The railway on 12th October 2026

TrainTimesLive
Menu Close menu

12th October 2026

33,400Trains22,889 carrying passengers
90.7%On timeof those that arrived
2 minAverage delayat their last call
308Cancelledplanned ones included
574Part cancelledran for only part of the journey
1,387Never activatedbooked, and never appeared
0Stopped shortdid not reach the last stop

By operator least punctual first

OperatorTrackedOn time LateCancelledPart cancelledAverage delay
Eurostar 25 52% 12 0 0 13.8 min
Avanti West Coast 317 57.9% 120 11 21 11.7 min
CrossCountry 277 77% 62 2 5 6.8 min
Gatwick Express 72 80% 14 0 2 6.4 min
London North Eastern Railway 200 81.8% 36 2 0 4.7 min
South Western Railway 1,617 84.4% 235 46 65 2.8 min
East Midlands Railway 502 84.9% 73 0 17 3.3 min
Great Northern 397 87.3% 49 3 9 2.6 min
TransPennine Express 313 88.4% 34 6 13 3 min
Northern 2,745 88.5% 304 37 64 1.9 min
Great Western Railway 1,675 88.5% 181 55 45 2.3 min
Elizabeth line 691 89.2% 68 16 44 1.6 min
Thameslink 652 89.9% 61 2 48 2.5 min
Island Line 52 90.5% 4 4 10 7.3 min
West Midlands Trains 1,315 90.8% 116 11 39 1.5 min
Southeastern 1,796 91.6% 149 10 16 1.7 min
Southern 1,684 92.7% 117 20 51 1.8 min
Transport for Wales 1,060 92.8% 73 8 38 1.4 min
Greater Anglia 1,301 93.9% 78 17 10 1.3 min
ScotRail 2,205 94.5% 120 3 19 1.3 min
Heathrow Express 152 95.3% 7 4 0 1.8 min
c2c 362 95.8% 15 0 9 1.7 min
Chiltern Railways 346 97.1% 10 0 4 0.5 min
London Overground 1,600 97.2% 44 21 35 0.8 min
London Underground 175 97.4% 4 22 0 0.4 min
Tyne and Wear Metro 87 97.7% 2 0 0 0.6 min
Merseyrail 620 99.5% 3 1 6 0.1 min early
South Yorkshire Supertram 37 100% 0 0 0 on time

Punctuality

TrainsRan ArrivedOn time Average delay
Long distance (10 min) 6,266 6,265 87.4% 3.9 min
Other (5 min) 15,236 15,231 92% 1.2 min

Cancellations

KindTrains Share
Attributed 268 87%
Unexplained 35 11.4%
Reported by Darwin 4 1.3%
Planned 1 0.3%

Why most common first

ReasonCode Share
Train cancelled at FOC request or planned not to run FL 22% (302)
Delays not investigated by Network Rail OU 14% (193)
Exclusion commercially agreed and documented between Network Rail and Train Operator PL 10.7% (147)
Late arrival of booked inward stock YI 6.2% (85)
Uninvestigated Cancellations System Roll-Ups only ZW 5.1% (70)
Train cancelled or delayed at Train Operator's request TB 3.2% (44)
Points failure (including no fault found) IB 2.5% (35)
Fatalities or injuries caused by being hit by train XC 2.3% (32)
WTT Schedule or LTP process including incorrect simplifiers QA 2% (27)
Late arrival of booked inward stock YI 1.9% (26)
Fatalities or injuries caused by being hit by train XC 1.9% (26)
Trespass including non-intentional XA 1.8% (25)
Delays incurred on non-Network Rail running lines or networks including London Underground TX 1.8% (25)
Depot operating problem MU 1.8% (25)
Uninvestigated Cancellations System Roll-Ups only ZW 1.5% (20)
Driver TG 1.3% (18)
Points failure (including no fault found) IB 1% (14)
Trespass including non-intentional XA 1% (14)
Other technical failures below the solebar MD 0.9% (12)
Other technical failures above the Solebar M8 0.8% (11)
Track circuit failure (including no fault found) IC 0.7% (9)
Driver TG 0.6% (8)
Possession over-run from planned work I5 0.6% (8)
Senior Conductor or Train Manager TH 0.6% (8)
Other Passenger Train Operating Company causes TZ 0.6% (8)
Uninvestigated Late Start System Roll-Ups only ZX 0.6% (8)
Delays not investigated by Network Rail OU 0.5% (7)
Other technical failures below the solebar MD 0.5% (7)
Train cancelled or delayed at Train Operator's request TB 0.5% (7)
AC/DC trip (including no fault or cause found) I2 0.4% (6)
Flooding not due to exceptional weather JK 0.4% (6)
Cancellation of a duplicate or erroneous schedule or an identified duplicate, false or erroneous delay PJ 0.4% (5)
Animal Strike or Incursion within the control of Network Rail I8 0.4% (5)
Axle Counter Failure J3 0.4% (5)
External trees, buildings or structures encroaching or falling onto infrastructure XO 0.3% (4)
Senior Conductor or Train Manager TH 0.3% (4)
Diesel loco failure, defect, attention MC 0.3% (4)
Passenger taken ill on train VD 0.3% (4)
Train cancelled at FOC request or planned not to run FL 0.3% (4)
Passenger taken ill on train VD 0.3% (4)

All trains in the network

StateAll Passenger
Arrived 27,977 21,888
Planned 2,429 59
Never activated 1,387 398
Cancelled 1,374 503
En route 223 41
Activated 10 0