The railway on 9th October 2026

TrainTimesLive
Menu Close menu

9th October 2026

34,046Trains23,076 carrying passengers
90.4%On timeof those that arrived
2.1 minAverage delayat their last call
548Cancelledplanned ones included
681Part cancelledran for only part of the journey
1,645Never activatedbooked, and never appeared
0Stopped shortdid not reach the last stop

By operator least punctual first

OperatorTrackedOn time LateCancelledPart cancelledAverage delay
Eurostar 29 48.3% 15 0 0 17.3 min
Grand Central 20 55% 9 0 0 15.9 min
London North Eastern Railway 200 64.1% 69 4 4 12.5 min
Avanti West Coast 317 67.7% 95 4 19 8.4 min
CrossCountry 280 72.7% 68 2 29 7.5 min
TransPennine Express 319 77.4% 66 0 27 5.3 min
Northern 2,757 82.1% 461 91 90 2.8 min
East Midlands Railway 500 84.7% 74 3 14 3.3 min
Great Northern 400 85.9% 50 18 28 3.3 min
Thameslink 648 87.3% 74 8 58 2.6 min
London Underground 201 89.1% 14 70 2 1.6 min
South Western Railway 1,615 89.6% 142 168 87 4.2 min
West Midlands Trains 1,318 90.4% 124 8 18 1.6 min
Transport for Wales 1,061 91.3% 85 8 75 1.4 min
Southeastern 1,807 92.5% 133 17 20 1.6 min
c2c 366 92.5% 26 9 12 1.9 min
Chiltern Railways 349 92.5% 26 0 1 1.5 min
Great Western Railway 1,720 92.6% 121 48 27 1.3 min
Gatwick Express 72 92.9% 5 0 2 4 min
Southern 1,689 93.4% 106 27 52 1.7 min
ScotRail 2,274 94.9% 115 13 16 1.2 min
London Overground 1,610 95.2% 74 25 44 1.1 min
Elizabeth line 693 96.2% 25 3 30 0.7 min
Tyne and Wear Metro 88 96.5% 3 0 3 1.1 min
Greater Anglia 1,309 97.3% 35 6 16 0.3 min
Heathrow Express 152 99.3% 1 2 0 0.2 min
Merseyrail 622 99.5% 3 6 6 0.2 min
Island Line 52 100% 0 0 0 0.3 min early
South Yorkshire Supertram 37 100% 0 0 0 0.4 min

Punctuality

TrainsRan ArrivedOn time Average delay
Long distance (10 min) 6,220 6,216 88.7% 4 min
Other (5 min) 15,148 15,141 91.1% 1.4 min

Cancellations

KindTrains Share
Attributed 516 94.2%
Unexplained 20 3.6%
Reported by Darwin 11 2%
Planned 1 0.2%

Why most common first

ReasonCode Share
Train cancelled at FOC request or planned not to run FL 22.3% (378)
Exclusion commercially agreed and documented between Network Rail and Train Operator PL 9.7% (164)
Delays not investigated by Network Rail OU 9.4% (159)
Late arrival of booked inward stock YI 7% (119)
Fatalities or injuries caused by being hit by train XC 6.4% (108)
Delays incurred on non-Network Rail running lines or networks including London Underground TX 4.4% (75)
Overhead line/3rd rail defect I1 4.1% (70)
Uninvestigated Cancellations System Roll-Ups only ZW 3.7% (63)
Driver TG 2.7% (46)
Train cancelled or delayed at Train Operator's request TB 1.9% (33)
Late arrival of booked inward stock YI 1.7% (29)
Uninvestigated Cancellations System Roll-Ups only ZW 1.7% (28)
Fatalities or injuries caused by being hit by train XC 1.7% (28)
Train cancelled or delayed at Train Operator's request TB 1.2% (21)
Other technical failures below the solebar MD 1.2% (20)
Overhead line/3rd rail defect I1 0.8% (14)
Driver TG 0.8% (13)
Other technical failures above the Solebar M8 0.8% (13)
Track circuit failure (including no fault found) IC 0.6% (11)
Animal Strike or Incursion within the control of Network Rail I8 0.6% (10)
Points failure (including no fault found) IB 0.6% (10)
Time lost en-route believed to be Operator cause and information required from Operator TO 0.6% (10)
Other Passenger Train Operating Company causes TZ 0.5% (9)
Senior Conductor or Train Manager TH 0.5% (9)
Other technical failures below the solebar MD 0.5% (9)
Failure to maintain vegetation within network boundaries JP 0.5% (8)
Train-crew rostering problem TI 0.4% (7)
Exclusion commercially agreed and documented between Network Rail and Train Operator PL 0.4% (7)
Points failure (including no fault found) IB 0.4% (7)
Signalling functional power supply failure IE 0.4% (7)
Planned underpowered or shortformed service or vehicle MS 0.4% (6)
Engineer's on-track equipment failure outside possession MV 0.4% (6)
Axle Counter Failure J3 0.3% (5)
Track circuit failure (including no fault found) IC 0.3% (5)
Passenger taken ill on train VD 0.3% (5)
Level crossing faults and failure ID 0.3% (5)
Late arrival of booked inward train-crew YJ 0.3% (5)
Other FOC causes including mishaps FZ 0.2% (4)
Depot operating problem MU 0.2% (4)
Door and Door system faults M7 0.2% (4)

All trains in the network

StateAll Passenger
Arrived 28,194 21,829
Planned 2,512 63
Cancelled 1,695 776
Never activated 1,645 408