Daily performance
33,639 trains22,997 carrying passengers774 part cancelled597 no arrival reported2 stopped short
On time89.8%
of those that arrivedAverage delay2.1min
at their last callCancelled564(2.5%)
passenger trains that did not runDisruptionDisruption, 0 to 5Cancelled and late trains across the network over the day.0–1Running normally2–3Some delays4–5Serious disruptionMore in the glossary1
low · over the dayBy operator least punctual first · not coloured under 20 trains
| Operator | Trains | On time | Late | Cancelled | Part cancelled | Average delay |
|---|---|---|---|---|---|---|
| Eurostar | 31 | 50.0% | 13 | 5 | 0 | 11.5min |
| Avanti West Coast | 318 | 67.3% | 100 | 4 | 8 | 9.4min |
| c2c | 358 | 69.0% | 84 | 41 | 48 | 11.6min |
| Hull Trains | 15 | 73.3%Too few trains to rate (15 arrived) | 4 | 0 | 0 | 6.7min |
| Grand Central | 20 | 75.0% | 5 | 0 | 0 | 8.3min |
| London North Eastern Railway | 200 | 75.1% | 47 | 5 | 6 | 6.6min |
| Lumo | 22 | 76.2% | 5 | 0 | 1 | 5.4min |
| CrossCountry | 281 | 81.4% | 49 | 8 | 10 | 5.4min |
| Thameslink | 650 | 83.2% | 67 | 152 | 103 | 4.2min |
| Southeastern | 1,784 | 85.4% | 251 | 35 | 33 | 3.1min |
| TransPennine Express | 313 | 86.0% | 42 | 1 | 11 | 3.3min |
| South Western Railway | 1,611 | 86.8% | 203 | 10 | 58 | 2.5min |
| Caledonian Sleeper | 8 | 87.5%Too few trains to rate (8 arrived) | 1 | 0 | 0 | 0.5min early |
| Northern | 2,754 | 88.2% | 310 | 38 | 83 | 2.0min |
| Elizabeth line | 696 | 88.2% | 74 | 13 | 56 | 2.0min |
| Tyne and Wear Metro | 90 | 88.6% | 10 | 2 | 0 | 1.7min |
| Great Western Railway | 1,712 | 89.3% | 174 | 35 | 48 | 1.9min |
| West Midlands Trains | 1,315 | 90.0% | 125 | 27 | 36 | 1.8min |
| Great Northern | 396 | 90.3% | 38 | 2 | 3 | 1.8min |
| East Midlands Railway | 508 | 90.9% | 45 | 5 | 7 | 2.1min |
| Transport for Wales | 1,072 | 92.5% | 76 | 8 | 47 | 1.2min |
| Southern | 1,684 | 92.6% | 117 | 38 | 62 | 1.8min |
| ScotRail | 2,276 | 93.6% | 140 | 24 | 59 | 1.5min |
| Heathrow Express | 152 | 93.7% | 9 | 11 | 0 | 1.7min |
| London Overground | 1,601 | 95.0% | 76 | 16 | 76 | 1.1min |
| Chiltern Railways | 346 | 95.0% | 16 | 15 | 7 | 0.8min |
| Gatwick Express | 72 | 95.7% | 3 | 2 | 1 | 3.9min |
| Greater Anglia | 1,311 | 95.9% | 54 | 5 | 2 | 0.4min |
| London Underground | 187 | 96.1% | 5 | 53 | 6 | 1.1min |
| Merseyrail | 622 | 98.5% | 9 | 3 | 3 | 0.0min |
| Island Line | 66 | 100.0% | 0 | 2 | 0 | 1.6min early |
| South Yorkshire Supertram | 37 | 100.0% | 0 | 0 | 0 | 0.5min |
Punctuality
| Trains | Ran | Arrived | On time | Average delay |
|---|---|---|---|---|
| Regional and commuter, within 5 minutes | 15,025 | 15,023 | 90.4% | 1.5 min |
| Long distance, within 10 minutes | 6,171 | 6,171 | 88.5% | 3.8 min |
Cancellations passenger trains that did not run at all
| Kind | Trains | Share |
|---|---|---|
| On the day, cause given | 501 | 88.8% |
| On the day, unexplained | 27 | 4.8% |
| Planned or excluded | 21 | 3.7% |
| National Rail only | 15 | 2.7% |
Why every cancelled train, freight included
| Reason | Code | Share |
|---|---|---|
| Cancelled at the freight operator's request, or planned not to run | FL | 17.2%(289) |
| Not investigated by Network Rail | OU | 11.3%(190) |
| Agreed in advance between Network Rail and the operator | PL | 9.6%(161) |
| Points failure (including no fault found) | IB | 7.7%(129) |
| The train due to form it arrived late | YI | 7.2%(121) |
| Not yet investigated | ZW | 6.1%(103) |
| Track circuit failure (including no fault found) | IC | 5.0%(84) |
| At the train operator's request | TB | 4.2%(71) |
| Delays incurred on non-Network Rail running lines or networks including London Underground | TX | 3.5%(58) |
| Other technical failures (doors, body or interior) | M8 | 2.9%(50) |
All trains in the network
| State | All | Passenger |
|---|---|---|
| Planned | 2,481 | 63 |
| Arrived | 28,880 | 21,705 |
| Cancelled | 1,681 | 833 |
| No arrival reported | 597 | 396 |
Cancelled here is what the signalling feed recorded, including trains cancelled for part of the way. The Cancelled figure at the top counts passenger trains that did not run at all, from National Rail's feed as well, so the two can differ either way.