Daily performance
18,096 trains13,161 carrying passengers315 part cancelled340 no arrival reported0 stopped short
On time93.6%
of those that arrivedAverage delay1.2min
at their last callCancelled245(1.9%)
passenger trains that did not runDisruptionDisruption, 0 to 5Cancelled and late trains across the network over the day.0–1Running normally2–3Some delays4–5Serious disruptionMore in the glossary1
low · over the dayBy operator least punctual first · not coloured under 20 trains
| Operator | Trains | On time | Late | Cancelled | Part cancelled | Average delay |
|---|---|---|---|---|---|---|
| Caledonian Sleeper | 6 | 50.0%Too few trains to rate (6 arrived) | 3 | 0 | 0 | 8.7min |
| Eurostar | 30 | 69.2% | 8 | 4 | 0 | 9.5min |
| Grand Central | 18 | 76.5%Too few trains to rate (17 arrived) | 4 | 0 | 1 | 4.4min |
| Lumo | 19 | 84.2%Too few trains to rate (19 arrived) | 3 | 0 | 0 | 5.3min |
| East Midlands Railway | 284 | 85.0% | 40 | 3 | 14 | 3.1min |
| London North Eastern Railway | 161 | 85.3% | 23 | 3 | 2 | 3.8min |
| CrossCountry | 162 | 85.7% | 20 | 6 | 16 | 4.7min |
| Avanti West Coast | 227 | 88.1% | 26 | 7 | 1 | 3.2min |
| Great Western Railway | 920 | 88.5% | 101 | 9 | 29 | 2.1min |
| Elizabeth line | 499 | 89.6% | 47 | 19 | 30 | 1.5min |
| West Midlands Trains | 637 | 90.6% | 55 | 20 | 30 | 1.5min |
| Hull Trains | 12 | 91.7%Too few trains to rate (12 arrived) | 1 | 0 | 0 | 6.2min |
| South Yorkshire Supertram | 25 | 92.0% | 2 | 0 | 0 | 1.0min |
| TransPennine Express | 251 | 92.2% | 19 | 0 | 7 | 1.6min |
| South Western Railway | 1,021 | 92.9% | 69 | 8 | 35 | 1.6min |
| Northern | 1,364 | 93.6% | 84 | 41 | 15 | 1.1min |
| Transport for Wales | 667 | 93.6% | 42 | 2 | 12 | 0.8min |
| Southern | 893 | 93.7% | 55 | 16 | 10 | 1.4min |
| Heathrow Express | 151 | 94.0% | 9 | 2 | 0 | 1.9min |
| Southeastern | 882 | 94.7% | 46 | 7 | 7 | 0.8min |
| ScotRail | 1,119 | 95.6% | 49 | 7 | 4 | 1.1min |
| Tyne and Wear Metro | 65 | 96.8% | 2 | 2 | 0 | 0.5min |
| Greater Anglia | 900 | 97.2% | 24 | 41 | 9 | 0.1min early |
| Thameslink | 447 | 97.3% | 12 | 1 | 6 | 0.6min |
| London Overground | 1,113 | 97.7% | 25 | 7 | 17 | 0.6min |
| Great Northern | 243 | 97.9% | 4 | 18 | 37 | 0.3min |
| Chiltern Railways | 193 | 97.9% | 4 | 0 | 1 | 0.2min |
| Merseyrail | 324 | 98.8% | 4 | 0 | 4 | 0.2min early |
| c2c | 207 | 98.9% | 2 | 6 | 28 | 0.4min |
| Island Line | 60 | 100.0% | 0 | 12 | 0 | 0.2min early |
| London Underground | 5 | 100.0%Too few trains to rate (1 arrived) | 0 | 4 | 0 | 0.0min |
Punctuality
| Trains | Ran | Arrived | On time | Average delay |
|---|---|---|---|---|
| Regional and commuter, within 5 minutes | 8,550 | 8,548 | 93.8% | 0.8 min |
| Long distance, within 10 minutes | 3,796 | 3,795 | 93.2% | 2.2 min |
Cancellations passenger trains that did not run at all
| Kind | Trains | Share |
|---|---|---|
| On the day, cause given | 205 | 83.7% |
| On the day, unexplained | 33 | 13.5% |
| National Rail only | 6 | 2.4% |
| Planned or excluded | 1 | 0.4% |
Why every cancelled train, freight included
| Reason | Code | Share |
|---|---|---|
| Not investigated by Network Rail | OU | 21.5%(169) |
| Agreed in advance between Network Rail and the operator | PL | 13.8%(109) |
| Cancelled at the freight operator's request, or planned not to run | FL | 10.2%(80) |
| Fatalities or injuries caused by being hit by train | XC | 7.1%(56) |
| The train due to form it arrived late | YI | 7.0%(55) |
| Driver | TG | 6.9%(54) |
| Not yet investigated | ZW | 6.1%(48) |
| Fires starting on Network Rail Infrastructure | I9 | 3.5%(28) |
| Other technical failures (doors, body or interior) | M8 | 3.2%(25) |
| At the train operator's request | TB | 1.9%(15) |
All trains in the network
| State | All | Passenger |
|---|---|---|
| Planned | 280 | 20 |
| Arrived | 16,688 | 12,576 |
| Cancelled | 788 | 349 |
| No arrival reported | 340 | 216 |
Cancelled here is what the signalling feed recorded, including trains cancelled for part of the way. The Cancelled figure at the top counts passenger trains that did not run at all, from National Rail's feed as well, so the two can differ either way.
Stopped short 0
iInferred, not reported: a train turned short on purpose looks the same as one that failed. Passenger trains that had already started.
None on this day. A train cut short on purpose is counted as part cancelled.