th October 2026

TrainTimesLive
Menu Close menu

14th October 2026

33,918Trains22,940 carrying passengers
89.5%On timeof those that arrived
2.2 minAverage delayat their last call
437Cancelledplanned ones included
701Part cancelledran for only part of the journey
1,412Never activatedbooked, and never appeared
0Stopped shortdid not reach the last stop

By operator least punctual first

OperatorTrackedOn time LateCancelledPart cancelledAverage delay
Avanti West Coast 316 61% 114 12 12 11.3 min
Eurostar 25 68% 8 0 0 4 min
Grand Central 20 75% 5 0 0 5 min
Great Northern 399 78.9% 81 1 15 3.9 min
CrossCountry 278 81.3% 47 11 15 5.6 min
East Midlands Railway 501 81.6% 78 45 31 4.7 min
Southeastern 1,803 81.8% 312 17 77 3.5 min
London North Eastern Railway 200 84.2% 31 1 3 4.5 min
Elizabeth line 695 84.6% 97 18 48 2.6 min
c2c 364 85.1% 52 4 10 3.3 min
Thameslink 650 86.3% 64 94 91 3.4 min
Great Western Railway 1,690 86.9% 214 26 36 2.6 min
TransPennine Express 318 87.5% 38 2 13 3.4 min
ScotRail 2,206 89.6% 225 9 37 2 min
West Midlands Trains 1,328 90% 127 10 42 1.8 min
Northern 2,750 90.3% 259 27 50 1.7 min
Transport for Wales 1,064 90.3% 89 65 85 1.8 min
Chiltern Railways 352 91.3% 30 2 4 2.2 min
London Overground 1,604 93.7% 94 35 67 1.3 min
Heathrow Express 152 93.7% 9 10 0 3 min
Island Line 52 94.2% 3 0 0 0.4 min
Southern 1,699 94.5% 92 4 28 1.6 min
London Underground 181 94.8% 8 26 1 0.9 min
South Western Railway 1,613 95% 80 5 23 1.1 min
Greater Anglia 1,307 96.5% 46 2 5 0.4 min
Tyne and Wear Metro 87 96.6% 3 0 0 1 min
Merseyrail 618 98.4% 10 3 5 0.1 min
Gatwick Express 72 98.6% 1 0 0 2.9 min
South Yorkshire Supertram 37 100% 0 0 0 0.7 min

Punctuality

TrainsRan ArrivedOn time Average delay
Long distance (10 min) 6,205 6,205 87.4% 4.1 min
Other (5 min) 15,115 15,115 90.4% 1.4 min

Cancellations

KindTrains Share
Attributed 401 91.8%
Unexplained 20 4.6%
Reported by Darwin 14 3.2%
Planned 2 0.5%

Why most common first

ReasonCode Share
Train cancelled at FOC request or planned not to run FL 21.1% (338)
Delays not investigated by Network Rail OU 11.1% (178)
Exclusion commercially agreed and documented between Network Rail and Train Operator PL 10.6% (170)
Late arrival of booked inward stock YI 7.8% (125)
Fatalities or injuries caused by being hit by train XC 6.7% (107)
Uninvestigated Cancellations System Roll-Ups only ZW 3.8% (61)
Fatalities or injuries caused by being hit by train XC 3.4% (55)
Trespass including non-intentional XA 2.5% (40)
Delays incurred on non-Network Rail running lines or networks including London Underground TX 1.9% (31)
Late arrival of booked inward stock YI 1.9% (31)
Train cancelled or delayed at Train Operator's request TB 1.8% (28)
Trespass including non-intentional XA 1.5% (24)
Uninvestigated Cancellations System Roll-Ups only ZW 1.5% (24)
Train cancelled or delayed at Train Operator's request TB 1.4% (23)
Diesel loco failure, defect, attention MC 1.1% (18)
Other technical failures below the solebar MD 1.1% (17)
Uninvestigated Late Start System Roll-Ups only ZX 1.1% (17)
Other technical failures above the Solebar M8 1% (16)
External trees, buildings or structures encroaching or falling onto infrastructure XO 0.8% (13)
Other technical failures below the solebar MD 0.8% (13)
Brake and brake system faults including wheel flats MN 0.8% (12)
External trees, buildings or structures encroaching or falling onto infrastructure XO 0.7% (11)
Track defects other than rail defects IS 0.6% (10)
No Cause Identified After Full Investigation by Both Parties ZU 0.6% (10)
Time lost en-route believed to be Operator cause and information required from Operator TO 0.6% (10)
Driver TG 0.6% (10)
Track defects other than rail defects IS 0.6% (9)
Points failure (including no fault found) IB 0.6% (9)
Diesel loco failure, defect, attention MC 0.6% (9)
WTT Schedule or LTP process including incorrect simplifiers QA 0.6% (9)
Not in the published list RA 0.6% (9)
Depot operating problem MU 0.5% (8)
Driver TG 0.4% (7)
Other technical failures above the Solebar M8 0.4% (7)
Disorder, drunks or trespass VA 0.4% (6)
Other FOC causes including mishaps FZ 0.4% (6)
Cancellation of a duplicate or erroneous schedule or an identified duplicate, false or erroneous delay PJ 0.3% (5)
Train cancelled at FOC request or planned not to run FL 0.3% (5)
Brake and brake system faults including wheel flats MN 0.3% (5)
Road or crossing related incidents including cars on the line XN 0.3% (5)

All trains in the network

StateAll Passenger
Arrived 28,401 21,783
Planned 2,506 66
Cancelled 1,599 681
Never activated 1,412 410