The railway on 17th November 2026

TrainTimesLive
Menu Close menu

17th November 2026

34,136Trains22,982 carrying passengers
87%On timeof those that arrived
2.6 minAverage delayat their last call
456Cancelledplanned ones included
899Part cancelledran for only part of the journey
584No arrival reportedstarted, then went quiet
0Stopped shortdid not reach the last stop

By operator least punctual first

OperatorTrackedOn time LateCancelledPart cancelledAverage delay
Eurostar 24 39.1% 14 1 0 12.2 min
London North Eastern Railway 200 50% 100 0 0 13.3 min
Lumo 20 65% 7 0 0 7.6 min
c2c 372 66.7% 82 66 61 6.4 min
TransPennine Express 320 70.2% 81 9 39 7.2 min
Avanti West Coast 317 70.6% 91 2 6 9.4 min
CrossCountry 280 77.4% 57 12 16 7.5 min
East Midlands Railway 506 78.5% 104 10 13 4.8 min
Elizabeth line 697 79.1% 129 26 55 3 min
Great Northern 400 80.7% 74 2 15 3.3 min
Southeastern 1,802 82.8% 299 23 42 3.3 min
Northern 2,706 83% 428 46 145 2.8 min
South Western Railway 1,609 83.7% 242 41 82 2.9 min
Thameslink 654 85.8% 85 13 43 2.9 min
London Underground 190 87.2% 19 38 4 2.2 min
Transport for Wales 1,072 88.8% 105 8 129 2.2 min
West Midlands Trains 1,316 89.6% 131 16 40 1.8 min
Great Western Railway 1,726 90.8% 154 14 34 1.6 min
Southern 1,692 91.6% 136 25 46 2.1 min
Gatwick Express 72 91.7% 6 0 0 3.4 min
London Overground 1,612 91.9% 118 62 89 1.5 min
South Yorkshire Supertram 37 91.9% 3 0 0 0.5 min
ScotRail 2,271 92% 179 14 18 1.7 min
Heathrow Express 152 95.2% 7 6 0 1.8 min
Greater Anglia 1,307 95.7% 56 9 7 0.6 min
Tyne and Wear Metro 87 96.6% 3 0 0 1.1 min
Chiltern Railways 340 96.7% 11 4 4 0.7 min
Merseyrail 622 98.5% 9 7 11 on time
Island Line 66 100% 0 0 0 0.8 min early

Punctuality

TrainsRan ArrivedOn time Average delay
Long distance (10 min) 6,211 6,211 86.3% 4.4 min
Other (5 min) 14,949 14,949 87.3% 1.8 min

Cancellations

KindTrains Share
Attributed 423 92.8%
Unexplained 25 5.5%
Reported by National Rail 5 1.1%
Planned 3 0.7%

Why most common first

ReasonCode Share
Cancelled at the freight operator's request, or planned not to run FL 21.7% (379)
Agreed in advance between Network Rail and the operator PL 12.1% (212)
Not investigated by Network Rail OU 9.6% (168)
The train due to form it arrived late YI 9.5% (167)
Not yet investigated ZW 5.7% (99)
Track circuit failure (including no fault found) IC 4.5% (79)
At the train operator's request TB 4.3% (76)
Fatalities or injuries caused by being hit by train XC 3.2% (55)
Delays incurred on non-Network Rail running lines or networks including London Underground TX 2.9% (51)
Driver TG 2.4% (41)
Other technical failures (doors, body or interior) M8 2.2% (38)
Other technical failures below the solebar MD 1.9% (33)
Failure to maintain vegetation within network boundaries JP 1.7% (31)
Cutting or embankment earthslip, rock fall or subsidence IV 1.7% (30)
Brake and brake system faults including wheel flats MN 0.8% (14)
Uninvestigated Late Start System Roll-Ups only ZX 0.7% (13)
Points failure (including no fault found) IB 0.7% (13)
Depot operating problem MU 0.7% (12)
Time lost en-route believed to be Operator cause and information required from Operator TO 0.6% (12)
Trespass including non-intentional XA 0.6% (10)
WTT Schedule or LTP process including incorrect simplifiers QA 0.6% (10)
Uninvestigated Loss in Running System Roll-Up only ZZ 0.5% (9)
Flooding not due to exceptional weather JK 0.5% (9)
Door and Door system faults M7 0.3% (6)
Planned underpowered or shortformed service or vehicle MS 0.3% (6)

All trains in the network

StateAll Passenger
Arrived 29,305 21,761
Planned 2,498 62
Cancelled 1,749 759
No arrival reported 584 400