The railway on 11th October 2026

TrainTimesLive
Menu Close menu

11th October 2026

18,923Trains13,844 carrying passengers
93.4%On timeof those that arrived
1.2 minAverage delayat their last call
241Cancelledplanned ones included
356Part cancelledran for only part of the journey
793Never activatedbooked, and never appeared
0Stopped shortdid not reach the last stop

By operator least punctual first

OperatorTrackedOn time LateCancelledPart cancelledAverage delay
Avanti West Coast 133 80.3% 26 0 1 4.9 min
London Underground 153 82% 20 42 0 2.4 min
Gatwick Express 66 84.1% 7 21 1 3.4 min
East Midlands Railway 299 84.9% 42 7 14 3.6 min
Southern 1,055 86.7% 132 9 56 2.8 min
London North Eastern Railway 162 89.5% 17 0 0 2.3 min
TransPennine Express 273 90.2% 26 0 9 2.3 min
Transport for Wales 673 90.6% 62 6 11 1.5 min
CrossCountry 172 92.4% 12 5 9 3.2 min
Great Western Railway 950 92.8% 65 22 21 1.2 min
South Western Railway 1,224 93% 83 12 29 1.1 min
Northern 1,280 93.2% 85 20 12 1 min
West Midlands Trains 638 93.8% 36 27 31 1.1 min
Southeastern 891 94.3% 50 8 13 1.1 min
Heathrow Express 151 95.1% 7 7 1 1.1 min
Thameslink 446 95.4% 20 6 8 1.2 min
London Overground 1,294 95.7% 54 14 38 0.6 min
ScotRail 1,086 96.1% 39 15 73 0.9 min
Elizabeth line 509 96.3% 18 9 17 0.3 min
Tyne and Wear Metro 64 96.9% 2 0 0 on time
Greater Anglia 816 97.4% 21 1 1 0.1 min early
Great Northern 240 98.3% 4 2 7 0.1 min early
Chiltern Railways 193 98.4% 3 0 0 0.6 min
Merseyrail 448 99.1% 4 2 0 0.8 min early
c2c 143 100% 0 2 0 0.6 min
Island Line 46 100% 0 0 0 0.2 min early
South Yorkshire Supertram 25 100% 0 0 0 0.3 min early

Punctuality

TrainsRan ArrivedOn time Average delay
Long distance (10 min) 3,941 3,941 92.6% 2.4 min
Other (5 min) 9,045 9,045 93.8% 0.6 min

Cancellations

KindTrains Share
Attributed 207 85.9%
Unexplained 27 11.2%
Planned 6 2.5%
Reported by Darwin 1 0.4%

Why most common first

ReasonCode Share
Delays not investigated by Network Rail OU 17.7% (136)
Exclusion commercially agreed and documented between Network Rail and Train Operator PL 16.1% (124)
Train cancelled at FOC request or planned not to run FL 10% (77)
Delays incurred on non-Network Rail running lines or networks including London Underground TX 6.4% (49)
Uninvestigated Cancellations System Roll-Ups only ZW 5.9% (45)
Uninvestigated Cancellations System Roll-Ups only ZW 4.2% (32)
Late arrival of booked inward stock YI 3.8% (29)
Driver TG 3.4% (26)
Track circuit failure (including no fault found) IC 3.1% (24)
Track defects other than rail defects IS 2.9% (22)
Train cancelled or delayed at Train Operator's request TB 2.5% (19)
Points failure (including no fault found) IB 1.8% (14)
Track circuit failure (including no fault found) IC 1.7% (13)
Driver TG 1.6% (12)
Other technical failures above the Solebar M8 1.2% (9)
Train cancelled or delayed at Train Operator's request TB 1.2% (9)
Senior Conductor or Train Manager TH 1% (8)
Cancellation of a duplicate or erroneous schedule or an identified duplicate, false or erroneous delay PJ 1% (8)
Possession over-run from planned work I5 0.9% (7)
Delays not investigated by Network Rail OU 0.8% (6)
Trespass including non-intentional XA 0.8% (6)
Other technical failures below the solebar MD 0.8% (6)
Depot operating problem MU 0.7% (5)
Senior Conductor or Train Manager TH 0.7% (5)
Late arrival of booked inward stock YI 0.5% (4)
Vandalism or theft VB 0.5% (4)
Door and Door system faults M7 0.5% (4)
Time lost en-route believed to be Operator cause and information required from Operator TO 0.5% (4)
Track defects other than rail defects IS 0.5% (4)
Safety related incident caused by maintenance or infrastructure staff oversight or error JL 0.4% (3)
Possession over-run from planned work I5 0.4% (3)
Train-crew rostering problem TI 0.4% (3)
Brake and brake system faults including wheel flats MN 0.4% (3)
Other technical failures above the Solebar M8 0.4% (3)
Other technical failures below the solebar MD 0.4% (3)
Passenger taken ill on train VD 0.3% (2)
Confirmed train cab based safety system fault including GSM-R M0 0.3% (2)
Broken/cracked/twisted/buckled/flawed rail IR 0.3% (2)
Confirmed train borne safety system faults (not cab based) MT 0.3% (2)
Points failure (including no fault found) IB 0.3% (2)

All trains in the network

StateAll Passenger
Arrived 16,874 13,252
Never activated 793 224
Cancelled 769 345
Planned 487 23