Daily performance
34,170 trains23,064 carrying passengers844 part cancelled716 no arrival reported0 stopped short
On time89.5%
of those that arrivedAverage delay2.1min
at their last callCancelled646(2.8%)
passenger trains that did not runDisruptionDisruption, 0 to 5Cancelled and late trains across the network over the day.0–1Running normally2–3Some delays4–5Serious disruptionMore in the glossary2
moderate · over the dayBy operator least punctual first · not coloured under 20 trains
| Operator | Trains | On time | Late | Cancelled | Part cancelled | Average delay |
|---|---|---|---|---|---|---|
| Caledonian Sleeper | 9 | 37.5%Too few trains to rate (8 arrived) | 5 | 1 | 0 | 35.3min |
| Lumo | 20 | 47.4%Too few trains to rate (19 arrived) | 10 | 0 | 1 | 15.8min |
| Eurostar | 29 | 48.3% | 15 | 0 | 0 | 11.2min |
| Grand Central | 20 | 55.6%Too few trains to rate (18 arrived) | 8 | 1 | 1 | 8.5min |
| Avanti West Coast | 318 | 61.7% | 116 | 4 | 11 | 11.0min |
| London North Eastern Railway | 201 | 63.2% | 71 | 2 | 7 | 10.9min |
| CrossCountry | 283 | 72.0% | 58 | 31 | 45 | 9.0min |
| TransPennine Express | 320 | 77.2% | 69 | 1 | 16 | 5.6min |
| Great Northern | 400 | 82.9% | 63 | 10 | 21 | 3.2min |
| Northern | 2,735 | 85.0% | 393 | 40 | 78 | 2.5min |
| Hull Trains | 14 | 85.7%Too few trains to rate (14 arrived) | 2 | 0 | 0 | 3.6min |
| Tyne and Wear Metro | 88 | 86.0% | 12 | 2 | 0 | 2.2min |
| East Midlands Railway | 507 | 87.0% | 63 | 2 | 19 | 2.8min |
| ScotRail | 2,288 | 87.6% | 263 | 84 | 65 | 2.8min |
| South Western Railway | 1,614 | 87.7% | 183 | 26 | 103 | 2.3min |
| London Underground | 296 | 88.2% | 8 | 224 | 4 | 1.8min |
| West Midlands Trains | 1,318 | 90.0% | 124 | 19 | 56 | 1.9min |
| Transport for Wales | 1,059 | 90.2% | 94 | 31 | 71 | 1.9min |
| Great Western Railway | 1,712 | 90.4% | 154 | 41 | 74 | 1.7min |
| Elizabeth line | 695 | 90.6% | 62 | 2 | 32 | 1.2min |
| Southeastern | 1,806 | 91.9% | 145 | 6 | 18 | 1.6min |
| Southern | 1,692 | 93.1% | 111 | 49 | 34 | 1.4min |
| c2c | 366 | 93.2% | 23 | 3 | 23 | 1.2min |
| London Overground | 1,613 | 94.1% | 90 | 13 | 62 | 1.3min |
| Thameslink | 652 | 94.8% | 29 | 13 | 79 | 1.4min |
| Greater Anglia | 1,312 | 97.2% | 36 | 10 | 16 | 0.0min |
| South Yorkshire Supertram | 37 | 97.3% | 1 | 0 | 0 | 0.6min |
| Chiltern Railways | 338 | 97.9% | 7 | 1 | 1 | 0.1min early |
| Island Line | 66 | 98.3% | 1 | 12 | 0 | 0.6min |
| Merseyrail | 622 | 98.4% | 10 | 3 | 5 | 0.2min |
| Heathrow Express | 152 | 98.7% | 2 | 3 | 0 | 1.1min |
| Gatwick Express | 72 | 100.0% | 0 | 8 | 2 | 2.0min |
| Not specified (freight or charter) | 4 | 0 | 4 | 0 | – |
Punctuality
| Trains | Ran | Arrived | On time | Average delay |
|---|---|---|---|---|
| Regional and commuter, within 5 minutes | 14,920 | 14,894 | 90.0% | 1.4 min |
| Long distance, within 10 minutes | 6,248 | 6,248 | 88.2% | 3.8 min |
Cancellations passenger trains that did not run at all
| Kind | Trains | Share |
|---|---|---|
| On the day, cause given | 586 | 90.7% |
| On the day, unexplained | 38 | 5.9% |
| National Rail only | 16 | 2.5% |
| Planned or excluded | 6 | 0.9% |
Why every cancelled train, freight included
| Reason | Code | Share |
|---|---|---|
| Cancelled at the freight operator's request, or planned not to run | FL | 20.9%(397) |
| Delays incurred on non-Network Rail running lines or networks including London Underground | TX | 11.6%(219) |
| Not investigated by Network Rail | OU | 10.5%(198) |
| Agreed in advance between Network Rail and the operator | PL | 7.7%(145) |
| The train due to form it arrived late | YI | 6.6%(124) |
| Not yet investigated | ZW | 6.4%(121) |
| Driver | TG | 5.0%(94) |
| At the train operator's request | TB | 3.6%(69) |
| Passenger taken ill on train | VD | 3.6%(67) |
| Other technical failures (doors, body or interior) | M8 | 2.8%(54) |
All trains in the network
| State | All | Passenger |
|---|---|---|
| Planned | 2,511 | 73 |
| Arrived | 29,049 | 21,744 |
| Cancelled | 1,894 | 922 |
| No arrival reported | 716 | 325 |
Cancelled here is what the signalling feed recorded, including trains cancelled for part of the way. The Cancelled figure at the top counts passenger trains that did not run at all, from National Rail's feed as well, so the two can differ either way.
Stopped short 0
iInferred, not reported: a train turned short on purpose looks the same as one that failed. Passenger trains that had already started.
None on this day. A train cut short on purpose is counted as part cancelled.