6th November 2026
33,650Trains22,918 carrying passengers
90.7%On timeof those that arrived
1.9 minAverage delayat their last call
419Cancelledplanned ones included
565Part cancelledran for only part of the journey
819No arrival reportedstarted, then went quiet
0Stopped shortdid not reach the last stop
By operator least punctual first
| Operator | Tracked | On time | Late | Cancelled | Part cancelled | Average delay |
|---|---|---|---|---|---|---|
| Eurostar | 27 | 63% | 10 | 0 | 0 | 5.9 min |
| London North Eastern Railway | 200 | 68% | 62 | 4 | 2 | 8.1 min |
| CrossCountry | 282 | 71.8% | 68 | 7 | 34 | 7.4 min |
| TransPennine Express | 320 | 77.2% | 66 | 1 | 30 | 5.6 min |
| Lumo | 22 | 81.8% | 4 | 0 | 0 | 4 min |
| Avanti West Coast | 318 | 81.9% | 57 | 3 | 0 | 5.6 min |
| Northern | 2,753 | 84.2% | 421 | 32 | 61 | 2.6 min |
| Great Northern | 400 | 85.2% | 57 | 2 | 12 | 2.6 min |
| London Underground | 231 | 85.7% | 14 | 129 | 4 | 2 min |
| East Midlands Railway | 506 | 86% | 69 | 4 | 10 | 3 min |
| Great Western Railway | 1,761 | 86.8% | 220 | 57 | 40 | 2.3 min |
| Transport for Wales | 1,074 | 89.1% | 111 | 1 | 50 | 2.6 min |
| West Midlands Trains | 1,312 | 90.7% | 116 | 26 | 41 | 1.6 min |
| c2c | 269 | 92.2% | 19 | 3 | 22 | 1.8 min |
| South Western Railway | 1,615 | 92.4% | 117 | 5 | 37 | 1.5 min |
| ScotRail | 2,281 | 92.7% | 160 | 31 | 47 | 1.7 min |
| Gatwick Express | 72 | 93.8% | 3 | 22 | 2 | 3.8 min |
| Southern | 1,694 | 94.5% | 91 | 36 | 17 | 1.4 min |
| South Yorkshire Supertram | 37 | 94.6% | 2 | 0 | 0 | 1.4 min |
| Chiltern Railways | 348 | 95.1% | 17 | 0 | 2 | 0.7 min |
| Greater Anglia | 1,309 | 95.2% | 62 | 5 | 15 | 0.5 min |
| Elizabeth line | 696 | 95.2% | 33 | 0 | 7 | 0.8 min |
| Thameslink | 651 | 95.4% | 29 | 9 | 15 | 1.3 min |
| London Overground | 1,537 | 95.6% | 62 | 37 | 87 | 1 min |
| Southeastern | 1,810 | 95.9% | 74 | 1 | 15 | 0.8 min |
| Merseyrail | 636 | 96.1% | 24 | 2 | 13 | 0.8 min |
| Tyne and Wear Metro | 88 | 96.5% | 3 | 2 | 0 | 1 min |
| Heathrow Express | 152 | 100% | 0 | 0 | 0 | 0.2 min |
Punctuality
| Trains | Ran | Arrived | On time | Average delay |
|---|---|---|---|---|
| Other (5 min) | 15,091 | 15,089 | 90.6% | 1.4 min |
| Long distance (10 min) | 6,370 | 6,337 | 91% | 3 min |
Cancellations
| Kind | Trains | Share |
|---|---|---|
| Attributed | 383 | 91.4% |
| Unexplained | 29 | 6.9% |
| Reported by National Rail | 5 | 1.2% |
| Planned | 2 | 0.5% |
Why most common first
| Reason | Code | Share |
|---|---|---|
| Cancelled at the freight operator's request, or planned not to run | FL | 21.3% (330) |
| Not investigated by Network Rail | OU | 12.5% (194) |
| Agreed in advance between Network Rail and the operator | PL | 9.8% (153) |
| External trees, buildings or structures encroaching or falling onto infrastructure | XO | 9.4% (147) |
| The train due to form it arrived late | YI | 5.8% (90) |
| Not yet investigated | ZW | 5.2% (81) |
| At the train operator's request | TB | 4.3% (67) |
| Track circuit failure (including no fault found) | IC | 3.8% (58) |
| Driver | TG | 3.4% (54) |
| Other technical failures below the solebar | MD | 2.3% (36) |
| Other technical failures (doors, body or interior) | M8 | 1.9% (29) |
| Delays incurred on non-Network Rail running lines or networks including London Underground | TX | 1.7% (26) |
| WTT Schedule or LTP process including incorrect simplifiers | QA | 1.4% (21) |
| Train Describer/Panel/ARS/SSI/TDM/Remote Control failure | IF | 0.9% (14) |
| Depot operating problem | MU | 0.8% (13) |
| Uninvestigated Late Start System Roll-Ups only | ZX | 0.8% (12) |
| Train-crew rostering problem | TI | 0.6% (10) |
| Time lost en-route believed to be Operator cause and information required from Operator | TO | 0.6% (9) |
| Planned underpowered or shortformed service or vehicle | MS | 0.5% (8) |
| Vandalism or theft | VB | 0.5% (7) |
| Points failure (including no fault found) | IB | 0.5% (7) |
| Disorder, drunks or trespass | VA | 0.4% (6) |
| Cancellation of a duplicate or erroneous schedule or an identified duplicate, false or erroneous delay | PJ | 0.4% (6) |
| Confirmed train cab based safety system fault including GSM-R | M0 | 0.4% (6) |
| Delay due to incorrect ETCS system or equipment operation by Driver | TS | 0.4% (6) |
| No Cause Identified After Full Investigation by Both Parties | ZU | 0.4% (6) |
| National Grid power failure - local area also affected | XK | 0.4% (6) |
| Late presentation from the continent | TN | 0.3% (5) |
| Door and Door system faults | M7 | 0.3% (5) |
All trains in the network
| State | All | Passenger |
|---|---|---|
| Arrived | 28,889 | 21,834 |
| Planned | 2,387 | 60 |
| Cancelled | 1,555 | 617 |
| No arrival reported | 819 | 407 |