The railway on 11th September 2026

TrainTimesLive
Menu Close menu

11th September 2026

33,803Trains22,876 carrying passengers
90.6%On timeof those that arrived
1.9 minAverage delayat their last call
875Cancelledplanned ones included
474Part cancelledran for only part of the journey
1,606Never activatedbooked, and never appeared
0Stopped shortdid not reach the last stop

By operator least punctual first

OperatorTrackedOn time LateCancelledPart cancelledAverage delay
Eurostar 29 69% 9 0 0 6 min
Grand Central 20 75% 5 0 0 6.7 min
Gatwick Express 72 77.4% 14 6 4 6.3 min
CrossCountry 280 77.7% 56 19 10 7.5 min
Avanti West Coast 316 79.4% 63 4 6 6.8 min
East Midlands Railway 500 81.9% 84 24 14 4.5 min
Thameslink 650 82% 95 43 78 3.5 min
Elizabeth line 602 85.3% 82 20 24 2.1 min
Great Western Railway 1,620 86.8% 208 33 16 2.4 min
London North Eastern Railway 200 87.8% 24 2 1 3.5 min
Great Northern 398 88.2% 36 88 6 2.2 min
Southeastern 1,792 88.8% 189 43 57 2.3 min
Southern 1,504 89.2% 154 51 33 2.7 min
TransPennine Express 319 90.3% 29 11 9 2.5 min
c2c 235 91.4% 19 10 6 2 min
Northern 2,754 92% 214 31 36 1.3 min
South Western Railway 1,611 92.1% 124 9 34 1.9 min
West Midlands Trains 1,294 92.1% 100 24 8 1.3 min
Transport for Wales 1,036 92.2% 77 31 20 1.5 min
London Overground 1,608 92.7% 99 188 74 1.5 min
Chiltern Railways 349 92.8% 25 0 1 1.6 min
Greater Anglia 1,257 93.7% 78 22 6 1.1 min
ScotRail 2,275 95.2% 107 17 13 0.9 min
Tyne and Wear Metro 87 95.2% 4 2 0 0.9 min
London Underground 216 96.2% 5 83 3 0.5 min
Heathrow Express 152 96.2% 3 74 0 5 min
Merseyrail 622 97.2% 17 2 9 0.4 min
Island Line 52 100% 0 0 0 0.8 min early
South Yorkshire Supertram 37 100% 0 0 0 0.1 min

Punctuality

TrainsRan ArrivedOn time Average delay
Other (5 min) 14,943 14,936 91.5% 1.2 min
Long distance (10 min) 6,080 6,078 88.4% 3.8 min

Cancellations

KindTrains Share
Attributed 702 80.2%
Unexplained 130 14.9%
Reported by Darwin 36 4.1%
Planned 7 0.8%

Why most common first

ReasonCode Share
Train cancelled at FOC request or planned not to run FL 19.2% (339)
Uninvestigated Cancellations System Roll-Ups only ZW 10.3% (182)
Delays not investigated by Network Rail OU 9.3% (164)
Late arrival of booked inward stock YI 8.3% (146)
Exclusion commercially agreed and documented between Network Rail and Train Operator PL 7.8% (137)
Delays incurred on non-Network Rail running lines or networks including London Underground TX 4% (70)
Train cancelled or delayed at Train Operator's request TB 3.5% (62)
Fatalities or injuries caused by being hit by train XC 3.5% (62)
Late arrival of booked inward stock YI 2.8% (49)
Driver TG 2.7% (47)
Fatalities or injuries caused by being hit by train XC 1.9% (33)
External utility incident including gas, water mains and overhead power lines XM 1.8% (31)
External utility incident including gas, water mains and overhead power lines XM 1.5% (26)
Other technical failures above the Solebar M8 1.4% (24)
Uninvestigated Cancellations System Roll-Ups only ZW 1.2% (22)
Depot operating problem MU 1.2% (22)
Points failure (including no fault found) IB 1% (17)
WTT Schedule or LTP process including incorrect simplifiers QA 0.8% (14)
Train cancelled or delayed at Train Operator's request TB 0.8% (14)
Track defects other than rail defects IS 0.7% (13)
Train-crew rostering problem TI 0.7% (12)
Other Passenger Train Operating Company causes TZ 0.7% (12)
Track defects other than rail defects IS 0.7% (12)
Uninvestigated Late Start System Roll-Ups only ZX 0.6% (11)
Driver TG 0.6% (10)
Trespass including non-intentional XA 0.6% (10)
Points failure (including no fault found) IB 0.5% (8)
Disorder, drunks or trespass VA 0.5% (8)
No Cause Identified After Full Investigation by Both Parties ZU 0.5% (8)
Planned underpowered or shortformed service or vehicle MS 0.5% (8)
Track circuit failure (including no fault found) IC 0.4% (7)
Time lost en-route believed to be Operator cause and information required from Operator TO 0.4% (7)
Other technical failures below the solebar MD 0.4% (7)
Exclusion commercially agreed and documented between Network Rail and Train Operator PL 0.4% (7)
Other technical failures above the Solebar M8 0.3% (6)
Broken/cracked/twisted/buckled/flawed rail IR 0.3% (6)
Cancellation of a duplicate or erroneous schedule or an identified duplicate, false or erroneous delay PJ 0.3% (6)
Other technical failures below the solebar MD 0.3% (6)
Lost path - following another later running train YD 0.3% (6)
Other Passenger Train Operating Company causes TZ 0.3% (5)

All trains in the network

StateAll Passenger
Arrived 27,761 21,529
Planned 2,672 87
Cancelled 1,764 839
Never activated 1,606 421