Daily performance
28,357 trains20,811 carrying passengers617 part cancelled601 no arrival reported0 stopped short
On time88.0%
of those that arrivedAverage delay2.4min
at their last callCancelled417(2%)
passenger trains that did not runDisruptionDisruption, 0 to 5Cancelled and late trains across the network over the day.0–1Running normally2–3Some delays4–5Serious disruptionMore in the glossary1
low · over the dayBy operator least punctual first · not coloured under 20 trains
| Operator | Trains | On time | Late | Cancelled | Part cancelled | Average delay |
|---|---|---|---|---|---|---|
| Lumo | 22 | 42.9% | 12 | 0 | 1 | 17.9min |
| Grand Central | 20 | 50.0%Too few trains to rate (18 arrived) | 9 | 1 | 1 | 12.8min |
| Eurostar | 24 | 54.2% | 11 | 0 | 0 | 7.8min |
| London North Eastern Railway | 192 | 55.9% | 82 | 2 | 4 | 13.3min |
| Avanti West Coast | 292 | 60.2% | 109 | 9 | 10 | 14.4min |
| Tyne and Wear Metro | 95 | 66.7% | 23 | 23 | 3 | 6.3min |
| CrossCountry | 267 | 67.9% | 68 | 23 | 32 | 9.1min |
| TransPennine Express | 313 | 69.8% | 88 | 2 | 20 | 7.9min |
| Hull Trains | 12 | 75.0%Too few trains to rate (12 arrived) | 3 | 0 | 0 | 7.4min |
| Northern | 2,705 | 80.4% | 504 | 64 | 72 | 3.2min |
| Transport for Wales | 1,093 | 81.6% | 181 | 21 | 90 | 3.6min |
| West Midlands Trains | 1,260 | 82.6% | 190 | 79 | 89 | 3.3min |
| East Midlands Railway | 518 | 84.8% | 76 | 6 | 12 | 3.3min |
| Elizabeth line | 667 | 85.8% | 83 | 45 | 42 | 2.4min |
| Great Western Railway | 1,579 | 87.8% | 184 | 36 | 38 | 2.1min |
| ScotRail | 2,230 | 89.0% | 235 | 28 | 69 | 2.2min |
| South Western Railway | 1,495 | 91.0% | 131 | 6 | 29 | 1.4min |
| Southeastern | 1,332 | 91.1% | 115 | 10 | 31 | 1.9min |
| Gatwick Express | 72 | 91.7% | 6 | 0 | 0 | 3.0min |
| Great Northern | 316 | 92.9% | 22 | 6 | 2 | 1.2min |
| c2c | 222 | 94.0% | 13 | 1 | 6 | 1.9min |
| Thameslink | 597 | 94.7% | 30 | 7 | 21 | 1.5min |
| Southern | 1,395 | 94.9% | 69 | 13 | 33 | 1.2min |
| London Overground | 1,438 | 96.6% | 48 | 4 | 4 | 0.7min |
| Island Line | 66 | 97.0% | 2 | 2 | 0 | 1.3min |
| Greater Anglia | 1,197 | 97.1% | 35 | 2 | 4 | 0.1min |
| Merseyrail | 622 | 97.9% | 13 | 2 | 4 | 0.2min |
| Chiltern Railways | 226 | 99.1% | 2 | 0 | 0 | 0.2min early |
| Heathrow Express | 152 | 100.0% | 0 | 0 | 0 | 0.2min early |
| South Yorkshire Supertram | 37 | 100.0% | 0 | 0 | 0 | 0.2min |
| London Underground | 31 | 100.0%Too few trains to rate (6 arrived) | 0 | 25 | 0 | 1.0min |
| Caledonian Sleeper | 1 | 100.0%Too few trains to rate (1 arrived) | 0 | 0 | 0 | 4.0min early |
Punctuality
| Trains | Ran | Arrived | On time | Average delay |
|---|---|---|---|---|
| Regional and commuter, within 5 minutes | 13,530 | 13,526 | 88.5% | 1.7 min |
| Long distance, within 10 minutes | 5,924 | 5,924 | 86.7% | 4.2 min |
Cancellations passenger trains that did not run at all
| Kind | Trains | Share |
|---|---|---|
| On the day, cause given | 349 | 83.7% |
| On the day, unexplained | 57 | 13.7% |
| National Rail only | 9 | 2.2% |
| Planned or excluded | 2 | 0.5% |
Why every cancelled train, freight included
| Reason | Code | Share |
|---|---|---|
| Cancelled at the freight operator's request, or planned not to run | FL | 17.2%(217) |
| Not investigated by Network Rail | OU | 14.5%(183) |
| Not yet investigated | ZW | 12.3%(156) |
| The train due to form it arrived late | YI | 10.7%(135) |
| Driver | TG | 8.6%(108) |
| Agreed in advance between Network Rail and the operator | PL | 5.0%(63) |
| Delays incurred on non-Network Rail running lines or networks including London Underground | TX | 2.8%(36) |
| Senior Conductor or Train Manager | TH | 2.7%(34) |
| Other technical failures below the solebar | MD | 2.4%(31) |
| Other technical failures (doors, body or interior) | M8 | 2.5%(31) |
All trains in the network
| State | All | Passenger |
|---|---|---|
| Planned | 849 | 57 |
| Arrived | 25,641 | 19,884 |
| Cancelled | 1,266 | 631 |
| No arrival reported | 601 | 239 |
Cancelled here is what the signalling feed recorded, including trains cancelled for part of the way. The Cancelled figure at the top counts passenger trains that did not run at all, from National Rail's feed as well, so the two can differ either way.
Stopped short 0
iInferred, not reported: a train turned short on purpose looks the same as one that failed. Passenger trains that had already started.
None on this day. A train cut short on purpose is counted as part cancelled.