Daily performance
34,242 trains23,040 carrying passengers793 part cancelled561 no arrival reported0 stopped short
On time89.5%
of those that arrivedAverage delay2.3min
at their last callCancelled402(1.7%)
passenger trains that did not runDisruptionDisruption, 0 to 5Cancelled and late trains across the network over the day.0–1Running normally2–3Some delays4–5Serious disruptionMore in the glossary1
low · over the dayBy operator least punctual first · not coloured under 20 trains
| Operator | Trains | On time | Late | Cancelled | Part cancelled | Average delay |
|---|---|---|---|---|---|---|
| Grand Central | 20 | 28.6%Too few trains to rate (14 arrived) | 10 | 2 | 4 | 48.0min |
| Hull Trains | 15 | 30.8%Too few trains to rate (13 arrived) | 9 | 0 | 2 | 26.8min |
| London North Eastern Railway | 201 | 34.2% | 102 | 29 | 17 | 30.8min |
| Lumo | 22 | 42.1%Too few trains to rate (19 arrived) | 11 | 0 | 3 | 20.0min |
| Eurostar | 25 | 52.0% | 12 | 0 | 0 | 11.1min |
| Avanti West Coast | 322 | 69.3% | 93 | 4 | 15 | 9.6min |
| Great Northern | 400 | 72.9% | 95 | 8 | 42 | 4.8min |
| Caledonian Sleeper | 8 | 75.0%Too few trains to rate (8 arrived) | 2 | 0 | 0 | 5.4min |
| TransPennine Express | 320 | 76.7% | 67 | 1 | 32 | 5.6min |
| Thameslink | 651 | 80.5% | 95 | 49 | 114 | 4.4min |
| CrossCountry | 281 | 81.5% | 46 | 11 | 23 | 5.2min |
| London Underground | 189 | 81.6% | 26 | 45 | 2 | 2.8min |
| Northern | 2,755 | 84.5% | 402 | 71 | 97 | 2.6min |
| South Western Railway | 1,614 | 89.0% | 169 | 7 | 72 | 2.0min |
| Southeastern | 1,807 | 89.2% | 191 | 9 | 30 | 2.2min |
| Chiltern Railways | 340 | 89.8% | 34 | 5 | 3 | 2.0min |
| Elizabeth line | 696 | 91.2% | 59 | 5 | 21 | 1.1min |
| Great Western Railway | 1,731 | 91.8% | 136 | 48 | 22 | 1.5min |
| Transport for Wales | 1,066 | 92.1% | 78 | 17 | 62 | 1.5min |
| Southern | 1,691 | 92.2% | 128 | 14 | 46 | 2.0min |
| ScotRail | 2,285 | 92.4% | 170 | 22 | 31 | 1.7min |
| Tyne and Wear Metro | 88 | 93.0% | 6 | 2 | 0 | 1.5min |
| London Overground | 1,604 | 93.1% | 105 | 17 | 74 | 1.4min |
| East Midlands Railway | 507 | 93.5% | 32 | 2 | 9 | 1.4min |
| c2c | 362 | 93.5% | 21 | 3 | 34 | 2.1min |
| Gatwick Express | 72 | 93.9% | 4 | 5 | 1 | 3.9min |
| West Midlands Trains | 1,319 | 94.1% | 76 | 16 | 22 | 1.1min |
| Island Line | 65 | 95.4% | 3 | 2 | 0 | 2.0min |
| Greater Anglia | 1,309 | 95.6% | 57 | 0 | 1 | 0.5min |
| South Yorkshire Supertram | 39 | 97.1% | 1 | 4 | 0 | 0.2min |
| Merseyrail | 622 | 97.7% | 14 | 4 | 13 | 0.1min |
| Heathrow Express | 152 | 100.0% | 0 | 0 | 0 | 0.1min early |
Punctuality
| Trains | Ran | Arrived | On time | Average delay |
|---|---|---|---|---|
| Regional and commuter, within 5 minutes | 15,209 | 15,208 | 89.9% | 1.5 min |
| Long distance, within 10 minutes | 6,177 | 6,177 | 88.4% | 4.2 min |
Cancellations passenger trains that did not run at all
| Kind | Trains | Share |
|---|---|---|
| On the day, cause given | 383 | 95.3% |
| On the day, unexplained | 15 | 3.7% |
| Planned or excluded | 3 | 0.7% |
| National Rail only | 1 | 0.2% |
Why every cancelled train, freight included
| Reason | Code | Share |
|---|---|---|
| Cancelled at the freight operator's request, or planned not to run | FL | 21.1%(335) |
| Not investigated by Network Rail | OU | 11.6%(185) |
| Agreed in advance between Network Rail and the operator | PL | 10.9%(174) |
| The train due to form it arrived late | YI | 9.6%(152) |
| At the train operator's request | TB | 4.2%(67) |
| Not yet investigated | ZW | 3.6%(58) |
| Delays incurred on non-Network Rail running lines or networks including London Underground | TX | 3.3%(52) |
| Broken/ |
IR | 3.1%(49) |
| Fatalities or injuries caused by being hit by train | XC | 3.0%(47) |
| Points failure (including no fault found) | IB | 2.5%(40) |
All trains in the network
| State | All | Passenger |
|---|---|---|
| Planned | 2,519 | 62 |
| Arrived | 29,578 | 21,936 |
| Cancelled | 1,584 | 648 |
| No arrival reported | 561 | 394 |
Cancelled here is what the signalling feed recorded, including trains cancelled for part of the way. The Cancelled figure at the top counts passenger trains that did not run at all, from National Rail's feed as well, so the two can differ either way.
Stopped short 0
iInferred, not reported: a train turned short on purpose looks the same as one that failed. Passenger trains that had already started.
None on this day. A train cut short on purpose is counted as part cancelled.